📞 +91 98200 30685 ✉️
RERA: A51800043517

Zenia

by ROMA BUILDERS PRIVATE LIMITED Company
Certificate Signed P51700002912
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700002912
Registration No.
REA51700005989
Registration Date
2017-08-04
Developer
ROMA BUILDERS PRIVATE LIMITED Company
Architect
Sharmishtha Mukerjee Shinde
Project Bank
ICICI BANK LIMITED
Proposed Possession
2018-12-31
Revised Possession
2018-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
964.00 sq.m
Total FSI
6353.38
Approved FSI
6353.38
MahaRERA QR
Zenia
MahaRERA — P51700002912
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors12
Sanctioned12
🚗Open Parking24
🅿️Closed Parking64
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
Gr Flr Shop 1 143.52000427246094 0 0 0
0%
Gr Flr Shop 2 139.4499969482422 0 0 0
0%
Gr Flr Shop 3 149.97999572753906 0 0 0
0%
Gr Flr Shop 4 63.79999923706055 0 0 0
0%
Offc 1 Typical 142.30999755859375 0 0 0
0%
Offc No 2 Typical 139.0800018310547 0 0 0
0%
Offc No 3 Typical 183.75 0 0 0
0%
Offc No 301 142.30999755859375 0 0 0
0%
Offc No 302 139.0800018310547 0 0 0
0%
Offc No 303 183.75 0 0 0
0%
Offc No 304 77.4000015258789 0 0 0
0%
Offc No 305 74.30000305175781 0 0 0
0%
Offc No 306 74.80999755859375 0 0 0
0%
Offc No 4 Typical 77.4000015258789 0 0 0
0%
Offc No 5 Typical 74.30000305175781 0 0 0
0%
Offc No 6 Typical 97.54000091552734 0 0 0
0%
Offc No 603 178.47000122070312 0 0 0
0%
Offc No 604 77.4000015258789 0 0 0
0%
Offc No 605 74.30000305175781 0 0 0
0%
Offc No 606 97.54000091552734 0 0 0
0%

Zenia

Type Carpet (sq.ft) Total Booked Available Status
Gr Flr Shop 1 143.52 1 1 0
100%
Gr Flr Shop 2 139.45 1 1 0
100%
Gr Flr Shop 3 149.98 1 1 0
100%
Gr Flr Shop 4 63.8 1 1 0
100%
Offc 1 Typical 142.31 6 0 6
0%
Offc No 2 Typical 139.08 6 0 6
0%
Offc No 3 Typical 183.75 6 0 6
0%
Offc No 301 142.31 1 0 1
0%
Offc No 302 139.08 1 0 1
0%
Offc No 303 183.75 1 0 1
0%
Offc No 304 77.4 1 0 1
0%
Offc No 305 74.3 1 1 0
100%
Offc No 306 74.81 1 1 0
100%
Offc No 4 Typical 77.4 6 0 6
0%
Offc No 5 Typical 74.3 6 0 6
0%
Offc No 6 Typical 97.54 6 0 6
0%
Offc No 603 178.47 1 0 1
0%
Offc No 604 77.4 1 0 1
0%
Offc No 605 74.3 1 0 1
0%
Offc No 606 97.54 1 0 1
0%

Construction Progress

Zenia

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.