📞 +91 98200 30685 ✉️
RERA: A51800043517

4TH AVENUE Sunteck City, ODC, Goregaon West

by Satguru Corporate Services Pvt. Ltd.
Certificate Signed P51800023072
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800023072
Registration No.
REA51800065355
Registration Date
2021-09-08
Developer
Satguru Corporate Services Pvt. Ltd.
Project Bank
HDFC BANK
Proposed Possession
2025-12-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
674
Units Sold
530 (79%)
Buildings
2
Project Area
9011.01 sq.m
Total FSI
55751.55
Approved FSI
50335.90
MahaRERA QR
4TH AVENUE Sunteck City, ODC, Goregaon West
MahaRERA — P51800023072
Scan to verify on MahaRERA portal

Wing-wise Details

⬇️Basements3
🅿️Closed Parking404
📅Completion2025-12-30
⬇️Basements3
🅿️Closed Parking396
📅Completion2025-12-30

Apartment Configurations

Tower A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 59.86 174 141 33
81%
3 BHK 89.97 164 115 49
70%

Tower B

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 59.86 176 139 37
79%
3 BHK 83.76 74 53 21
72%
3 BHK 96.24 86 63 23
73%

Construction Progress

Tower A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.84%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate72%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.84%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises86%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises83%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises42%
Sanitary Fittings within the flats / premises86%
Slabs of Super Structure87%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.68%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks84%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing82%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure87%

Tower B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.82%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate78%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.82%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises84%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises83%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises42%
Sanitary Fittings within the flats / premises84%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.69%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks82%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure85%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 80%
Energy management
Fire Protection And Fire Safety Requirements 80%
Landscaping & Tree Planting 70%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 80%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting 70%
Treatment And Disposal Of Sewage And Sullage Water 70%
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.