📞 +91 98200 30685 ✉️
RERA: A51800043517

SHREE GOPINATH SUBLIME

by VEDANT CONSTRUCTION Partnership
Certificate Signed P51700003177
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700003177
Registration No.
REA51700011726
Registration Date
2021-09-09
Developer
VEDANT CONSTRUCTION Partnership
Architect
Joshi Deshaware & Associate
Project Bank
STATE BANK OF INDIA
Proposed Possession
2022-06-30
Revised Possession
2022-06-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
5130.28 sq.m
Total FSI
10071.52
Approved FSI
10071.52
MahaRERA QR
SHREE GOPINATH SUBLIME
MahaRERA — P51700003177
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors31
Sanctioned31
⬇️Basements1
🚗Open Parking27
🅿️Closed Parking159
📅Completion2021-06-30
🏗️Proposed Floors3
Sanctioned3
🚗Open Parking1
🅿️Closed Parking3
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 38.16999816894531 0 0 0
0%
2 Bhk 49.41999816894531 0 0 0
0%
2Bhk 46.619998931884766 0 0 0
0%
3Bhk 63.52000045776367 0 0 0
0%
3Bhk 66.31999969482422 0 0 0
0%
Bunglow 307.9700012207031 0 0 0
0%
Shop 18.239999771118164 0 0 0
0%
Shop 18.299999237060547 0 0 0
0%
Shop 18.600000381469727 0 0 0
0%
Shop 19.600000381469727 0 0 0
0%
Shop 20.010000228881836 0 0 0
0%
Shop 24.90999984741211 0 0 0
0%
Shop 39.4900016784668 0 0 0
0%
Shop 46.5 0 0 0
0%

B-1

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 38.17 96 47 49
49%
2 BHK 46.62 22 21 1
95%
2 BHK 49.42 75 18 57
24%
3 BHK 63.52 5 5 0
100%
3 BHK 66.32 5 3 2
60%
SHOP 18.24 1 0 1
0%
SHOP 18.3 2 0 2
0%
SHOP 18.6 1 0 1
0%
SHOP 19.6 1 0 1
0%
SHOP 20.01 2 0 2
0%
SHOP 24.91 4 0 4
0%
SHOP 39.49 1 0 1
0%
SHOP 46.5 1 0 1
0%

B-2

Type Carpet (sq.ft) Total Booked Available Status
BUNGLOW 307.97 1 0 1
0%

Construction Progress

B-1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

B-2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings 1%
DG 100%
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solar Panel 100%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.