RERA: A51800043517

Twentyfive South -Tower C

by Twenty Five South Reality Limited Company
Certificate Signed P51900030729
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51900030729
Registration No.
REA51900093146
Registration Date
2021-09-08
Developer
Twenty Five South Reality Limited Company
Architect
Spacage Consultants
Project Bank
HDFC BANK
Proposed Possession
2030-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
29
Units Sold
22 (76%)
Buildings
1
Project Area
594.25 sq.m
Total FSI
18414.41
Approved FSI
181.98
MahaRERA QR
Twentyfive South -Tower C
MahaRERA — P51900030729
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors59
Sanctioned59
🏠Habitable34
🔢Total Units29
🏡Residential29
⬇️Basements1
🅿️Closed Parking1
📅Completion2030-12-31

Apartment Configurations

Twentyfive South-Tower C

Type Carpet (sq.ft) Total Booked Available Status
4 BHK 348.88 18 14 4
78%
4 BHK 351.37 3 3 0
100%
4 BHK 351.4 2 2 0
100%
6 BHK Duplex 578.61 5 2 3
40%

Construction Progress

TwentyFive South-Tower C

Basement (if any)100%

Twentyfive South-Tower C

Excavation100%

TwentyFive South-Tower C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%

Twentyfive South-Tower C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

TwentyFive South-Tower C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

Twentyfive South-Tower C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises15%

TwentyFive South-Tower C

Plinth100%
Podiums (if any) 100%

Twentyfive South-Tower C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

TwentyFive South-Tower C

Sanitary Fittings within the flats / premises10%
Slabs of Super Structure65%

Twentyfive South-Tower C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.5%

TwentyFive South-Tower C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%

Twentyfive South-Tower C

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing2%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure25%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Fitness Center
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Society Office
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Swimming Pool
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.