Project Information

RERA Certificate No.
P52000055382
Registration No.
REA52000154897
Registration Date
2024-05-29
Developer
K T INFRA Partnership
Architect
Atul Patel
Project Bank
HDFC BANK
Proposed Possession
2029-12-31
Total Units
280
Units Sold
262 (94%)
Buildings
4
Project Area
8129.13 sq.m
Total FSI
46254.75
Approved FSI
27767.89
MahaRERA QR
SAI VRINDAVAN
MahaRERA — P52000055382
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors10
Sanctioned10
🏠Habitable10
🔢Total Units64
🏡Residential55
🏢Non-Residential9
🏗️Proposed Floors10
Sanctioned10
🏠Habitable10
🔢Total Units83
🏡Residential70
🏢Non-Residential13
🏗️Proposed Floors10
Sanctioned10
🏠Habitable10
🔢Total Units82
🏡Residential70
🏢Non-Residential12
🏗️Proposed Floors11
Sanctioned11
🏠Habitable10
🔢Total Units51
🏡Residential35
🏢Non-Residential16

Construction Progress

A WING JAY

Basement (if any)60%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.18%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises12%
Plinth100%
Podiums (if any)50%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure88%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks48%
Stilt Floor60%

B WING SHRI

Basement (if any)60%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises12%
Plinth100%
Podiums (if any)50%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure88%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks48%
Stilt Floor60%

C WING RADHE

Basement (if any)60%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.18%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises14%
Plinth100%
Podiums (if any)50%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure88%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks48%
Stilt Floor60%

D WING KRISHNA

Basement (if any)60%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises11%
Plinth100%
Podiums (if any)25%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks43%
Stilt Floor60%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical meter room, sub-station, receiving station
Energy managemcnt
Fire protection and fire safety requirements
Internal Roads & Footpaths
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Supply
Water conservation /Rain water harvesting

Latest Mumbai Property News

View all news →
CallWhatsApp
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now