A
✓ MahaRERA P51800024957RERA: no litigation reportedAlcove Wing B
📍 Opposite Saki Vihar Complex Chandivali, Mumbai Suburban · 400072
62
Units
2024
Possession
1
Buildings
Kept in Abeyance
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: New Project · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Jun 2024
Status
New Project
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
2 BHK757–869 ft²On request
3 BHK860–1,024 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P51800024957
Registered
—
Litigation
No reported in source
Escrow Bank
AXIS BANK LTD
Architect
Edifice Consultant Prv. Ltd
Total FSI
5439
04
Buildings · 1 Wing(s)
Alcove Wing B— floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Opposite Saki Vihar Complex Chandivali
▸ Explore map & Street View — for verified buyers
09
Construction Progress
0% avgExcavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%
10
Amenities
Aggregate area of recreational Open SpaceClub houseElectrical Meter Room, Sub-Station, Receiving StationEnergy managementFire Protection And Fire Safety RequirementsLandscaping & Tree PlantingSewerage (Chamber, Lines, Septic Tank , STP)Solid Waste Management And DisposalStorm Water DrainsStreet LightingSwimming PoolTreatment And Disposal Of Sewage And Sullage WaterWater Conservation, Rain water HarvestingWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory14
More by Mahindra Lifespace Developers
?
Frequently Asked Questions
When is possession of Alcove Wing B?
As per MahaRERA, proposed possession is Jun 2024.
Is Alcove Wing B RERA-registered?
Yes — MahaRERA registration P51800024957. The current MahaRERA source record reports no litigations.
Who is the developer?
Mahindra Lifespace Developers — 15 projects tracked on Mumbai Property Exchange. View their track record ▸
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.




