📞 +91 98200 30685 ✉️
RERA: A51800043517

Panvelkar Estate - Rockford

by Vijay Ramchandra Panvelkar Individual
Certificate Signed P51700000431
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700000431
Registration No.
REA51700004044
Registration Date
2017-07-17
Developer
Vijay Ramchandra Panvelkar Individual
Architect
Sunil Bhagwat Architects
Project Bank
AXIS BANK
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
6220.00 sq.m
Total FSI
7262.32
Approved FSI
7262.32
MahaRERA QR
Panvelkar Estate - Rockford
MahaRERA — P51700000431
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
🚗Open Parking143
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors9
Sanctioned9
🚗Open Parking84
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors4
Sanctioned4
🅿️Closed Parking1
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 28.059999465942383 0 0 0
0%
1Bhk 29.229999542236328 0 0 0
0%
1Bhk 29.530000686645508 0 0 0
0%
1Bhk 39.61000061035156 0 0 0
0%
1Rk 16.8799991607666 0 0 0
0%
1Rk 17.549999237060547 0 0 0
0%
1Rk 17.649999618530273 0 0 0
0%
1Rk 17.8799991607666 0 0 0
0%
1Rk 18.329999923706055 0 0 0
0%
1Rk 19.399999618530273 0 0 0
0%
1Rk 20.209999084472656 0 0 0
0%
2Bhk 48.970001220703125 0 0 0
0%
2Bhk 49.34000015258789 0 0 0
0%
2Bhk 50.2400016784668 0 0 0
0%
Shop 18.59000015258789 0 0 0
0%
Shop 19.1200008392334 0 0 0
0%
Shop 23.100000381469727 0 0 0
0%
Shop 23.899999618530273 0 0 0
0%
Shop 24.90999984741211 0 0 0
0%
Shop 25.280000686645508 0 0 0
0%
Shop 35.0099983215332 0 0 0
0%
Shops 525.5999755859375 0 0 0
0%

Building No 1

Type Carpet (sq.ft) Total Booked Available Status
1RK 16.88 8 8 0
100%
1RK 17.55 1 1 0
100%
1RK 17.65 7 7 0
100%
1RK 17.88 84 83 1
99%
1RK 18.33 7 7 0
100%
1RK 19.4 1 1 0
100%
1RK 20.21 7 7 0
100%

Building No 2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 28.06 2 2 0
100%
1 BHK 29.23 38 38 0
100%
1 BHK 29.53 4 4 0
100%
1 BHK 39.61 1 1 0
100%
2 BHK 48.97 13 12 1
92%
2 BHK 49.34 1 1 0
100%
2 BHK 50.24 14 13 1
93%
Shop 18.59 1 1 0
100%
Shop 19.12 1 0 1
0%
Shop 23.1 1 1 0
100%
Shop 23.9 1 1 0
100%
Shop 24.91 1 1 0
100%
Shop 25.28 2 0 2
0%
Shop 35.01 1 0 1
0%

Building No 3

Type Carpet (sq.ft) Total Booked Available Status
Shops 525.6 3 0 3
0%

Construction Progress

Building No 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Building No 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Building No 3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing50%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 80%
Solid Waste Management And Disposal
Storm Water Drains 60%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.