Vighneshwar Residency

by Pushpak Enterprises
Kept in AbeyanceP51700002078
Vighneshwar ResidencyProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700002078
Registration No.
REA51700008196
Developer
Pushpak Enterprises
Project Bank
HDFC BANK
Proposed Possession
2018-03-31
Revised Possession
2021-12-30
Extended Possession
1900-01-01
Buildings
3
Project Area
1976.60 sq.m
Total FSI
2963.55
MahaRERA QR
Vighneshwar Residency
MahaRERA โ€” P51700002078
Scan to verify on MahaRERA portal

Wing-wise Details

๐Ÿ…ฟ๏ธClosed Parking14
๐Ÿ“…Completion1900-01-01
๐Ÿ…ฟ๏ธClosed Parking14
๐Ÿ“…Completion1900-01-01
๐Ÿ“…Completion1900-01-01

Apartment Configurations

Vighneshwar Residency A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.21413
25%
1 BHK38.46862
75%
I BHK39.53404
0%
IRK27.5844
50%

Vighneshwar Residency B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK32.21422
50%
1 BHK37.5413
25%
1 BHK38.75404
0%
1 BHK38.88404
0%
1 BHK39.2413
25%
1 BHK39.24404
0%

Vighneshwar Residency C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK36.85101
0%
1 BHK37.75404
0%
1 BHK38.3422
50%
1 BHK38.83101
0%
1 BHK39.7404
0%
1 BHK39.77413
25%
1 BHK40.25404
0%
1 BHK40.59110
100%
1 RK27.52101
0%
1RK24.22101
0%
1RK24.31505
0%

Construction Progress

Vighneshwar Residency A

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing20%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

Vighneshwar Residency B

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises30%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.42%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Vighneshwar Residency C

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.42%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

โฌœAggregate area of recreational Open Space
โฌœCommunity Buildings
โœ…Electrical Meter Room, Sub-Station, Receiving Station
โฌœEnergy management
โฌœFire Protection And Fire Safety Requirements
โœ…Landscaping & Tree Planting
โœ…Open Parking
โœ…Sewerage (Chamber, Lines, Septic Tank , STP)
โฌœSolid Waste Management And Disposal
โœ…Storm Water Drains
โฌœStreet Lighting
โฌœTreatment And Disposal Of Sewage And Sullage Water
โœ…Water Conservation, Rain water Harvesting
โœ…Water Supply