R
✓ MahaRERA P51700027142RERA: no litigation reported98
Units
2023
Possession
2
Buildings
Kept in Abeyance
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: New Project · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Dec 2023
Status
New Project
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
Office Space36–169 ft²On request
1 BHK432–433 ft²On request
Shop137–454 ft²On request
2 BHK513–752 ft²On request
3 BHK1,749 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P51700027142
Registered
—
Litigation
No reported in source
Escrow Bank
KOTAK MAHINDRA BANK
Architect
—
Total FSI
5683
04
Buildings · 2 Wing(s)
Wing A— floors · — units
Wing B— floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Ram Mandir Corner
19.220188800000000,73.083394900000000
19.220188800000000,73.083394900000000
▸ Explore map & Street View — for verified buyers
09
Construction Progress
90% avgExcavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Slabs of Super Structure100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate95%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Overall Percentage of Completion of the work done For the entire Building /Wing79%
Stilt Floor0%
10
Amenities
Electrical Meter Room, Sub-Station, Receiving StationFire Protection And Fire Safety RequirementsOpen ParkingSewerage (Chamber, Lines, Septic Tank , STP)Storm Water DrainsWater Conservation, Rain water HarvestingWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory?
Frequently Asked Questions
When is possession of Rudra Heights?
As per MahaRERA, proposed possession is Dec 2023.
Is Rudra Heights RERA-registered?
Yes — MahaRERA registration P51700027142. The current MahaRERA source record reports no litigations.
Who is the developer?
A.S.D. Enterprises View their track record ▸
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.