PATELS PRIDE

by PRIDE INFRASTRUCTURE Partnership
Certificate Signed P51700000874
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700000874
Registration No.
REA51700005089
Registration Date
2017-07-24
Developer
PRIDE INFRASTRUCTURE Partnership
Architect
U K Associates
Project Bank
IDBI BANK
Proposed Possession
2018-12-31
Revised Possession
2018-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
2600.00 sq.m
Total FSI
4587.08
Approved FSI
4587.08
MahaRERA QR
PATELS PRIDE
MahaRERA — P51700000874
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
📅Completion2018-12-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2018-12-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2018-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 31.350000381469727 0 0 0
0%
1 Bhk 35.619998931884766 0 0 0
0%
1 Bhk 35.630001068115234 0 0 0
0%
1 Bhk 36.66999816894531 0 0 0
0%
1Bhk 29.139999389648438 0 0 0
0%
1Bhk 29.360000610351562 0 0 0
0%
1Bhk 31.579999923706055 0 0 0
0%
1Bhk 31.719999313354492 0 0 0
0%
1Bhk 31.8799991607666 0 0 0
0%
1Bhk 31.889999389648438 0 0 0
0%
1Bhk 33.599998474121094 0 0 0
0%
1Bhk 33.779998779296875 0 0 0
0%
1Bhk 33.869998931884766 0 0 0
0%
1Bhk 34.77000045776367 0 0 0
0%
1Bhk 36.41999816894531 0 0 0
0%
1Rk 26.020000457763672 0 0 0
0%
2Bhk 44.59000015258789 0 0 0
0%
2Bhk 44.720001220703125 0 0 0
0%
2Bhk 45.220001220703125 0 0 0
0%
2Bhk 45.52000045776367 0 0 0
0%

A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.77 2 2 0
100%
2 BHK 44.72 14 14 0
100%

B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.14 1 1 0
100%
1 BHK 29.36 7 7 0
100%
1 BHK 31.35 1 1 0
100%
1 BHK 31.89 7 7 0
100%
1 BHK 35.62 1 1 0
100%
1 BHK 35.63 1 1 0
100%
1 BHK 36.42 6 6 0
100%
1 BHK 36.67 1 1 0
100%
1RK 26.02 1 1 0
100%
2 BHK 44.59 14 14 0
100%

C Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 31.58 2 2 0
100%
1 BHK 31.72 14 14 0
100%
1 BHK 31.88 14 14 0
100%
1 BHK 33.6 2 2 0
100%
1 BHK 33.78 3 3 0
100%
1 BHK 33.87 11 11 0
100%
2 BHK 45.22 2 2 0
100%
2 BHK 45.52 14 14 0
100%

Construction Progress

A WING

Basement (if any)100%

A Wing

Excavation100%

A WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

A WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

A WING

Plinth100%
Podiums (if any) 0%

A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

A WING

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

A WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

A Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

B WING

Basement (if any)100%

B Wing

Excavation100%

B WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

B WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

B WING

Plinth100%
Podiums (if any) 0%

B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

B WING

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

B WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

B Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

C WING

Basement (if any)100%

C Wing

Excavation100%

C WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

C Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

C WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

C Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

C WING

Plinth100%
Podiums (if any) 0%

C Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

C WING

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

C Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

C WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

C Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 50%
Energy management
Fire Protection And Fire Safety Requirements 50%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.