SHUBHVASTU PLOT NO. 7-PHASE 1

by SAVJIBHAI BAVJIBHAI KODINARIYA Individual
Certificate Signed P51700007184
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700007184
Registration No.
REA51700018700
Registration Date
2017-08-17
Developer
SAVJIBHAI BAVJIBHAI KODINARIYA Individual
Architect
Destination Architecture Interior Designs
Project Bank
ICICI BANK LIMITED
Proposed Possession
2018-12-31
Revised Possession
2018-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
6
Project Area
5815.00 sq.m
Total FSI
4779.00
Approved FSI
4779.00
MahaRERA QR
SHUBHVASTU PLOT NO. 7-PHASE 1
MahaRERA — P51700007184
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors6
Sanctioned6
🚗Open Parking9
🅿️Closed Parking1
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🚗Open Parking24
🅿️Closed Parking1
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🚗Open Parking6
🅿️Closed Parking1
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🚗Open Parking5
🅿️Closed Parking1
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Rk 22.6200008392334 0 0 0
0%
1Bhk 30.59000015258789 0 0 0
0%
1Bhk 31.059999465942383 0 0 0
0%
1Bhk 33.59000015258789 0 0 0
0%
1Bhk 38.599998474121094 0 0 0
0%
1Bhk 40.25 0 0 0
0%
1Bhk 42.720001220703125 0 0 0
0%
1Bhk 44.380001068115234 0 0 0
0%

Wing-A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 30.59 2 2 0
100%
1 BHK 31.06 2 0 2
0%
1 BHK 33.59 10 5 5
50%
1 RK 22.62 5 4 1
80%

Wing-B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 30.59 2 1 1
50%
1 BHK 31.06 2 0 2
0%
1 BHK 33.59 10 1 9
10%
1 RK 22.62 5 4 1
80%

Wing-C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 31.06 8 2 6
25%
1 BHK 33.59 10 6 4
60%

Wing-D

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 31.06 8 4 4
50%
1 BHK 33.59 10 2 8
20%

Wing-E

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 38.6 4 3 1
75%
1 BHK 40.25 4 1 3
25%
1 BHK 42.72 4 2 2
50%
1 BHK 44.38 6 2 4
33%

Wing-F

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 38.6 4 2 2
50%
1 BHK 40.25 4 0 4
0%
1 BHK 42.72 4 1 3
25%
1 BHK 44.38 6 2 4
33%

Construction Progress

WING-A

Basement (if any)100%

Wing-A

Excavation100%

WING-A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing-A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING-A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing-A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING-A

Plinth100%
Podiums (if any) 0%

Wing-A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING-A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing-A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING-A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing-A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING-B

Basement (if any)100%

Wing-B

Excavation100%

WING-B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing-B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING-B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing-B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING-B

Plinth100%
Podiums (if any) 0%

Wing-B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING-B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing-B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING-B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing-B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING-C

Basement (if any)100%

Wing-C

Excavation100%

WING-C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing-C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING-C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing-C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING-C

Plinth100%
Podiums (if any) 0%

Wing-C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING-C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing-C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING-C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing-C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING-D

Basement (if any)100%

Wing-D

Excavation100%

WING-D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing-D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING-D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing-D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING-D

Plinth100%
Podiums (if any) 0%

Wing-D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING-D

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing-D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING-D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing-D

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING-E

Basement (if any)100%

Wing-E

Excavation100%

WING-E

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing-E

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING-E

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing-E

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING-E

Plinth100%
Podiums (if any) 0%

Wing-E

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING-E

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing-E

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING-E

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing-E

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING-F

Basement (if any)100%

Wing-F

Excavation100%

WING-F

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing-F

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING-F

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing-F

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING-F

Plinth100%
Podiums (if any) 0%

Wing-F

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING-F

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing-F

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING-F

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing-F

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting 100%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.