Project Information

RERA Certificate No.
P51900000841
Registration No.
REA51900004107
Registration Date
2023-02-14
Developer
K Raheja Private Limited
Project Bank
HDFC BANK
Proposed Possession
2023-12-30
Revised Possession
2023-12-30
Extended Possession
1900-01-01
Total Units
133
Units Sold
131 (98%)
Buildings
1
Project Area
19640.99 sq.m
Total FSI
78311.62
Approved FSI
62993.62
MahaRERA QR
Artesia - Residential Wing Constructed On Part Of The Project Land
MahaRERA — P51900000841
Scan to verify on MahaRERA portal

Wing-wise Details

⬇️Basements2
🅿️Closed Parking668
📅Completion2023-12-30

Apartment Configurations

Artesia - Residential Wing Constructed On Project

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 152.4 1 1 0
100%
4 BHK 275.35 58 58 0
100%
4 BHK 343.93 41 41 0
100%
4 BHK 344.28 2 2 0
100%
4 BHK 344.65 1 1 0
100%
4 BHK 346.66 1 1 0
100%
4 BHK 347.91 3 3 0
100%
4 BHK 351.3 1 1 0
100%
AMALGAMATED 1 628.94 6 6 0
100%
AMALGAMATED 10 1764.63 1 1 0
100%
AMALGAMATED 11 1889.09 1 1 0
100%
AMALGAMATED 12 1909.14 1 1 0
100%
AMALGAMATED 13 627.68 1 1 0
100%
AMALGAMATED 14 1091.19 1 0 1
0%
AMALGAMATED 15 628.85 2 2 0
100%
AMALGAMATED 16 613.97 1 1 0
100%
AMALGAMATED 2 629.24 2 0 2
0%
AMALGAMATED 3 686.57 1 1 0
100%
AMALGAMATED 4 689.51 1 1 0
100%
AMALGAMATED 5 690.08 2 2 0
100%
AMALGAMATED 6 691.84 1 1 0
100%
AMALGAMATED 7 974.42 1 1 0
100%
AMALGAMATED 8 1033.44 1 1 0
100%
AMALGAMATED 9 1259.42 1 1 0
100%
DUPLEX 1 687.86 1 1 0
100%

Construction Progress

Artesia - Residential Wing Constructed On Project

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.