RERA: A51800043517

Navrang Crystal

by OXFORD PLANET REALTY LLP Partnership
Certificate Signed P51800048561
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800048561
Registration No.
REA51800126127
Registration Date
2023-01-06
Developer
OXFORD PLANET REALTY LLP Partnership
Architect
Space Moulders
Project Bank
HDFC BANK
Proposed Possession
2025-11-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
189
Units Sold
177 (94%)
Buildings
3
Project Area
2583.64 sq.m
Total FSI
12507.14
Approved FSI
11182.09
MahaRERA QR
Navrang Crystal
MahaRERA — P51800048561
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors24
Sanctioned24
🏠Habitable22
🔢Total Units57
🏡Residential57
⬇️Basements1
📅Completion2025-11-30
🏗️Proposed Floors24
Sanctioned24
🏠Habitable22
🔢Total Units49
🏡Residential49
⬇️Basements1
📅Completion2025-11-30
🏗️Proposed Floors24
Sanctioned24
🏠Habitable22
🔢Total Units83
🏡Residential83
⬇️Basements1
📅Completion2025-11-30

Apartment Configurations

A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 38.37 40 31 9
78%
2 BHK 60.76 16 7 9
44%
3 BHK 84.83 1 0 1
0%

B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 40.18 20 13 7
65%
1 BHK 40.51 21 10 11
48%
1 BHK 45.24 1 0 1
0%
2 BHK 60.85 7 6 1
86%

C Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 40.19 20 7 13
35%
1 BHK 40.32 21 14 7
67%
1 BHK 43.66 2 0 2
0%
2 BHK 59.09 21 16 5
76%
2 BHK 59.27 19 14 5
74%

Construction Progress

A wing

Basement (if any)0%

A Wing

Excavation100%

A wing

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate6%

A wing

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.77%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises34%

A wing

Plinth100%
Podiums (if any) 0%

A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises7%

A wing

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.56%

A wing

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

A Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing43%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure86%

B Wing

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate38%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.77%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises33%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises7%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.56%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing43%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure86%

C Wing

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate6%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.77%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises34%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises5%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.58%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing43%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure86%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.