📞 +91 98200 30685 ✉️
RERA: A51800043517

MOHAN HEIGHTS PHASE-II

by BHAVANI ENTERPRISES Partnership
Certificate Signed P51700004772
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700004772
Registration No.
REA51700010959
Registration Date
2025-07-08
Developer
BHAVANI ENTERPRISES Partnership
Architect
Arc Vijay Pandey
Project Bank
RBL Bank Limited
Proposed Possession
2020-03-31
Revised Possession
2020-03-31
Extended Possession
2025-03-31
Total Units
99
Units Sold
56 (57%)
Buildings
3
Project Area
2180.00 sq.m
Total FSI
2891.27
Approved FSI
2091.27
MahaRERA QR
MOHAN HEIGHTS PHASE-II
MahaRERA — P51700004772
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
🏠Habitable7
🔢Total Units35
🏡Residential30
🏢Non-Residential5
🅿️Closed Parking1
📅Completion2020-03-31
🏗️Proposed Floors8
Sanctioned8
🏠Habitable7
🔢Total Units48
🏡Residential48
📅Completion2020-03-31
🏗️Proposed Floors8
Sanctioned8
🏠Habitable7
🔢Total Units16
🏡Residential16
📅Completion2021-09-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 21.829999923706055 0 0 0
0%
1Bhk 25.06999969482422 0 0 0
0%
1Bhk 25.520000457763672 0 0 0
0%
1Bhk 25.920000076293945 0 0 0
0%
1Bhk 27.200000762939453 0 0 0
0%
1Bhk 27.670000076293945 0 0 0
0%
1Bhk 29.09000015258789 0 0 0
0%
2Bhk 33.689998626708984 0 0 0
0%
Alloted 25.520000457763672 0 0 0
0%
Alloted 25.920000076293945 0 0 0
0%
Alloted 27.200000762939453 0 0 0
0%
Alloted 27.670000076293945 0 0 0
0%
Alloted 29.09000015258789 0 0 0
0%
Shop 11.260000228881836 0 0 0
0%
Shop 15.59000015258789 0 0 0
0%
Shop 22.079999923706055 0 0 0
0%

Wing A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 25.92 16 10 6
62%
1 BHK 27.2 7 4 3
57%
1 BHK 29.09 7 2 5
29%
SHOP 11.26 2 1 1
50%
SHOP 15.59 2 1 1
50%
Shop 22.08 1 0 1
0%

Wing B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 25.07 8 7 1
88%
1 BHK 25.52 8 4 4
50%
1 BHK 25.92 24 11 13
46%
2 BHK 33.69 8 3 5
38%

Wing C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 21.83 8 5 3
62%
1 BHK 27.67 8 3 5
38%

Construction Progress

WING A

Basement (if any)100%

Wing A

Excavation100%

WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%

Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate70%

WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing84%

WING A

Plinth100%
Podiums (if any) 0%

Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

WING A

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING B

Basement (if any)100%

Wing B

Excavation100%

WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%

Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate80%

WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%

Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

WING B

Plinth100%
Podiums (if any) 0%

Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises80%

WING B

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80%

WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING C

Basement (if any)100%

Wing C

Excavation100%

WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%

Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate40%

WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%

Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing76%

WING C

Plinth100%
Podiums (if any) 0%

Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises80%

WING C

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80%

WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Wing C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.