Project Information

RERA Certificate No.
P51700004393
Registration No.
REA51700015233
Registration Date
2017-08-09
Developer
Panvelkar Realty Private Limited Company
Architect
Samarthya Engineers
Project Bank
ICICI BANK LIMITED
Proposed Possession
2018-12-30
Revised Possession
2018-12-30
Extended Possession
2019-12-30
Units Sold
0
Buildings
3
Project Area
6500.00 sq.m
Total FSI
3996.34
Approved FSI
3996.34
MahaRERA QR
Panvelkar Nisarg Phase-I
MahaRERA — P51700004393
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
📅Completion2018-12-30
🏗️Proposed Floors8
Sanctioned8
📅Completion2018-12-30
🏗️Proposed Floors8
Sanctioned8
📅Completion2018-12-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 30.389999389648438 0 0 0
0%
1Bhk 31.700000762939453 0 0 0
0%
1Bhk 31.709999084472656 0 0 0
0%
1Bhk 34.029998779296875 0 0 0
0%
2Bhk 39.58000183105469 0 0 0
0%
2Bhk 41.599998474121094 0 0 0
0%
2Bhk 45.66999816894531 0 0 0
0%
Shop 11.369999885559082 0 0 0
0%
Shop 11.579999923706055 0 0 0
0%
Shop 12.829999923706055 0 0 0
0%
Shop 13.239999771118164 0 0 0
0%
Shop 14.430000305175781 0 0 0
0%
Shop 15.079999923706055 0 0 0
0%
Shop 15.220000267028809 0 0 0
0%
Shop 16.43000030517578 0 0 0
0%
Shop 18.100000381469727 0 0 0
0%
Shop 18.43000030517578 0 0 0
0%

Building No 1

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 31.7 14 14 0
100%
1 BHK 31.71 14 14 0
100%
2 BHK 39.58 7 6 1
86%
2 BHK 41.6 7 2 5
29%
Shop 11.58 1 0 1
0%
Shop 13.24 1 0 1
0%
Shop 14.43 2 0 2
0%
Shop 15.22 2 0 2
0%
Shop 18.43 1 0 1
0%

Building No 2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 30.39 14 14 0
100%
1 BHK 34.03 7 7 0
100%
2 BHK 45.67 7 6 1
86%
Shop 11.37 1 0 1
0%
Shop 12.83 1 0 1
0%
Shop 15.08 2 0 2
0%
Shop 16.43 1 0 1
0%
Shop 18.1 2 0 2
0%

Building No 3

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 30.39 14 14 0
100%
1 BHK 34.03 7 6 1
86%
2 BHK 45.67 7 7 0
100%
Shop 11.37 1 0 1
0%
Shop 12.83 1 0 1
0%
Shop 16.43 1 0 1
0%
Shop 18.1 2 0 2
0%

Construction Progress

Building No 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Building No 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Building No 3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings 80%
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.