📞 +91 98200 30685 ✉️
RERA: A51800043517

Sai Proviso County

by Proviso Builders and Developers Others
Certificate Signed P51700002042
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700002042
Registration No.
REA51700006503
Registration Date
2020-06-10
Developer
Proviso Builders and Developers Others
Architect
Rajesh R C
Project Bank
ICICI BANK LIMITED
Proposed Possession
2021-06-30
Revised Possession
2021-06-30
Extended Possession
2023-12-31
Units Sold
0
Buildings
9
Project Area
20600.00 sq.m
Total FSI
20557.13
Approved FSI
14059.42
MahaRERA QR
Sai Proviso County
MahaRERA — P51700002042
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking139
📅Completion2020-12-31
🏗️Proposed Floors3
Sanctioned3
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking162
📅Completion2020-12-31
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking132
📅Completion2020-12-31
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking52
📅Completion2020-12-31
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking42
📅Completion2020-12-31
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking145
📅Completion2020-12-31
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking78
📅Completion2020-12-31
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking106
📅Completion2020-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 27.940000534057617 0 0 0
0%
1Bhk 28.010000228881836 0 0 0
0%
1Bhk 31.450000762939453 0 0 0
0%
1Bhk 31.649999618530273 0 0 0
0%
1Bhk 32.63999938964844 0 0 0
0%
1Bhk 32.68000030517578 0 0 0
0%
1Bhk 32.720001220703125 0 0 0
0%
1Bhk 32.810001373291016 0 0 0
0%
1Bhk 33.040000915527344 0 0 0
0%
1Bhk 33.060001373291016 0 0 0
0%
1Bhk 33.08000183105469 0 0 0
0%
1Bhk 33.099998474121094 0 0 0
0%
1Bhk 33.119998931884766 0 0 0
0%
1Bhk 33.130001068115234 0 0 0
0%
1Bhk 33.13999938964844 0 0 0
0%
1Bhk 33.15999984741211 0 0 0
0%
1Bhk 33.220001220703125 0 0 0
0%
1Bhk 33.22999954223633 0 0 0
0%
1Bhk 33.2400016784668 0 0 0
0%
1Bhk 33.2599983215332 0 0 0
0%
1Bhk 33.27000045776367 0 0 0
0%
1Bhk 33.279998779296875 0 0 0
0%
1Bhk 33.31999969482422 0 0 0
0%
1Bhk 33.34000015258789 0 0 0
0%
1Bhk 33.349998474121094 0 0 0
0%
1Bhk 33.380001068115234 0 0 0
0%
1Bhk 33.38999938964844 0 0 0
0%
1Bhk 33.540000915527344 0 0 0
0%
1Bhk 33.68000030517578 0 0 0
0%
1Bhk 33.75 0 0 0
0%
1Bhk 35.380001068115234 0 0 0
0%
1Bhk 35.619998931884766 0 0 0
0%
1Bhk 35.83000183105469 0 0 0
0%
1Bhk 35.869998931884766 0 0 0
0%
1Bhk 36.189998626708984 0 0 0
0%
1Bhk 36.380001068115234 0 0 0
0%
1Bhk 36.400001525878906 0 0 0
0%
1Bhk 36.4900016784668 0 0 0
0%
1Bhk 36.560001373291016 0 0 0
0%
1Bhk 36.689998626708984 0 0 0
0%
1Bhk 36.72999954223633 0 0 0
0%
1Bhk 36.7400016784668 0 0 0
0%
1Bhk 36.79999923706055 0 0 0
0%
1Bhk 36.83000183105469 0 0 0
0%
1Bhk 37.060001373291016 0 0 0
0%
1Bhk 37.290000915527344 0 0 0
0%
1Bhk 37.47999954223633 0 0 0
0%
1Bhk 38.20000076293945 0 0 0
0%
1Bhk 38.470001220703125 0 0 0
0%
1Bhk 38.650001525878906 0 0 0
0%
1Bhk 38.7599983215332 0 0 0
0%
1Bhk 39.029998779296875 0 0 0
0%
1Bhk 39.209999084472656 0 0 0
0%
1Bhk 41.95000076293945 0 0 0
0%
1Bhk 42.18000030517578 0 0 0
0%
1Bhk 42.79999923706055 0 0 0
0%
1Bhk 43.18000030517578 0 0 0
0%
1Bhk 43.47999954223633 0 0 0
0%
1Bhk 52.02000045776367 0 0 0
0%
1Bhk 53.08000183105469 0 0 0
0%
1Bhk 54.5099983215332 0 0 0
0%
2Bhk 42.95000076293945 0 0 0
0%
2Bhk 42.959999084472656 0 0 0
0%
2Bhk 43.0 0 0 0
0%
2Bhk 43.189998626708984 0 0 0
0%
2Bhk 43.380001068115234 0 0 0
0%
2Bhk 43.400001525878906 0 0 0
0%
2Bhk 43.40999984741211 0 0 0
0%
2Bhk 43.41999816894531 0 0 0
0%
2Bhk 43.43000030517578 0 0 0
0%
2Bhk 43.439998626708984 0 0 0
0%
2Bhk 43.45000076293945 0 0 0
0%
2Bhk 43.459999084472656 0 0 0
0%
2Bhk 43.470001220703125 0 0 0
0%
2Bhk 43.4900016784668 0 0 0
0%
2Bhk 46.68000030517578 0 0 0
0%
2Bhk 46.689998626708984 0 0 0
0%
2Bhk 46.709999084472656 0 0 0
0%
2Bhk 46.72999954223633 0 0 0
0%
2Bhk 46.75 0 0 0
0%
2Bhk 46.77000045776367 0 0 0
0%
2Bhk 46.779998779296875 0 0 0
0%
2Bhk 46.790000915527344 0 0 0
0%
2Bhk 46.84000015258789 0 0 0
0%
2Bhk 46.849998474121094 0 0 0
0%
2Bhk 47.470001220703125 0 0 0
0%
2Bhk 48.029998779296875 0 0 0
0%
2Bhk 48.88999938964844 0 0 0
0%
2Bhk 48.95000076293945 0 0 0
0%
2Bhk 49.18000030517578 0 0 0
0%
2Bhk 49.36000061035156 0 0 0
0%
2Bhk 49.380001068115234 0 0 0
0%
2Bhk 49.779998779296875 0 0 0
0%
2Bhk 50.08000183105469 0 0 0
0%
2Bhk 50.68000030517578 0 0 0
0%
2Bhk 50.70000076293945 0 0 0
0%
2Bhk 51.02000045776367 0 0 0
0%
2Bhk 51.459999084472656 0 0 0
0%
2Bhk 51.650001525878906 0 0 0
0%
2Bhk 51.70000076293945 0 0 0
0%
2Bhk 51.970001220703125 0 0 0
0%
2Bhk 52.02000045776367 0 0 0
0%
2Bhk 52.189998626708984 0 0 0
0%
2Bhk 52.5099983215332 0 0 0
0%
2Bhk 52.52000045776367 0 0 0
0%
2Bhk 53.400001525878906 0 0 0
0%
2Bhk 55.2599983215332 0 0 0
0%
2Bhk 55.56999969482422 0 0 0
0%
2Bhk 55.599998474121094 0 0 0
0%
Club Eros 280.8599853515625 0 0 0
0%

Carol

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.64 3 3 0
100%
1 BHK 33.06 3 2 1
67%
1 BHK 33.1 3 3 0
100%
1 BHK 33.12 3 3 0
100%
1 BHK 33.28 3 3 0
100%
1 BHK 33.39 3 3 0
100%
1 BHK 36.19 1 0 1
0%
1 BHK 36.38 1 1 0
100%
1 BHK 36.56 1 1 0
100%
1 BHK 36.8 1 1 0
100%
1 BHK 37.29 1 1 0
100%
1 BHK 38.2 1 1 0
100%
1 BHK 42.18 1 1 0
100%
1 BHK 43.48 1 0 1
0%
2 BHK 43.42 3 3 0
100%
2 BHK 43.43 3 3 0
100%
2 BHK 43.44 3 3 0
100%
2 BHK 43.45 3 3 0
100%
2 BHK 49.36 2 2 0
100%
2 BHK 50.68 2 2 0
100%

Club Eros

Type Carpet (sq.ft) Total Booked Available Status
Club Eros 280.86 1 0 1
0%

Crystal

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.23 6 6 0
100%
1 BHK 33.24 6 6 0
100%
1 BHK 38.76 2 2 0
100%
1 BHK 39.03 2 2 0
100%
2 BHK 42.95 6 6 0
100%
2 BHK 42.96 6 6 0
100%
2 BHK 43.0 6 6 0
100%
2 BHK 43.19 6 6 0
100%
2 BHK 48.03 2 2 0
100%
2 BHK 49.38 2 2 0
100%
2 BHK 49.78 2 2 0
100%
2 BHK 51.46 2 2 0
100%

Daisy

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.23 6 6 0
100%
1 BHK 33.24 6 6 0
100%
1 BHK 38.76 2 0 2
0%
1 BHK 39.03 2 0 2
0%
2 BHK 42.95 6 6 0
100%
2 BHK 42.96 6 6 0
100%
2 BHK 43.0 6 6 0
100%
2 BHK 43.19 6 6 0
100%
2 BHK 48.03 2 2 0
100%
2 BHK 49.38 2 2 0
100%
2 BHK 49.78 2 2 0
100%
2 BHK 51.46 2 2 0
100%

Ebony

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.68 3 3 0
100%
1 BHK 33.08 3 0 3
0%
1 BHK 33.12 1 1 0
100%
1 BHK 33.13 1 1 0
100%
1 BHK 33.22 3 3 0
100%
1 BHK 33.26 3 0 3
0%
1 BHK 33.27 3 3 0
100%
1 BHK 33.38 3 3 0
100%
1 BHK 35.87 1 1 0
100%
1 BHK 36.38 1 0 1
0%
1 BHK 36.49 1 1 0
100%
1 BHK 36.74 1 0 1
0%
1 BHK 36.8 1 0 1
0%
1 BHK 38.65 1 1 0
100%
1 BHK 39.21 2 2 0
100%
1 BHK 41.95 1 1 0
100%
1 BHK 43.18 1 1 0
100%
1 BHK 52.02 1 1 0
100%
2 BHK 43.38 3 3 0
100%
2 BHK 43.4 9 9 0
100%
2 BHK 46.68 3 3 0
100%
2 BHK 46.69 3 3 0
100%
2 BHK 46.73 3 3 0
100%
2 BHK 46.75 3 3 0
100%
2 BHK 47.47 2 1 1
50%
2 BHK 49.18 2 2 0
100%
2 BHK 51.7 1 1 0
100%
2 BHK 55.26 1 0 1
0%
2 BHK 55.57 1 1 0
100%

Fern

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.68 3 0 3
0%
1 BHK 33.08 3 1 2
33%
1 BHK 33.12 1 1 0
100%
1 BHK 33.14 1 1 0
100%
1 BHK 33.22 3 3 0
100%
1 BHK 33.26 3 2 1
67%
1 BHK 33.27 3 3 0
100%
1 BHK 33.38 3 3 0
100%
1 BHK 35.87 1 0 1
0%
1 BHK 36.38 1 0 1
0%
1 BHK 36.49 1 0 1
0%
1 BHK 36.74 1 1 0
100%
1 BHK 36.8 1 0 1
0%
1 BHK 38.65 1 0 1
0%
1 BHK 39.21 2 2 0
100%
1 BHK 41.95 1 1 0
100%
1 BHK 43.18 1 1 0
100%
2 BHK 43.38 3 3 0
100%
2 BHK 43.4 9 9 0
100%
2 BHK 46.68 3 3 0
100%
2 BHK 46.69 3 3 0
100%
2 BHK 46.73 3 3 0
100%
2 BHK 46.75 3 3 0
100%
2 BHK 47.47 4 4 0
100%
2 BHK 51.65 1 1 0
100%
2 BHK 51.7 1 1 0
100%
2 BHK 51.97 1 1 0
100%
2 BHK 52.02 1 1 0
100%

Hazel

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.72 3 3 0
100%
1 BHK 33.13 3 3 0
100%
1 BHK 33.14 3 3 0
100%
1 BHK 33.28 3 3 0
100%
1 BHK 33.34 3 3 0
100%
1 BHK 33.35 3 3 0
100%
1 BHK 35.38 1 0 1
0%
1 BHK 36.69 1 1 0
100%
1 BHK 36.73 1 0 1
0%
1 BHK 36.83 1 1 0
100%
1 BHK 38.76 1 0 1
0%
1 BHK 39.03 1 1 0
100%
1 BHK 53.08 1 1 0
100%
1 BHK 54.51 1 1 0
100%
2 BHK 46.71 3 3 0
100%
2 BHK 46.73 3 3 0
100%
2 BHK 46.77 3 3 0
100%
2 BHK 46.78 3 3 0
100%
2 BHK 53.4 1 1 0
100%
2 BHK 55.6 1 1 0
100%

Iris

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.06 1 0 1
0%
1 BHK 33.16 3 3 0
100%
1 BHK 33.23 3 3 0
100%
1 BHK 33.54 1 1 0
100%
1 BHK 33.68 3 3 0
100%
1 BHK 33.75 3 2 1
67%
1 BHK 35.83 1 0 1
0%
1 BHK 36.38 1 0 1
0%
1 BHK 36.4 1 0 1
0%
1 BHK 37.48 1 1 0
100%
1 BHK 42.8 2 0 2
0%
2 BHK 43.41 3 3 0
100%
2 BHK 43.43 6 6 0
100%
2 BHK 43.46 3 3 0
100%
2 BHK 48.89 4 4 0
100%

Oceana

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 27.94 1 1 0
100%
1 BHK 28.01 1 0 1
0%
1 BHK 31.45 3 3 0
100%
1 BHK 31.65 3 3 0
100%
1 BHK 32.81 3 3 0
100%
1 BHK 33.04 3 1 2
33%
1 BHK 33.13 3 1 2
33%
1 BHK 33.32 3 1 2
33%
1 BHK 35.62 1 1 0
100%
1 BHK 37.06 1 0 1
0%
1 BHK 38.47 1 0 1
0%
1 BHK 38.65 1 0 1
0%
2 BHK 43.46 3 3 0
100%
2 BHK 43.47 3 3 0
100%
2 BHK 43.49 6 6 0
100%
2 BHK 46.78 3 3 0
100%
2 BHK 46.79 3 3 0
100%
2 BHK 46.84 3 3 0
100%
2 BHK 46.85 3 3 0
100%
2 BHK 48.95 1 1 0
100%
2 BHK 49.36 1 0 1
0%
2 BHK 50.08 1 1 0
100%
2 BHK 50.7 1 1 0
100%
2 BHK 51.02 1 1 0
100%
2 BHK 52.19 1 1 0
100%
2 BHK 52.51 1 1 0
100%
2 BHK 52.52 1 1 0
100%

Construction Progress

Carol

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

Club Eros

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

Crystal

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

Daisy

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

Ebony

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

Fern

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.97%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
Stilt Floor 100%

Hazel

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
Stilt Floor 100%

Iris

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
Stilt Floor 100%

Oceana

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station 80%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 90%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 80%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.