📞 +91 98200 30685 ✉️
RERA: A51800043517

Arkade Vistas

by Arkade Developers Limited Company
Certificate Signed P51800077278
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800077278
Registration No.
REA51800163596
Registration Date
2024-08-02
Developer
Arkade Developers Limited Company
Architect
A R Design Studio
Project Bank
ICICI BANK LIMITED
Proposed Possession
2027-12-31
Total Units
124
Units Sold
40 (32%)
Project Area
3390.60 sq.m
Total FSI
10067.93
Approved FSI
10067.93
MahaRERA QR
Arkade Vistas
MahaRERA — P51800077278
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors22
Sanctioned22
🏠Habitable22
🔢Total Units62
🏡Residential62
🅿️Closed Parking80
📅Completion2027-12-31
🏗️Proposed Floors22
Sanctioned22
🏠Habitable22
🔢Total Units62
🏡Residential62
🅿️Closed Parking80
📅Completion2027-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 63.91999816894531 0 0 0
0%
2Bhk 65.76000213623047 0 0 0
0%
2Bhk 66.44999694824219 0 0 0
0%
2Bhk 68.33000183105469 0 0 0
0%
2Bhk 71.2699966430664 0 0 0
0%
2Bhk 71.33000183105469 0 0 0
0%
2Bhk 72.87999725341797 0 0 0
0%
2Bhk 73.1500015258789 0 0 0
0%
2Bhk 74.56999969482422 0 0 0
0%
2Bhk Existing Member 66.44999694824219 0 0 0
0%
3Bhk 88.43000030517578 0 0 0
0%
3Bhk 93.61000061035156 0 0 0
0%
3Bhk 96.3499984741211 0 0 0
0%
3Bhk 98.5199966430664 0 0 0
0%
3Bhk Exisitng Member 82.08000183105469 0 0 0
0%
3Bhk Existing Member 75.77999877929688 0 0 0
0%
3Bhk Existing Member 82.04000091552734 0 0 0
0%
3Bhk Existing Member 86.81999969482422 0 0 0
0%
3Bhk Existing Member 94.31999969482422 0 0 0
0%

Wing A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 63.92 14 6 8
43%
2 BHK 66.45 19 11 8
58%
2 BHK 72.88 1 1 0
100%
2 BHK 74.57 1 0 1
0%
2 BHK Existing Member 66.45 13 0 13
0%
3 BHK 88.43 6 0 6
0%
3 BHK Exisitng Member 82.08 8 0 8
0%

Wing B

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 65.76 1 0 1
0%
2 BHK 66.45 2 0 2
0%
2 BHK 68.33 1 0 1
0%
2 BHK 71.27 8 7 1
88%
2 BHK 71.33 10 4 6
40%
2 BHK 73.15 1 0 1
0%
2 BHK Existing Member 66.45 9 0 9
0%
3 BHK 93.61 2 1 1
50%
3 BHK 96.35 8 3 5
38%
3 BHK 98.52 10 4 6
40%
3 BHK Existing Member 75.78 1 0 1
0%
3 BHK Existing Member 82.04 7 0 7
0%
3 BHK Existing Member 86.82 1 0 1
0%
3 BHK Existing Member 94.32 1 0 1
0%

Construction Progress

Wing A

Basement (if any)50%
Excavation50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing10%
Plinth50%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks9%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth50%
X number of Podiums0%
X number of Slabs of Super Structure0%

Wing B

Basement (if any)50%
Excavation80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing10%
Plinth50%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks9%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth50%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Car Parking System
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Fitness Center and Society Office
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal 10%
Storm Water Drains
Street Lighting
Swimming Pool
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.