📞 +91 98200 30685 ✉️
RERA: A51800043517

SEASONS GREEN

by JAI BALAJI SAI REALTORS Partnership
Certificate Signed P51700051575
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700051575
Registration No.
REA51700138523
Registration Date
2023-06-27
Developer
JAI BALAJI SAI REALTORS Partnership
Architect
Tejus Nirgude
Project Bank
AXIS BANK
Proposed Possession
2027-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
8
Project Area
12965.00 sq.m
Total FSI
22216.16
Approved FSI
22216.16
MahaRERA QR
SEASONS GREEN
MahaRERA — P51700051575
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
📅Completion2027-12-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2027-12-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2027-12-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2027-12-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2027-12-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2027-12-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2027-12-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2027-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 29.610000610351562 0 0 0
0%
1Bhk 32.18000030517578 0 0 0
0%
1Bhk 33.08000183105469 0 0 0
0%
1Bhk 43.09000015258789 0 0 0
0%
1Rk 20.65999984741211 0 0 0
0%
2Bhk 42.68000030517578 0 0 0
0%
2Bhk 42.79999923706055 0 0 0
0%
2Bhk 43.09000015258789 0 0 0
0%
Shop 10.279999732971191 0 0 0
0%
Shop 10.59000015258789 0 0 0
0%
Shop 10.8100004196167 0 0 0
0%
Shop 11.079999923706055 0 0 0
0%
Shop 11.279999732971191 0 0 0
0%
Shop 11.430000305175781 0 0 0
0%
Shop 12.0 0 0 0
0%
Shop 12.949999809265137 0 0 0
0%
Shop 13.359999656677246 0 0 0
0%
Shop 15.479999542236328 0 0 0
0%

A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.08 1 0 1
0%
1 BHK 43.09 42 0 42
0%
2 BHK 42.8 2 0 2
0%
Shop 10.28 1 0 1
0%
Shop 10.81 2 0 2
0%
Shop 11.08 1 0 1
0%
Shop 12.0 1 0 1
0%
Shop 12.95 1 0 1
0%
Shop 13.36 1 0 1
0%
Shop 15.48 6 0 6
0%

B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.61 49 1 48
2%
1 BHK 32.18 3 0 3
0%
1RK 20.66 1 0 1
0%
2 BHK 42.68 7 0 7
0%
Shop 10.28 2 0 2
0%
Shop 10.81 2 0 2
0%
Shop 12.0 2 0 2
0%
Shop 13.36 1 0 1
0%
Shop 15.48 6 0 6
0%

C Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.08 1 0 1
0%
2 BHK 42.8 1 0 1
0%
2 BHK 43.09 42 2 40
5%
Shop 10.28 1 0 1
0%
Shop 10.59 1 0 1
0%
Shop 10.81 2 0 2
0%
Shop 11.08 1 0 1
0%
Shop 11.28 1 0 1
0%
Shop 11.43 1 0 1
0%
Shop 12.0 1 0 1
0%
Shop 12.95 1 0 1
0%
Shop 13.36 1 0 1
0%
Shop 15.48 6 0 6
0%

D Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.61 49 0 49
0%
2 BHK 42.68 7 0 7
0%
Shop 10.28 2 0 2
0%
Shop 10.81 2 0 2
0%
Shop 12.0 2 0 2
0%
Shop 13.36 1 0 1
0%
Shop 15.48 11 0 11
0%

E Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.61 49 4 45
8%
2 BHK 42.68 7 0 7
0%

F Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.61 49 0 49
0%
2 BHK 42.68 7 0 7
0%

G Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.61 49 0 49
0%
2 BHK 42.68 7 0 7
0%

H Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.61 49 0 49
0%
2 BHK 42.68 7 0 7
0%

Construction Progress

A WING

Basement (if any)100%

A Wing

Excavation100%

A WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

A WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%

A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

A WING

Plinth100%
Podiums (if any) 0%

A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

A WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure87%

A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%

A WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%

A Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure37%

B WING

Basement (if any)100%

B Wing

Excavation100%

B WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

B WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%

B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

B WING

Plinth100%
Podiums (if any) 0%

B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

B WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure87%

B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%

B WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%

B Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

C WING

Basement (if any)100%

C Wing

Excavation100%

C WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

C Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

C WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%

C Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

C WING

Plinth100%
Podiums (if any) 0%

C Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

C WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

C Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%

C WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%

C Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

D WING

Basement (if any)100%

D Wing

Excavation100%

D WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

D Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

D WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

D Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing12%

D WING

Plinth100%
Podiums (if any) 0%

D Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

D WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

D Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%

D WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%

D Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

E WING

Basement (if any)100%

E Wing

Excavation100%

E WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

E Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

E WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

E Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing22%

E WING

Plinth100%
Podiums (if any) 0%

E Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

E WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

E Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%

E WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%

E Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

F WING

Basement (if any)0%

F Wing

Excavation0%

F WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

F Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

F WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

F Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing2%

F WING

Plinth0%
Podiums (if any) 0%

F Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

F WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

F Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%

F WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%

F Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

G WING

Basement (if any)0%

G Wing

Excavation0%

G WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

G Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

G WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

G Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing2%

G WING

Plinth0%
Podiums (if any) 0%

G Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

G WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

G Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%

G WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%

G Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

H WING

Basement (if any)0%

H Wing

Excavation0%

H WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

H Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

H WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

H Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing2%

H WING

Plinth0%
Podiums (if any) 0%

H Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

H WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

H Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%

H WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%

H Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.