📞 +91 98200 30685 ✉️
RERA: A51800043517

Sadguru Residency

by SADGURU INFRA Partnership
Certificate Signed P51700004161
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700004161
Registration No.
REA51700009496
Registration Date
2017-08-08
Developer
SADGURU INFRA Partnership
Architect
Space Designers
Project Bank
DCB BANK LIMITED
Proposed Possession
2018-03-31
Revised Possession
2018-03-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
1700.00 sq.m
Total FSI
2009.57
Approved FSI
2009.57
MahaRERA QR
Sadguru Residency
MahaRERA — P51700004161
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
Commercial 10.0 0 0 0
0%
Residential 20.350000381469727 0 0 0
0%
Residential 21.459999084472656 0 0 0
0%
Residential 26.690000534057617 0 0 0
0%
Residential 26.850000381469727 0 0 0
0%
Residential 27.059999465942383 0 0 0
0%
Residential 27.06999969482422 0 0 0
0%
Residential 27.170000076293945 0 0 0
0%
Residential 27.3799991607666 0 0 0
0%
Residential 27.579999923706055 0 0 0
0%
Residential 28.030000686645508 0 0 0
0%
Residential 28.1299991607666 0 0 0
0%
Residential 29.6200008392334 0 0 0
0%
Residential 30.010000228881836 0 0 0
0%
Residential 30.6200008392334 0 0 0
0%
Residential 31.010000228881836 0 0 0
0%

A Wing

Type Carpet (sq.ft) Total Booked Available Status
Commercial 10.0 5 0 5
0%
Residential 21.46 4 2 2
50%
Residential 27.06 4 2 2
50%
Residential 27.38 4 0 4
0%
Residential 28.03 4 1 3
25%
Residential 31.01 4 2 2
50%

B Wing

Type Carpet (sq.ft) Total Booked Available Status
Residential 26.69 4 1 3
25%
Residential 27.58 4 3 1
75%
Residential 29.62 4 4 0
100%
Residential 30.01 4 3 1
75%
Residential 30.62 4 4 0
100%

C Wing

Type Carpet (sq.ft) Total Booked Available Status
Residential 20.35 1 1 0
100%
Residential 26.85 1 1 0
100%
Residential 27.07 5 2 3
40%
Residential 27.17 8 5 3
62%
Residential 28.13 4 1 3
25%

Construction Progress

A wing

Basement (if any)100%

A Wing

Excavation100%

A wing

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

A wing

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

A wing

Plinth100%
Podiums (if any) 0%

A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

A wing

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

A wing

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

A Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

B wing

Basement (if any)100%

B Wing

Excavation100%

B wing

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

B wing

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

B wing

Plinth100%
Podiums (if any) 0%

B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

B wing

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

B wing

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

B Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

C wing

Basement (if any)100%

C Wing

Excavation100%

C wing

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

C Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

C wing

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

C Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

C wing

Plinth100%
Podiums (if any) 0%

C Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

C wing

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

C Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

C wing

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

C Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.