📞 +91 98200 30685 ✉️
RERA: A51800043517

Sunteck City Avenue 2

by Sunteck Realty Limited Company
Certificate Signed P51800002637
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800002637
Registration No.
REA51800007797
Registration Date
2021-09-09
Developer
Sunteck Realty Limited Company
Project Bank
HDFC BANK
Proposed Possession
2022-04-30
Revised Possession
2022-04-30
Extended Possession
2023-04-30
Units Sold
0
Buildings
3
Project Area
6858.88 sq.m
Total FSI
40783.45
Approved FSI
29928.99
MahaRERA QR
Sunteck City Avenue 2
MahaRERA — P51800002637
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors11
Sanctioned11
🚗Open Parking10
🅿️Closed Parking21
📅Completion2023-04-30
🏗️Proposed Floors37
Sanctioned37
⬇️Basements2
🚗Open Parking16
🅿️Closed Parking411
📅Completion2023-04-30
🏗️Proposed Floors37
Sanctioned37
⬇️Basements2
🚗Open Parking16
🅿️Closed Parking411
📅Completion2023-04-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 48.58000183105469 0 0 0
0%
1 Rk 28.780000686645508 0 0 0
0%
1 Rk 33.619998931884766 0 0 0
0%
1 Rk 39.45000076293945 0 0 0
0%
2 Bhk 53.7599983215332 0 0 0
0%
2 Bhk 57.380001068115234 0 0 0
0%
2 Bhk 58.220001220703125 0 0 0
0%
2 Bhk 62.790000915527344 0 0 0
0%
2 Bhk 65.31999969482422 0 0 0
0%
2 Bhk 65.79000091552734 0 0 0
0%
2 Bhk 75.95999908447266 0 0 0
0%
2 Bhk 82.58000183105469 0 0 0
0%
2Bhk 57.380001068115234 0 0 0
0%
3 Bhk 83.08000183105469 0 0 0
0%
3 Bhk 83.20999908447266 0 0 0
0%
4 Bhk 102.19999694824219 0 0 0
0%
Comm 50.619998931884766 0 0 0
0%
Mpr 17.899999618530273 0 0 0
0%
Mpr 21.5 0 0 0
0%

R 2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 48.58 4 0 4
0%
1 RK 28.78 1 0 1
0%
1 RK 33.62 1 0 1
0%
1 RK 39.45 1 0 1
0%
2 BHK 62.79 1 0 1
0%
2 BHK 75.96 1 0 1
0%
2 BHK 82.58 1 0 1
0%
Comm 50.62 1 0 1
0%
MPR 17.9 1 0 1
0%
MPR 21.5 1 0 1
0%

R1 Wing A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 53.76 40 29 11
72%
2 BHK 57.38 40 29 11
72%
2 BHK 58.22 40 29 11
72%
2 BHK 65.32 34 24 10
71%
2 BHK 65.79 40 29 11
72%
3 BHK 83.08 34 25 9
74%
3 BHK 83.21 34 22 12
65%
4 BHK 102.2 6 5 1
83%

R1 Wing B

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 53.76 40 29 11
72%
2 BHK 57.38 40 29 11
72%
2 BHK 58.22 40 29 11
72%
2 BHK 65.32 34 24 10
71%
2 BHK 65.79 40 29 11
72%
3 BHK 83.08 34 24 10
71%
3 BHK 83.21 34 24 10
71%
4 BHK 102.2 6 5 1
83%

Construction Progress

R 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

R1 Wing A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises99%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

R1 Wing B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises99%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 99%
Landscaping & Tree Planting 100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.