Project Information

RERA Certificate No.
P51700006686
Registration No.
REA51700010654
Registration Date
2017-08-16
Developer
ANJANA SAHEBRAO CHAVAN Individual
Architect
Vitan Consultant
Project Bank
BANK OF MAHARASHTRA
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
2021-12-30
Units Sold
0
Buildings
2
Project Area
3995.00 sq.m
Total FSI
2130.09
Approved FSI
2130.09
MahaRERA QR
SAI SARVESH
MahaRERA — P51700006686
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
📅Completion1900-01-01
🏗️Proposed Floors10
Sanctioned10
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 28.809999465942383 0 0 0
0%
1 Bhk 29.0 0 0 0
0%
1 Bhk 29.90999984741211 0 0 0
0%
1 Bhk 31.329999923706055 0 0 0
0%
1 Bhk 33.38999938964844 0 0 0
0%
1 Bhk 36.9900016784668 0 0 0
0%
1 Rk 22.790000915527344 0 0 0
0%
1 Rk 23.59000015258789 0 0 0
0%
1 Rk 24.760000228881836 0 0 0
0%
1 Rk 26.850000381469727 0 0 0
0%
1 Rk 27.209999084472656 0 0 0
0%
1 Rk 27.90999984741211 0 0 0
0%
1 Rk 29.719999313354492 0 0 0
0%
Shop 10.869999885559082 0 0 0
0%
Shop 11.739999771118164 0 0 0
0%
Shop 13.0 0 0 0
0%
Shop 14.0 0 0 0
0%
Shop 15.510000228881836 0 0 0
0%

Plot No 2 A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 28.81 7 0 7
0%
1 BHK 29.0 1 0 1
0%
1 BHK 29.91 7 0 7
0%
1 BHK 31.33 4 0 4
0%
1 RK 22.79 1 0 1
0%
1 RK 23.59 7 0 7
0%
1 RK 26.85 7 0 7
0%
1 RK 27.91 1 0 1
0%
1 RK 29.72 1 0 1
0%

Plot No 2 B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.39 7 0 7
0%
1 BHK 36.99 4 0 4
0%
1 RK 24.76 11 0 11
0%
1 RK 27.21 3 0 3
0%
SHOP 10.87 1 0 1
0%
SHOP 11.74 2 0 2
0%
SHOP 13.0 1 0 1
0%
SHOP 14.0 1 0 1
0%
SHOP 15.51 3 0 3
0%

Construction Progress

PLOT NO 2 A WING

Basement (if any)100%

Plot No 2 A Wing

Excavation100%

PLOT NO 2 A WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Plot No 2 A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

PLOT NO 2 A WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Plot No 2 A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

PLOT NO 2 A WING

Plinth100%
Podiums (if any) 100%

Plot No 2 A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

PLOT NO 2 A WING

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Plot No 2 A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

PLOT NO 2 A WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Plot No 2 A Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

PLOT NO 2 B WING

Basement (if any)100%

Plot No 2 B Wing

Excavation100%

PLOT NO 2 B WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Plot No 2 B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

PLOT NO 2 B WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Plot No 2 B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

PLOT NO 2 B WING

Plinth100%
Podiums (if any) 100%

Plot No 2 B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

PLOT NO 2 B WING

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Plot No 2 B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

PLOT NO 2 B WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Plot No 2 B Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.