SUNRISE CRESTVIEW

by SUNRISE LIFESPACES LLP Limited Liability Partnership
Certificate SignedPR1330002502397
SUNRISE CRESTVIEWProject photos will appear here when available.

Project Information

RERA Certificate No.
PR1330002502397
Registration No.
PR1330002502397
Registration Date
2026-02-18
Developer
SUNRISE LIFESPACES LLP Limited Liability Partnership
Proposed Possession
2030-04-30
Revised Possession
2029-12-31
Total Units
305
Units Sold
30 (10%)
Buildings
2
Project Area
16004.02 sq.m
MahaRERA QR
SUNRISE CRESTVIEW
MahaRERA โ€” PR1330002502397
Scan to verify on MahaRERA portal

Wing-wise Details

๐Ÿ—๏ธProposed Floors15
โœ…Sanctioned15
๐Ÿ Habitable15
๐Ÿ”ขTotal Units153
๐ŸกResidential138
๐ŸขNon-Residential15
๐Ÿ—๏ธProposed Floors15
โœ…Sanctioned15
๐Ÿ Habitable14
๐Ÿ”ขTotal Units152
๐ŸกResidential152

Construction Progress

A1

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure27%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor90%

A2

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure27%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor90%

RERA Registered Amenities

โฌœAggregate area of recreational Open Space
โฌœCommunity Buildings
โœ…Electrical meter room, sub-station, receiving station
โœ…Energy managemcnt
โœ…Fire protection and fire safety requirements
โœ…Internal Roads & Footpaths
โฌœLandscaping & Tree Planting
โœ…Open Parking
โœ…Sewerage (Chamber, Lines, Septic Tank , STP)
โœ…Solid Waste Management And Disposal
โœ…Storm Water Drains
โฌœStreet Lighting
โœ…Treatment And Disposal Of Sewage And Sullage Water
โœ…Water Supply
โœ…Water conservation /Rain water harvesting