📞 +91 98200 30685 ✉️
RERA: A51800043517

PLATINUM HERITAGE

by DARSHAN SAGAR DEVELOPERS Partnership
Certificate Signed P51700005172
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700005172
Registration No.
REA51700014608
Registration Date
2017-08-10
Developer
DARSHAN SAGAR DEVELOPERS Partnership
Architect
Ten Folds Architects & Consultants
Project Bank
TJSB SAHAKARI BANK LTD
Proposed Possession
2018-05-31
Revised Possession
2018-05-31
Extended Possession
2019-05-31
Units Sold
0
Buildings
2
Project Area
8767.76 sq.m
Total FSI
17106.24
Approved FSI
12222.93
MahaRERA QR
PLATINUM HERITAGE
MahaRERA — P51700005172
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors16
Sanctioned16
🚗Open Parking48
🅿️Closed Parking60
📅Completion1900-01-01
🏗️Proposed Floors16
Sanctioned16
🚗Open Parking99
🅿️Closed Parking28
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Rk Terrace Type 1 36.36000061035156 0 0 0
0%
1 Rk Type 1 20.6299991607666 0 0 0
0%
1 Rk Type 2 23.3700008392334 0 0 0
0%
1.5 Bhk Type 1 44.790000915527344 0 0 0
0%
1.5 Bhk Type 2 44.79999923706055 0 0 0
0%
1.5 Bhk Type 2 50.7400016784668 0 0 0
0%
1.5 Bhk Type 3 44.79999923706055 0 0 0
0%
1.5 Bhk Type1 44.790000915527344 0 0 0
0%
2 Bhk Type 1 54.47999954223633 0 0 0
0%
2 Bhk Type 1 54.5 0 0 0
0%
2 Bhk Type 2 54.849998474121094 0 0 0
0%
2 Bhk Type 2 54.869998931884766 0 0 0
0%
2 Bhk Type 3 54.97999954223633 0 0 0
0%
2 Bhk Type 3 62.040000915527344 0 0 0
0%
2 Bhk Type 4 54.9900016784668 0 0 0
0%
2 Bhk Type 5 55.04999923706055 0 0 0
0%
2.5 Bhk Type 1 62.5099983215332 0 0 0
0%
2.5 Bhk Type 2 62.529998779296875 0 0 0
0%
2.5 Bhk Type 3 62.970001220703125 0 0 0
0%
Shop 1 27.450000762939453 0 0 0
0%
Shop 10 27.700000762939453 0 0 0
0%
Shop 11 28.899999618530273 0 0 0
0%
Shop 12 15.109999656677246 0 0 0
0%
Shop 12A 22.149999618530273 0 0 0
0%
Shop 13 24.139999389648438 0 0 0
0%
Shop 14 22.850000381469727 0 0 0
0%
Shop 15 26.049999237060547 0 0 0
0%
Shop 16 26.059999465942383 0 0 0
0%
Shop 17 23.700000762939453 0 0 0
0%
Shop 18 23.639999389648438 0 0 0
0%
Shop 2 27.56999969482422 0 0 0
0%
Shop 3 26.729999542236328 0 0 0
0%
Shop 4 25.3700008392334 0 0 0
0%
Shop 5 23.489999771118164 0 0 0
0%
Shop 6 23.489999771118164 0 0 0
0%
Shop 7 22.149999618530273 0 0 0
0%
Shop 7A 15.109999656677246 0 0 0
0%
Shop 8 28.899999618530273 0 0 0
0%
Shop 9 27.700000762939453 0 0 0
0%

Eden Castle

Type Carpet (sq.ft) Total Booked Available Status
1 RK TERRACE TYPE 1 36.36 1 0 1
0%
1 RK TYPE 1 20.63 1 0 1
0%
1 RK TYPE 2 23.37 1 0 1
0%
1.5 BHK TYPE 2 44.8 4 0 4
0%
1.5 BHK TYPE 3 44.8 14 10 4
71%
1.5 BHK TYPE1 44.79 8 7 1
88%
2 BHK TYPE 1 54.5 28 12 16
43%
2 BHK TYPE 2 54.85 5 0 5
0%
2 BHK TYPE 3 54.98 4 0 4
0%
2 BHK TYPE 4 54.99 10 3 7
30%
2 BHK TYPE 5 55.05 9 2 7
22%
2.5 BHK TYPE 1 62.51 26 22 4
85%
2.5 BHK TYPE 2 62.53 1 0 1
0%
2.5 BHK TYPE 3 62.97 1 0 1
0%

Rock Castle

Type Carpet (sq.ft) Total Booked Available Status
1.5 BHK TYPE 1 44.79 26 2 24
8%
1.5 BHK TYPE 2 50.74 2 0 2
0%
2 BHK TYPE 1 54.48 26 11 15
42%
2 BHK TYPE 2 54.87 28 21 7
75%
2 BHK TYPE 3 62.04 2 0 2
0%
2.5 BHK TYPE 1 62.51 28 27 1
96%
SHOP 1 27.45 1 1 0
100%
SHOP 10 27.7 1 1 0
100%
SHOP 11 28.9 1 1 0
100%
SHOP 12 15.11 1 1 0
100%
SHOP 12A 22.15 1 1 0
100%
SHOP 13 24.14 1 1 0
100%
SHOP 14 22.85 1 1 0
100%
SHOP 15 26.05 1 1 0
100%
SHOP 16 26.06 1 1 0
100%
SHOP 17 23.7 1 1 0
100%
SHOP 18 23.64 1 1 0
100%
SHOP 2 27.57 1 1 0
100%
SHOP 3 26.73 1 1 0
100%
SHOP 4 25.37 1 1 0
100%
SHOP 5 23.49 1 1 0
100%
SHOP 6 23.49 1 1 0
100%
SHOP 7 22.15 1 1 0
100%
SHOP 7A 15.11 1 1 0
100%
SHOP 8 28.9 1 1 0
100%
SHOP 9 27.7 1 1 0
100%

Construction Progress

EDEN CASTLE

Basement (if any)100%

Eden Castle

Excavation100%

EDEN CASTLE

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%

Eden Castle

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate10%

EDEN CASTLE

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%

Eden Castle

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises60%
Overall Percentage of Completion of the work done For the entire Building /Wing64%

EDEN CASTLE

Plinth100%
Podiums (if any) 0%

Eden Castle

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

EDEN CASTLE

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Eden Castle

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

EDEN CASTLE

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Eden Castle

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing70%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROCK CASTLE

Basement (if any)100%

Rock Castle

Excavation100%

ROCK CASTLE

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Rock Castle

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%

ROCK CASTLE

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Rock Castle

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing88%

ROCK CASTLE

Plinth100%
Podiums (if any) 0%

Rock Castle

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

ROCK CASTLE

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Rock Castle

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

ROCK CASTLE

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Rock Castle

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings 10%
Electrical Meter Room, Sub-Station, Receiving Station 60%
Energy management 50%
Fire Protection And Fire Safety Requirements 50%
Landscaping & Tree Planting
Open Parking 50%
Sewerage (Chamber, Lines, Septic Tank , STP) 90%
Solid Waste Management And Disposal
Storm Water Drains 90%
Street Lighting 50%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 80%
Water Supply 50%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.