📞 +91 98200 30685 ✉️
RERA: A51800043517

Mohan Ritteka

by SHREE KRISHNA ENTERPRISES Partnership
Certificate Signed P51700004103
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700004103
Registration No.
REA51700009176
Registration Date
2017-08-08
Developer
SHREE KRISHNA ENTERPRISES Partnership
Architect
P H Hotwani
Proposed Possession
2018-03-31
Revised Possession
2018-03-31
Extended Possession
2019-03-31
Units Sold
0
Buildings
3
Project Area
3232.41 sq.m
Total FSI
3232.41
Approved FSI
3232.41
MahaRERA QR
Mohan Ritteka
MahaRERA — P51700004103
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors11
Sanctioned11
⬇️Basements1
🅿️Closed Parking14
📅Completion2018-03-31
🏗️Proposed Floors11
Sanctioned11
⬇️Basements1
🅿️Closed Parking16
📅Completion2018-03-31
🏗️Proposed Floors11
Sanctioned11
⬇️Basements1
🅿️Closed Parking10
📅Completion2018-03-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 28.389999389648438 0 0 0
0%
1Bhk 28.920000076293945 0 0 0
0%
1Bhk 30.309999465942383 0 0 0
0%
1Bhk 30.56999969482422 0 0 0
0%
1Bhk 31.350000381469727 0 0 0
0%
1Bhk 31.43000030517578 0 0 0
0%
1Bhk 31.520000457763672 0 0 0
0%
1Bhk 31.809999465942383 0 0 0
0%
1Bhk 31.84000015258789 0 0 0
0%
1Bhk 32.43000030517578 0 0 0
0%
1Bhk 32.810001373291016 0 0 0
0%
1Bhk 35.11000061035156 0 0 0
0%
2Bhk 36.59000015258789 0 0 0
0%
2Bhk 36.83000183105469 0 0 0
0%
2Bhk 40.849998474121094 0 0 0
0%
2Bhk 43.220001220703125 0 0 0
0%
2Bhk 43.7400016784668 0 0 0
0%
2Bhk 44.02000045776367 0 0 0
0%
2Bhk 44.220001220703125 0 0 0
0%
2Bhk 44.290000915527344 0 0 0
0%
2Bhk 44.75 0 0 0
0%
2Bhk 47.08000183105469 0 0 0
0%
3Bhk 49.40999984741211 0 0 0
0%
3Bhk 52.95000076293945 0 0 0
0%
3Bhk 53.599998474121094 0 0 0
0%
3Bhk 53.95000076293945 0 0 0
0%

A Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 40.85 4 4 0
100%
2 BHK 43.74 4 4 0
100%
2 BHK 44.22 4 4 0
100%
2 BHK 44.29 4 4 0
100%
3 BHK 49.41 4 4 0
100%
3 BHK 52.95 4 4 0
100%
3 BHK 53.6 4 4 0
100%
3 BHK 53.95 4 4 0
100%

B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 28.92 4 4 0
100%
1 BHK 31.43 4 4 0
100%
1 BHK 31.52 4 4 0
100%
1 BHK 31.81 4 4 0
100%
1 BHK 31.84 4 4 0
100%
1 BHK 32.43 4 4 0
100%
1 BHK 32.81 4 4 0
100%
1 BHK 35.11 4 4 0
100%
2 BHK 43.22 4 4 0
100%
2 BHK 44.02 4 4 0
100%
2 BHK 44.75 4 4 0
100%
2 BHK 47.08 4 4 0
100%

C Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 28.39 8 8 0
100%
1 BHK 30.31 4 4 0
100%
1 BHK 30.57 4 4 0
100%
1 BHK 31.35 8 8 0
100%
2 BHK 36.59 4 4 0
100%
2 BHK 36.83 4 4 0
100%

Construction Progress

A Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

B Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

C Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.