Project Information

RERA Certificate No.
P51800048561
Registration No.
REA51800126127
Registration Date
2023-01-06
Developer
Oxford Planet Realty Llp Partnership
Architect
Space Moulders
Project Bank
HDFC BANK
Proposed Possession
2025-11-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
189
Units Sold
183 (97%)
Buildings
3
Project Area
2583.64 sq.m
Total FSI
12507.14
Approved FSI
11182.09
MahaRERA QR
Navrang Crystal
MahaRERA โ€” P51800048561
Scan to verify on MahaRERA portal

Wing-wise Details

๐Ÿ—๏ธProposed Floors24
โœ…Sanctioned24
๐Ÿ Habitable22
๐Ÿ”ขTotal Units57
๐ŸกResidential57
โฌ‡๏ธBasements1
๐Ÿ“…Completion2025-11-30
๐Ÿ—๏ธProposed Floors24
โœ…Sanctioned24
๐Ÿ Habitable22
๐Ÿ”ขTotal Units49
๐ŸกResidential49
โฌ‡๏ธBasements1
๐Ÿ“…Completion2025-11-30
๐Ÿ—๏ธProposed Floors24
โœ…Sanctioned24
๐Ÿ Habitable22
๐Ÿ”ขTotal Units83
๐ŸกResidential83
โฌ‡๏ธBasements1
๐Ÿ“…Completion2025-11-30

Apartment Configurations

A Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.3740319
78%
2 BHK60.761679
44%
3 BHK84.83101
0%

B Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK40.1820137
65%
1 BHK40.51211011
48%
1 BHK45.24101
0%
2 BHK60.85761
86%

C Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK40.1920713
35%
1 BHK40.3221147
67%
1 BHK43.66202
0%
2 BHK59.0921165
76%
2 BHK59.2719145
74%

Construction Progress

A Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate6%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises34%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises7%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.56%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing43%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure86%

A wing

Basement (if any)0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.77%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

B Wing

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.77%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate38%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises33%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises7%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.56%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing43%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure86%

C Wing

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.77%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises34%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises5%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.58%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing43%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure86%

RERA Registered Amenities

โฌœAggregate area of recreational Open Space
โฌœCommunity Buildings
โœ…Electrical Meter Room, Sub-Station, Receiving Station
โœ…Energy management
โœ…Fire Protection And Fire Safety Requirements
โœ…Landscaping & Tree Planting
โฌœOpen Parking
โœ…Sewerage (Chamber, Lines, Septic Tank , STP)
โœ…Solid Waste Management And Disposal
โœ…Storm Water Drains
โฌœStreet Lighting
โœ…Treatment And Disposal Of Sewage And Sullage Water
โœ…Water Conservation, Rain water Harvesting
โœ…Water Supply
CallWhatsApp
โœ‰๏ธ

Get in Touch

Our team will connect with you shortly

+91
๐Ÿ”’ Your details are secure with us
โšก If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
๐Ÿ‘‹ Looking for the right project? Let me help you find it!
๐Ÿ—๏ธ
MPE Project Advisor
โ— Online now