Sai Arcade

πŸ“ Phadke Road Dombivli East, Thane Β· 421201
82
Units
2020
Possession
3
Buildings
Kept in Abeyance
Status
01Possession Timeline
Proposed
Dec 2020
Revised
Dec 2021
Status
On-Going Project
⚠ Possession revised later than originally proposed β€” per MahaRERA.
02Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
1 BHK318–333 ftΒ²On request
Office Space60–483 ftΒ²On request
3 BHK640–753 ftΒ²On request
2 BHK484–864 ftΒ²On request
Shop101–981 ftΒ²On request
Configurations & carpet per MahaRERA filing Β· indicative price = locality rate Γ— carpet (not the developer's quote).
πŸ’¬ Live availability, floor plans & today's price β€” on WhatsApp
03RERA Trust Record
MahaRERA No.
P51700003993
Registered
β€”
Litigation
None on record
Escrow Bank
FEDERAL BANK
Architect
Uday Mansukhlal Chopda
Total FSI
4633
04Buildings Β· 3 Wing(s)
A Wingβ€” floors Β· β€” units
Proposed Not Sanctionedβ€” floors Β· β€” units
Wing Bβ€” floors Β· β€” units
05Land DNA Β· Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold β€” provenance from MPE's verification layer. The genesis no portal shows.
06Location
πŸ“ Phadke Road Dombivli East
19.239294000000001,73.128715999999997
β–Έ Explore map & Street View β€” for verified buyers
09Construction Progress90% avg
Excavation100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Slabs of Super Structure100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate95%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate75%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises75%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.75%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing75%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises65%
10Amenities
Aggregate area of recreational Open SpaceElectrical Meter Room, Sub-Station, Receiving StationEnergy managementFire Protection And Fire Safety RequirementsOpen ParkingSewerage (Chamber, Lines, Septic Tank , STP)Storm Water DrainsWater Conservation, Rain water HarvestingWater Supply
12Floor Plans, E-Brochure & Payment Plans
πŸ“ Unit floor plansπŸ“„ Official e-brochureπŸ’³ Payment plans Β· 20:80 Β· subvention Β· current offers

Shared on WhatsApp by our MahaRERA advisor β€” including the latest builder offers and payment schemes we don't list publicly.

πŸ’¬ Get floor plan, brochure & offers on WhatsApp
13EMI Calculator
β€”
14More by Sai Mangal Enterprises
Sainath ResidencyBhandup West Β· Sold OutSainath VrindavanMulund East Β· Under ConstructionAyaanaTaloja Β· Under ConstructionAntalyaBelapur Β· Under ConstructionThe AvenueBelapur Β· Under ConstructionThe GatewayVashi Β· Under Construction
?Frequently Asked Questions
When is possession of Sai Arcade?

As per MahaRERA, proposed possession is Dec 2020, revised to Dec 2021.

Is Sai Arcade RERA-registered?

Yes β€” MahaRERA registration P51700003993. No litigations on record.

Who is the developer?

Sai Mangal Enterprises β€” 112 projects tracked on Mumbai Property Exchange. View their track record β–Έ

How do I book or get more details?

Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor β€” serving Mumbai since 1995 Β· RERA-registered since 2017.

SOURCE Β· MAHARERA + MUMBAI PROPERTY EXCHANGE
INDEPENDENT DATA Β· RERA A51800043517 Β· EST. 1995
WhatsAppEnquire β–Έ
🎯 AI Matchmaker
Tell us what you want in Phadke Road Dombivli East β€” get matched
RERA-verified options on WhatsApp. No spam, no fakes.
βœ“ MahaRERA P51700077356β˜… Featured
Lodha Group
Lodha Hanging Gardens, Dombivali
3 BHK, 4 BHK Β· β‚Ή16,400/sq.ft Β· Possession Dec 2027
Learn more β€Ί

πŸ“° Latest Mumbai Property News

View all news β†’