Umiya Dham

by Shree Mangalmurti Developers
Kept in Abeyance P51700007114
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700007114
Registration No.
REA51700016276
Developer
Shree Mangalmurti Developers
Architect
Raj Associates Partner Sandhya R Khanbayat
Project Bank
AXIS BANK
Proposed Possession
2019-07-31
Revised Possession
2022-07-31
Extended Possession
1900-01-01
Buildings
3
Project Area
5080.00 sq.m
Total FSI
2617.09
Approved FSI
2617.09
MahaRERA QR
Umiya Dham
MahaRERA — P51700007114
Scan to verify on MahaRERA portal

Wing-wise Details

📅Completion2021-07-31
📅Completion1900-01-01
📅Completion2021-07-31

Apartment Configurations

A

Type Carpet (sq.ft) Total Booked Available Status
RESIDENCY 28.45 6 6 0
100%
RESIDENCY 29.11 5 5 0
100%
RESIDENCY 29.53 15 15 0
100%
RESIDNCY 27.49 5 4 1
80%
SHOP 8.31 3 3 0
100%
SHOP 9.94 3 3 0
100%
SHOP 13.44 3 3 0
100%

A1

Type Carpet (sq.ft) Total Booked Available Status
RESIDENCY 29.53 4 0 4
0%
RESIDENCY 38.28 4 0 4
0%
RESIDENCY 39.42 4 0 4
0%
SHOP 8.31 1 0 1
0%
SHOP 8.82 1 0 1
0%
SHOP 9.94 2 1 1
50%
SHOP 10.74 1 1 0
100%
SHOP 13.44 2 0 2
0%

B

Type Carpet (sq.ft) Total Booked Available Status
RESIDENCY 29.39 10 8 2
80%
RESIDENCY 32.4 5 4 1
80%
RESIDENCY 41.64 4 4 0
100%

Construction Progress

A

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises90%
Overall Percentage of Completion of the work done For the entire Building /Wing65%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises50%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

A1

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises10%
Overall Percentage of Completion of the work done For the entire Building /Wing30%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises10%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure80%

B

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 80%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting 50%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 60%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting 50%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.