Ruparel Ariana

by Shree Sukhakarta Developers Pvt.Ltd. Company
Certificate Signed P51900003250
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51900003250
Registration No.
REA51900011585
Registration Date
2021-09-09
Developer
Shree Sukhakarta Developers Pvt.Ltd. Company
Architect
Mr Rahul Kamathi
Project Bank
KOTAK MAHINDRA BANK LIMITED
Proposed Possession
2022-12-30
Revised Possession
2022-12-30
Extended Possession
2023-12-30
Units Sold
0
Buildings
2
Project Area
12644.28 sq.m
Total FSI
28234.35
Approved FSI
26390.00
MahaRERA QR
Ruparel Ariana
MahaRERA — P51900003250
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors84
Sanctioned84
⬇️Basements2
🅿️Closed Parking386
📅Completion2021-12-31
🏗️Proposed Floors4
Sanctioned4
📅Completion1900-01-01

Apartment Configurations

Ruparel Ariana Ph I

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 71.5 90 68 22
76%
2 BHK 74.66 45 25 20
56%
3 BHK 113.94 83 55 28
66%
3 BHK 125.5 20 4 16
20%
3 BHK 131.25 19 3 16
16%
DuplexA 218.18 2 0 2
0%
DuplexB 237.1 2 0 2
0%

Ruparel Ariana Ph Ii

Type Carpet (sq.ft) Total Booked Available Status
commercial 135.1 4 0 4
0%

Construction Progress

Ruparel Ariana Ph I

Basement (if any)95%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises89%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises89%
Plinth95%
Podiums (if any) 95%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises80%
Sanitary Fittings within the flats / premises80%
Slabs of Super Structure89%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.89%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks89%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth95%
X number of Podiums95%
X number of Slabs of Super Structure89%

Ruparel Ariana Ph II

Basement (if any)0%

Ruparel Ariana Ph Ii

Excavation0%

Ruparel Ariana Ph II

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Ruparel Ariana Ph Ii

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Ruparel Ariana Ph II

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Ruparel Ariana Ph Ii

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

Ruparel Ariana Ph II

Plinth0%
Podiums (if any) 0%

Ruparel Ariana Ph Ii

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Ruparel Ariana Ph II

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Ruparel Ariana Ph Ii

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Ruparel Ariana Ph II

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Ruparel Ariana Ph Ii

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 50%
Energy management
Fire Protection And Fire Safety Requirements 50%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 50%
Solid Waste Management And Disposal 50%
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water 50%
Water Conservation, Rain water Harvesting
Water Supply 50%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.