RERA: A51800043517

UNIQUE ESTATE

by UNIQUE SHANTI REALTORS Others
Certificate Signed P51700006459
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700006459
Registration No.
REA51700012828
Registration Date
2020-06-14
Developer
UNIQUE SHANTI REALTORS Others
Architect
Mr Avinash Mhatre
Project Bank
AXIS BANK
Proposed Possession
2020-12-30
Revised Possession
2020-12-30
Extended Possession
2021-12-30
Units Sold
0
Buildings
5
Project Area
1831.47 sq.m
Total FSI
14971.51
Approved FSI
5073.93
MahaRERA QR
UNIQUE ESTATE
MahaRERA — P51700006459
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors14
Sanctioned14
🅿️Closed Parking15
📅Completion2020-06-30
🏗️Proposed Floors14
Sanctioned14
🅿️Closed Parking14
📅Completion2020-06-30
📅Completion1900-01-01
📅Completion1900-01-01
🏗️Proposed Floors13
Sanctioned13
🅿️Closed Parking11
📅Completion2020-06-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
0 0 0 0
0%
1 Bhk 37.08000183105469 0 0 0
0%
1 Bhk 39.06999969482422 0 0 0
0%
1Bhk 37.2599983215332 0 0 0
0%
2 Bhk 54.220001220703125 0 0 0
0%
2 Bhk 55.45000076293945 0 0 0
0%
Shops 13.050000190734863 0 0 0
0%
Shops 16.81999969482422 0 0 0
0%
Shops 17.690000534057617 0 0 0
0%
Shops 20.030000686645508 0 0 0
0%
Shops 22.040000915527344 0 0 0
0%

B Wing Type B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 37.26 22 0 22
0%
2 BHK 54.22 44 2 42
5%

C Wing Type B1

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 37.26 24 0 24
0%
2 BHK 54.22 48 0 48
0%

D Wing Type C

Type Carpet (sq.ft) Total Booked Available Status
0 0 0 0
0%

E Wing Type D

Type Carpet (sq.ft) Total Booked Available Status
0 0 0 0
0%

Wing A Type A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 37.08 47 26 21
55%
1 BHK 39.07 12 3 9
25%
2 BHK 55.45 36 15 21
42%
SHOPS 13.05 3 3 0
100%
SHOPS 16.82 2 0 2
0%
SHOPS 17.69 4 3 1
75%
SHOPS 20.03 1 0 1
0%
SHOPS 22.04 2 2 0
100%

Construction Progress

B WING TYPE B

Basement (if any)100%

B Wing Type B

Excavation100%

B WING TYPE B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

B Wing Type B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

B WING TYPE B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

B Wing Type B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

B WING TYPE B

Plinth100%
Podiums (if any) 0%

B Wing Type B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

B WING TYPE B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

B Wing Type B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

B WING TYPE B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

B Wing Type B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

C WING TYPE B1

Basement (if any)100%

C Wing Type B1

Excavation100%

C WING TYPE B1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

C Wing Type B1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

C WING TYPE B1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

C Wing Type B1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

C WING TYPE B1

Plinth100%
Podiums (if any) 0%

C Wing Type B1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

C WING TYPE B1

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

C Wing Type B1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

C WING TYPE B1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

C Wing Type B1

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

D WING TYPE C

Basement (if any)0%

D Wing Type C

Excavation0%

D WING TYPE C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

D Wing Type C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

D WING TYPE C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

D Wing Type C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

D WING TYPE C

Plinth0%
Podiums (if any) 0%

D Wing Type C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

D WING TYPE C

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

D Wing Type C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

D WING TYPE C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

D Wing Type C

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

E WING TYPE D

Basement (if any)0%

E Wing Type D

Excavation0%

E WING TYPE D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

E Wing Type D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

E WING TYPE D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

E Wing Type D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

E WING TYPE D

Plinth0%
Podiums (if any) 0%

E Wing Type D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

E WING TYPE D

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

E Wing Type D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

E WING TYPE D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

E Wing Type D

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

WING A TYPE A

Basement (if any)100%

Wing A Type A

Excavation100%

WING A TYPE A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing A Type A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING A TYPE A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing A Type A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING A TYPE A

Plinth100%
Podiums (if any) 0%

Wing A Type A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING A TYPE A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing A Type A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING A TYPE A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing A Type A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.