V
✓ MahaRERA P99000031206RERA: no litigation reportedVarun Industrial Estate - Industrial Building No 2
📍 Village Bilalpada, Palghar · 401208
37
Units
2023
Possession
1
Buildings
Certificate Signed
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: New · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Mar 2023
Status
New
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
Industrial Gala545–1,723 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P99000031206
Registered
2021-10-11
Litigation
No reported in source
Escrow Bank
BHARAT COOPERATIVE BANK MUMBAI LIMITED
Architect
Ajay Wade And Associates
Total FSI
3124
04
Buildings · 1 Wing(s)
Varun Industrial Estate- Industrial Building No 23 floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Village Bilalpada
19.4120960,72.8565060
19.4120960,72.8565060
▸ Explore map & Street View — for verified buyers
09
Construction Progress
94% avgBasement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Plinth100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Slabs of Super Structure100%
Overall Percentage of Completion of the work done For the entire Building /Wing65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
10
Amenities
Electrical Meter Room, Sub-Station, Receiving StationLandscaping & Tree PlantingOpen ParkingSewerage (Chamber, Lines, Septic Tank , STP)Solid Waste Management And DisposalStorm Water DrainsTreatment And Disposal Of Sewage And Sullage WaterWater Conservation, Rain water HarvestingWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory08
Property Rates in Village Bilalpada
Residential · Sale
₹10,000–45,000/sqft
Commercial · Sale
₹6,500–15,000/sqft
2 BHK · Rent
₹20,000–45,000/mo
Full rates
?
Frequently Asked Questions
When is possession of Varun Industrial Estate - Industrial Building No 2?
As per MahaRERA, proposed possession is Mar 2023.
Is Varun Industrial Estate - Industrial Building No 2 RERA-registered?
Yes — MahaRERA registration P99000031206, registered 2021-10-11. The current MahaRERA source record reports no litigations.
Who is the developer?
Deepak Bhupatrai Vora — 2 projects tracked on Mumbai Property Exchange. View their track record ▸
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.