📞 +91 98200 30685 ✉️
RERA: A51800043517

One Indiabulls Thane - 1

by Tapir Constructions Limited Company
Certificate Signed P51700000958
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700000958
Registration No.
REA51700005158
Registration Date
2021-09-09
Developer
Tapir Constructions Limited Company
Project Bank
AXIS BANK
Proposed Possession
2024-08-29
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
1535.00 sq.m
Total FSI
27210.71
Approved FSI
21880.71
MahaRERA QR
One Indiabulls Thane - 1
MahaRERA — P51700000958
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors34
Sanctioned34
⬇️Basements2
📅Completion2023-08-31
🏗️Proposed Floors34
Sanctioned34
⬇️Basements2
📅Completion2023-08-31
🏗️Proposed Floors34
Sanctioned34
⬇️Basements2
📅Completion2023-08-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk T1 A 29.860000610351562 0 0 0
0%
1 Bhk T1 T 34.04999923706055 0 0 0
0%
1 Bhk T1 T 34.38999938964844 0 0 0
0%
1 Bhk T2 33.33000183105469 0 0 0
0%
1 Bhk T2 T 33.83000183105469 0 0 0
0%
1 Bhkt1 33.88999938964844 0 0 0
0%
2 Bhk T2 62.33000183105469 0 0 0
0%
2 Bhk T2 A 67.18000030517578 0 0 0
0%
2 Bhk T2 B 61.560001373291016 0 0 0
0%
2 Bhk T2 C 62.0 0 0 0
0%
2 Bhk T2 T 61.59000015258789 0 0 0
0%
2 Bhk T2 T 61.650001525878906 0 0 0
0%
2.5 Bhk 63.16999816894531 0 0 0
0%
2Bhk T1 R 61.27000045776367 0 0 0
0%
2Bhk T1 T 58.7599983215332 0 0 0
0%
2Bhk T1 T 61.939998626708984 0 0 0
0%
2Bhk T1a T 58.93000030517578 0 0 0
0%
3.5 Bhk T2 111.1500015258789 0 0 0
0%
3.5Bhk T1 121.4800033569336 0 0 0
0%
3Bhk T1 A 90.73999786376953 0 0 0
0%
3Bhk T1 R 90.06999969482422 0 0 0
0%
3Bhk T1 T 90.73999786376953 0 0 0
0%
3Bhk T1a 90.73999786376953 0 0 0
0%
3Bhk T2 R 84.47000122070312 0 0 0
0%
3Bhk T2 T 82.79000091552734 0 0 0
0%
3Bhk T2 T 85.13999938964844 0 0 0
0%
3Bhk T2a 82.79000091552734 0 0 0
0%
5Bhk Family 170.52000427246094 0 0 0
0%

1 A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK T1 R 61.27 5 5 0
100%
2 BHK T1 T 58.76 1 1 0
100%
2 BHK T1 T 61.94 21 21 0
100%
2 BHK T1A T 58.93 22 22 0
100%
3 BHK T1 A 90.74 1 1 0
100%
3 BHK T1 R 90.07 5 5 0
100%
3 BHK T1 T 90.74 22 21 1
95%
3 BHK T2 R 84.47 5 5 0
100%
3 BHK T2 T 82.79 2 2 0
100%
3 BHK T2 T 85.14 22 22 0
100%
3 BHK T2A 82.79 1 1 0
100%
3.5 BHK T1 121.48 2 2 0
100%
5 BHK FAMILY 170.52 1 1 0
100%

1 B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK T1 A 29.86 2 2 0
100%
1 BHK T1 T 34.05 27 27 0
100%
1 BHK T1 T 34.39 21 21 0
100%
1 BHK T2 33.33 1 1 0
100%
1 BHK T2 T 33.83 49 49 0
100%
1 BHKT1 33.89 6 6 0
100%
2 BHK T2 62.33 1 1 0
100%
2 BHK T2 A 67.18 2 2 0
100%
2 BHK T2 B 61.56 1 1 0
100%
2 BHK T2 C 62.0 1 1 0
100%
2 BHK T2 T 61.59 27 26 1
96%
2 BHK T2 T 61.65 26 26 0
100%
2.5 BHK 63.17 2 2 0
100%
3.5 BHK T2 111.15 2 2 0
100%

1 C

Type Carpet (sq.ft) Total Booked Available Status
2 BHK T1 R 61.27 5 5 0
100%
2 BHK T1 T 58.76 1 1 0
100%
2 BHK T1 T 61.94 21 20 1
95%
2 BHK T1A T 58.93 22 21 1
95%
3 BHK T1 R 90.07 5 5 0
100%
3 BHK T1 T 90.74 22 21 1
95%
3 BHK T1A 90.74 1 1 0
100%
3 BHK T2 R 84.47 5 5 0
100%
3 BHK T2 T 82.79 2 2 0
100%
3 BHK T2 T 85.14 22 22 0
100%
3 BHK T2A 82.79 1 1 0
100%
3.5 BHK T1 121.48 2 2 0
100%
5 BHK FAMILY 170.52 1 1 0
100%

Construction Progress

1 A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises60%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
Stilt Floor 100%

1 B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises60%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
Stilt Floor 100%

1 C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises60%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
Stilt Floor 100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.