📞 +91 98200 30685 ✉️
RERA: A51800043517

RAJESHWARI RESIDENCY

by SHREE SIDDHI CONSTRUCTION Partnership
Certificate Signed P51700005861
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700005861
Registration No.
REA51700017824
Registration Date
2020-08-12
Developer
SHREE SIDDHI CONSTRUCTION Partnership
Architect
Shobhana Deshpande
Project Bank
SARASWAT COOPERATIVE BANK LIMITED
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
2022-06-20
Units Sold
0
Buildings
2
Project Area
3000.00 sq.m
Total FSI
4232.61
Approved FSI
4232.61
MahaRERA QR
RAJESHWARI RESIDENCY
MahaRERA — P51700005861
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors7
Sanctioned7
🚗Open Parking1
📅Completion2019-06-14
🏗️Proposed Floors8
Sanctioned8
🚗Open Parking1
🅿️Closed Parking1
📅Completion2022-06-20

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
Commercial 11.850000381469727 0 0 0
0%
Commercial 12.199999809265137 0 0 0
0%
Commercial 13.380000114440918 0 0 0
0%
Commercial 14.220000267028809 0 0 0
0%
Commercial 15.010000228881836 0 0 0
0%
Commercial 19.079999923706055 0 0 0
0%
Residential 31.93000030517578 0 0 0
0%
Residential 31.979999542236328 0 0 0
0%
Residential 32.029998779296875 0 0 0
0%
Residential 32.08000183105469 0 0 0
0%
Residential 32.88999938964844 0 0 0
0%
Residential 45.5 0 0 0
0%
Residential 49.56999969482422 0 0 0
0%
Residential 49.939998626708984 0 0 0
0%
Residential 65.04000091552734 0 0 0
0%

Building A

Type Carpet (sq.ft) Total Booked Available Status
Commercial 11.85 1 0 1
0%
Commercial 12.2 1 0 1
0%
Commercial 13.38 2 1 1
50%
Commercial 14.22 2 1 1
50%
Commercial 15.01 1 0 1
0%
Commercial 19.08 1 0 1
0%
Residential 31.98 26 4 22
15%
Residential 32.03 6 1 5
17%
Residential 32.89 6 0 6
0%
Residential 45.5 1 0 1
0%
Residential 49.57 1 0 1
0%
Residential 49.94 1 0 1
0%
Residential 65.04 1 0 1
0%

Building B

Type Carpet (sq.ft) Total Booked Available Status
Residential 31.93 13 0 13
0%
Residential 32.08 14 14 0
100%

Construction Progress

BUILDING A

Basement (if any)100%

Building A

Excavation100%

BUILDING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Building A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

BUILDING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Building A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

BUILDING A

Plinth100%
Podiums (if any) 0%

Building A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

BUILDING A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Building A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUILDING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUILDING B

Basement (if any)100%

Building B

Excavation100%

BUILDING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Building B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

BUILDING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Building B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

BUILDING B

Plinth100%
Podiums (if any) 0%

Building B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

BUILDING B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Building B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUILDING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
CHILDREN PLAY GARDEN
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
SECURITY SYSTEM
Sewerage (Chamber, Lines, Septic Tank , STP)
SOLAR WATER HEATER SYSTEM
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.