📞 +91 98200 30685 ✉️
RERA: A51800043517

MOHAN HEIGHTS -PHASE 1

by BHAVANI ENTERPRISES Partnership
Certificate Signed P51700004730
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700004730
Registration No.
REA51700010179
Registration Date
2017-08-09
Developer
BHAVANI ENTERPRISES Partnership
Architect
Arc Vijay Pandey
Project Bank
RBL Bank Limited
Proposed Possession
2018-03-31
Revised Possession
2018-03-31
Extended Possession
2019-03-31
Units Sold
0
Buildings
3
Project Area
3250.00 sq.m
Total FSI
3813.50
Approved FSI
3813.50
MahaRERA QR
MOHAN HEIGHTS -PHASE 1
MahaRERA — P51700004730
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking2
📅Completion2018-09-18
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking5
📅Completion2018-09-18
🏗️Proposed Floors10
Sanctioned10
🅿️Closed Parking10
📅Completion2018-09-18

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 27.950000762939453 0 0 0
0%
1Bhk 28.6200008392334 0 0 0
0%
1Bhk 29.6200008392334 0 0 0
0%
1Bhk 29.700000762939453 0 0 0
0%
1Bhk 29.829999923706055 0 0 0
0%
1Bhk 30.299999237060547 0 0 0
0%
1Bhk 33.63999938964844 0 0 0
0%
1Bhk 43.7400016784668 0 0 0
0%
1Bhk 44.02000045776367 0 0 0
0%
2Bhk 41.95000076293945 0 0 0
0%
2Bhk 42.939998626708984 0 0 0
0%
Shop 8.359999656677246 0 0 0
0%
Shop 9.289999961853027 0 0 0
0%
Shop 10.680000305175781 0 0 0
0%
Shop 13.0 0 0 0
0%
Shop 13.470000267028809 0 0 0
0%
Shop 14.859999656677246 0 0 0
0%
Shop 15.329999923706055 0 0 0
0%
Shop 15.59000015258789 0 0 0
0%
Shop 27.40999984741211 0 0 0
0%
Shop 27.8700008392334 0 0 0
0%

Wing A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.64 14 14 0
100%
1 BHK 43.74 7 6 1
86%
1 BHK 44.02 7 7 0
100%
SHOP 10.68 1 1 0
100%
SHOP 13.47 1 1 0
100%
SHOP 14.86 1 1 0
100%
SHOP 15.33 1 1 0
100%
SHOP 15.59 1 0 1
0%
SHOP 27.87 1 1 0
100%

Wing B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 27.95 7 7 0
100%
1 BHK 28.62 7 7 0
100%
1 BHK 29.62 7 7 0
100%
1 BHK 29.83 7 7 0
100%
1 BHK 30.3 7 6 1
86%
2 BHK 41.95 7 6 1
86%
SHOP 8.36 2 2 0
100%
SHOP 9.29 1 1 0
100%
SHOP 13.0 2 2 0
100%
SHOP 27.41 1 1 0
100%

Wing C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.7 16 15 1
94%
2 BHK 42.94 16 11 5
69%

Construction Progress

WING A

Basement (if any)100%

Wing A

Excavation100%

WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING A

Plinth100%
Podiums (if any) 0%

Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING B

Basement (if any)100%

Wing B

Excavation100%

WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING B

Plinth100%
Podiums (if any) 0%

Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING C

Basement (if any)100%

Wing C

Excavation100%

WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING C

Plinth100%
Podiums (if any) 0%

Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 90%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 90%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.