Project Information

RERA Certificate No.
P51900033361
Registration No.
REA51900103007
Registration Date
2022-02-16
Developer
Bhoomi Properties Partnership
Architect
Hiren
Project Bank
KOTAK MAHINDRA BANK LIMITED
Proposed Possession
2026-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
292
Units Sold
160 (55%)
Buildings
1
Project Area
16494.93 sq.m
Total FSI
117738.73
Approved FSI
31560.85
MahaRERA QR
Simana - Wing B - Phase 1
MahaRERA — P51900033361
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors63
Sanctioned63
🏠Habitable63
🔢Total Units292
🏡Residential292
⬇️Basements1
📅Completion2026-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2.5Bhk 87.5 0 0 0
0%
2.5Bhk 88.05000305175781 0 0 0
0%
2.5Bhk 88.69000244140625 0 0 0
0%
2.5Bhk 89.2300033569336 0 0 0
0%
2.5Bhk 92.12999725341797 0 0 0
0%
2Bhk 76.2300033569336 0 0 0
0%
2Bhk 76.77999877929688 0 0 0
0%
2Bhk 77.25 0 0 0
0%
2Bhk 77.80000305175781 0 0 0
0%
2Bhk 82.41999816894531 0 0 0
0%
3Bhk 104.70999908447266 0 0 0
0%
3Bhk 105.2699966430664 0 0 0
0%
3Bhk 105.61000061035156 0 0 0
0%
3Bhk 106.16999816894531 0 0 0
0%
3Bhk 109.31999969482422 0 0 0
0%
3Bhk 118.13999938964844 0 0 0
0%
3Bhk 118.80999755859375 0 0 0
0%
3Bhk 119.12000274658203 0 0 0
0%
3Bhk 119.37000274658203 0 0 0
0%
3Bhk 135.16000366210938 0 0 0
0%
4Bhk 166.10000610351562 0 0 0
0%
5.5Bhk 202.75 0 0 0
0%

Simana - Wing B - Phase 1

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 76.23 26 16 10
62%
2 BHK 76.78 22 4 18
18%
2 BHK 77.25 16 0 16
0%
2 BHK 77.8 28 0 28
0%
2 BHK 82.42 6 0 6
0%
2.5 BHK 87.5 22 21 1
95%
2.5 BHK 88.05 18 12 6
67%
2.5 BHK 88.69 14 2 12
14%
2.5 BHK 89.23 24 1 23
4%
2.5 BHK 92.13 6 0 6
0%
3 BHK 104.71 22 17 5
77%
3 BHK 105.27 18 8 10
44%
3 BHK 105.61 14 1 13
7%
3 BHK 106.17 24 0 24
0%
3 BHK 109.32 6 0 6
0%
3 BHK 118.14 4 2 2
50%
3 BHK 118.81 2 2 0
100%
3 BHK 119.12 4 4 0
100%
3 BHK 119.37 4 0 4
0%
3 BHK 135.16 1 0 1
0%
4 BHK 166.1 4 0 4
0%
5.5 BHK 202.75 7 0 7
0%

Construction Progress

Simana - Wing B - Phase 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises79%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises79%
Overall Percentage of Completion of the work done For the entire Building /Wing66%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure86%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure86%

RERA Registered Amenities

Aggregate area of recreational Open Space
Club House and Swimming Pool
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.