Livsmart Kurla

by D. K. Realty (India) Pvt. Ltd. Company
Certificate SignedP51800000340

Project Information

RERA Certificate No.
P51800000340
Registration No.
REA51800003739
Registration Date
2026-01-09
Developer
D. K. Realty (India) Pvt. Ltd. Company
Architect
Bidco Engineering Division
Project Bank
AXIS BANK
Proposed Possession
2021-12-30
Revised Possession
2021-12-30
Extended Possession
1900-01-01
Total Units
1582
Units Sold
570 (36%)
Buildings
28
Project Area
18564.00 sq.m
Total FSI
85187.65
Approved FSI
85187.65
MahaRERA QR
Livsmart Kurla
MahaRERA — P51800000340
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking19
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking31
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking31
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking32
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking24
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking13
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking24
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking32
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking39
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking15
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking35
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking24
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking43
📅Completion2020-12-31
🏗️Proposed Floors16
Sanctioned16
⬇️Basements3
🅿️Closed Parking25
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking35
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking30
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking23
📅Completion2020-12-31
🏗️Proposed Floors16
Sanctioned16
⬇️Basements3
🅿️Closed Parking22
📅Completion2020-12-31
🏗️Proposed Floors16
Sanctioned16
⬇️Basements3
🅿️Closed Parking26
📅Completion2020-12-31
🏗️Proposed Floors16
Sanctioned16
⬇️Basements3
🅿️Closed Parking22
📅Completion2020-12-31
🏗️Proposed Floors16
Sanctioned16
⬇️Basements3
🅿️Closed Parking26
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking30
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking24
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking19
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking25
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking31
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking25
📅Completion2020-12-31
🏗️Proposed Floors17
Sanctioned17
⬇️Basements3
🅿️Closed Parking32
📅Completion2020-12-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
First Floor Shop147.92999267578125000
0%
First Floor Shop209.92999267578125000
0%
First Floor Shop218.58999633789062000
0%
First Floor Shop308.239990234375000
0%
Ground Floor Shop132.99000549316406000
0%
Ground Floor Shop138.32000732421875000
0%
Ground Floor Shop152.33999633789062000
0%
Ground Floor Shop197.6300048828125000
0%
Ground Floor Shop207.25000
0%
Onebhk35.45000076293945000
0%
Onebhktype135.84000015258789000
0%
Onebhktype235.45000076293945000
0%
Onebhktype235.84000015258789000
0%
Onebhktype336.369998931884766000
0%
Twobhktype151.150001525878906000
0%
Twobhktype153.65999984741211000
0%
Twobhktype1compact48.599998474121094000
0%
Twobhktype251.150001525878906000
0%
Twobhktype2compact47.439998626708984000
0%
Twobhktype351.09000015258789000
0%
Twobhktype3compact46.90999984741211000
0%
Twobhktype451.5000
0%
Twobhktype4compact46.72999954223633000
0%
Twobhktype5compact46.33000183105469000
0%
Twobhktype6compact45.810001373291016000
0%

Wing 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE135.84431627
37%
TWO BHKTYPE151.151266
50%

Wing 10

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE135.8414104
71%
TWO BHKTYPE153.6612120
100%
TWO BHKTYPE1COMPACT48.614410
29%
TWO BHKTYPE3COMPACT46.9112102
83%

Wing 11

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE135.841477
50%
TWO BHKTYPE153.6612120
100%
TWO BHKTYPE1COMPACT48.614104
71%
TWO BHKTYPE3COMPACT46.911248
33%

Wing 12

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHK35.4528325
11%
ONE BHKTYPE235.8430327
10%
TWO BHKTYPE251.1524186
75%

Wing 13

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE135.84281612
57%
TWO BHKTYPE251.1524168
67%

Wing 14

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE336.37404
0%
TWO BHKTYPE5COMPACT46.3324204
83%
TWO BHKTYPE6COMPACT45.8128244
86%

Wing 15

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE135.8428721
25%
TWO BHKTYPE251.1524024
0%

Wing 16

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHK35.45281414
50%
ONE BHKTYPE235.84301614
53%
TWO BHKTYPE251.1524195
79%

Wing 17

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE135.8416511
31%
TWO BHKTYPE1COMPACT48.61495
64%
TWO BHKTYPE3COMPACT46.9114113
79%
TWO BHKTYPE451.512111
92%

Wing 18

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE135.84513417
67%

Wing 19

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE135.84261016
38%
TWO BHKTYPE2COMPACT47.4428280
100%

Wing 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE135.84281018
36%
TWO BHKTYPE251.1524222
8%

Wing 20

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHK35.45281414
50%
ONE BHKTYPE235.84301020
33%
TWO BHKTYPE251.1524123
4%

Wing 21

TypeCarpet (sq.ft)TotalBookedAvailableStatus
FIRST FLOOR SHOP218.59101
0%
GROUND FLOOR SHOP207.25101
0%
ONE BHK35.451183
73%
ONE BHKTYPE235.8423185
78%
TWO BHKTYPE251.1523203
87%

Wing 22

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE135.8414131
93%
TWO BHKTYPE153.6612120
100%
TWO BHKTYPE1COMPACT48.61486
57%
TWO BHKTYPE3COMPACT46.911293
75%

Wing 23

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE135.8432248
75%
TWO BHKTYPE251.1524024
0%

Wing 24

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE135.8414104
71%
TWO BHKTYPE251.1514014
0%
TWO BHKTYPE351.0912111
92%

Wing 25

TypeCarpet (sq.ft)TotalBookedAvailableStatus
FIRST FLOOR SHOP147.93101
0%
GROUND FLOOR SHOP132.99101
0%
ONE BHKTYPE135.841156
45%
TWO BHKTYPE251.1522202
91%
TWO BHKTYPE6COMPACT45.811192
82%

Wing 26

TypeCarpet (sq.ft)TotalBookedAvailableStatus
FIRST FLOOR SHOP209.93101
0%
GROUND FLOOR SHOP197.63101
0%
TWO BHKTYPE251.1521201
95%
TWO BHKTYPE4COMPACT46.7311101
91%

Wing 27

TypeCarpet (sq.ft)TotalBookedAvailableStatus
GROUND FLOOR SHOP138.32101
0%
ONE BHKTYPE135.8422202
91%
TWO BHKTYPE251.1522202
91%

Wing 28

TypeCarpet (sq.ft)TotalBookedAvailableStatus
FIRST FLOOR SHOP308.24101
0%
GROUND FLOOR SHOP152.34101
0%
ONE BHKTYPE235.4511110
100%
TWO BHKTYPE251.1532266
81%

Wing 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE235.4523221
9%
TWO BHKTYPE251.1524024
0%
TWO BHKTYPE5COMPACT46.3327720
26%

Wing 4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE135.8428217
75%
TWO BHKTYPE251.1524195
79%

Wing 5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE135.84432320
53%
TWO BHKTYPE251.151293
75%

Wing 6

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE135.84321022
31%
TWO BHKTYPE251.15241410
58%

Wing 7

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE135.8414410
29%
TWO BHKTYPE153.6612102
83%
TWO BHKTYPE1COMPACT48.614410
29%
TWO BHKTYPE3COMPACT46.9112210
17%

Wing 8

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHKTYPE135.84322111
66%
TWO BHKTYPE251.15241014
42%

Wing 9

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ONE BHK35.4528424
14%
ONE BHKTYPE235.84301713
57%
TWO BHKTYPE251.1524186
75%

Construction Progress

WING 1

Basement (if any)100%

Wing 1

Excavation100%

WING 1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%

Wing 1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises75%

WING 1

Plinth100%
Podiums (if any) 0%

Wing 1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 1

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Wing 1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.30%

WING 1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%

Wing 1

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING 10

Basement (if any)100%

Wing 10

Excavation100%

WING 10

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 10

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 10

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%

Wing 10

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises75%

WING 10

Plinth100%
Podiums (if any) 0%

Wing 10

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 10

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Wing 10

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.24%

WING 10

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks24%

Wing 10

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING 11

Basement (if any)100%

Wing 11

Excavation100%

WING 11

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 11

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 11

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%

Wing 11

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%

WING 11

Plinth100%
Podiums (if any) 0%

Wing 11

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 11

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure93%

Wing 11

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.30%

WING 11

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%

Wing 11

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure93%

WING 12

Basement (if any)100%

Wing 12

Excavation100%

WING 12

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 12

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 12

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%

Wing 12

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises75%

WING 12

Plinth100%
Podiums (if any) 0%

Wing 12

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 12

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Wing 12

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.18%

WING 12

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks18%

Wing 12

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING 13

Basement (if any)100%

Wing 13

Excavation100%

WING 13

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 13

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 13

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises7%

Wing 13

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises7%
Overall Percentage of Completion of the work done For the entire Building /Wing26%

WING 13

Plinth100%
Podiums (if any) 0%

Wing 13

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 13

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure50%

Wing 13

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.3%

WING 13

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks3%

Wing 13

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure50%

WING 14

Basement (if any)100%

Wing 14

Excavation100%

WING 14

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 14

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 14

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%

Wing 14

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises75%

WING 14

Plinth100%
Podiums (if any) 0%

Wing 14

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 14

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Wing 14

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.30%

WING 14

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%

Wing 14

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING 15

Basement (if any)100%

Wing 15

Excavation100%

WING 15

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 15

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 15

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises3%

Wing 15

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises3%

WING 15

Plinth100%
Podiums (if any) 0%

Wing 15

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 15

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure14%

Wing 15

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.8%

WING 15

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%

Wing 15

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure14%

WING 16

Basement (if any)100%

Wing 16

Excavation100%

WING 16

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 16

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 16

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Wing 16

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

WING 16

Plinth100%
Podiums (if any) 0%

Wing 16

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 16

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Wing 16

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.2%

WING 16

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks2%

Wing 16

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

WING 17

Basement (if any)100%

Wing 17

Excavation100%

WING 17

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 17

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 17

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises3%

Wing 17

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises3%

WING 17

Plinth100%
Podiums (if any) 0%

Wing 17

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 17

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure14%

Wing 17

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.8%

WING 17

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%

Wing 17

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure14%

WING 18

Basement (if any)100%

Wing 18

Excavation100%

WING 18

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 18

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 18

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%

Wing 18

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises75%

WING 18

Plinth100%
Podiums (if any) 0%

Wing 18

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 18

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Wing 18

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%

WING 18

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%

Wing 18

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING 19

Basement (if any)100%

Wing 19

Excavation100%

WING 19

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 19

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 19

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises7%

Wing 19

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises7%

WING 19

Plinth100%
Podiums (if any) 0%

Wing 19

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 19

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure50%

Wing 19

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.15%

WING 19

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%

Wing 19

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure50%

WING 2

Basement (if any)100%

Wing 2

Excavation100%

WING 2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%

Wing 2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises75%

WING 2

Plinth100%
Podiums (if any) 0%

Wing 2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 2

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Wing 2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%

WING 2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%

Wing 2

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING 20

Basement (if any)100%

Wing 20

Excavation100%

WING 20

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 20

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 20

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises7%

Wing 20

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises7%

WING 20

Plinth100%
Podiums (if any) 0%

Wing 20

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 20

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure50%

Wing 20

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.10%

WING 20

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%

Wing 20

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure50%

WING 21

Basement (if any)100%

Wing 21

Excavation100%

WING 21

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 21

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 21

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%

Wing 21

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises2%

WING 21

Plinth100%
Podiums (if any) 0%

Wing 21

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 21

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure7%

Wing 21

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.3%

WING 21

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks3%

Wing 21

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure7%

WING 22

Basement (if any)100%

Wing 22

Excavation100%

WING 22

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 22

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 22

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%

Wing 22

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises75%

WING 22

Plinth100%
Podiums (if any) 0%

Wing 22

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 22

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Wing 22

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%

WING 22

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%

Wing 22

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING 23

Basement (if any)100%

Wing 23

Excavation100%

WING 23

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 23

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 23

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Wing 23

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

WING 23

Plinth100%
Podiums (if any) 0%

Wing 23

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 23

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Wing 23

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.2%

WING 23

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks2%

Wing 23

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

WING 24

Basement (if any)100%

Wing 24

Excavation100%

WING 24

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 24

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 24

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Wing 24

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

WING 24

Plinth100%
Podiums (if any) 0%

Wing 24

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 24

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Wing 24

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.2%

WING 24

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks2%

Wing 24

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

WING 25

Basement (if any)100%

Wing 25

Excavation100%

WING 25

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 25

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 25

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%

Wing 25

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises2%

WING 25

Plinth100%
Podiums (if any) 0%

Wing 25

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 25

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure7%

Wing 25

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.8%

WING 25

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%

Wing 25

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure7%

WING 26

Basement (if any)100%

Wing 26

Excavation100%

WING 26

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 26

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 26

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%

Wing 26

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises2%

WING 26

Plinth100%
Podiums (if any) 0%

Wing 26

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 26

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure7%

Wing 26

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.8%

WING 26

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%

Wing 26

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure7%

WING 27

Basement (if any)100%

Wing 27

Excavation100%

WING 27

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 27

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 27

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%

Wing 27

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises2%

WING 27

Plinth100%
Podiums (if any) 0%

Wing 27

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 27

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure7%

Wing 27

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.8%

WING 27

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%

Wing 27

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure7%

WING 28

Basement (if any)100%

Wing 28

Excavation100%

WING 28

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 28

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 28

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises4%

Wing 28

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises4%
Overall Percentage of Completion of the work done For the entire Building /Wing23%

WING 28

Plinth100%
Podiums (if any) 0%

Wing 28

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 28

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure14%

Wing 28

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.12%

WING 28

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks12%

Wing 28

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure14%

WING 3

Basement (if any)100%

Wing 3

Excavation100%

WING 3

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 3

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 3

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%

Wing 3

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises75%

WING 3

Plinth100%
Podiums (if any) 0%

Wing 3

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 3

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Wing 3

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.30%

WING 3

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%

Wing 3

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING 4

Basement (if any)100%

Wing 4

Excavation100%

WING 4

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 4

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 4

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%

Wing 4

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises75%

WING 4

Plinth100%
Podiums (if any) 0%

Wing 4

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 4

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Wing 4

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.30%

WING 4

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%

Wing 4

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING 5

Basement (if any)100%

Wing 5

Excavation100%

WING 5

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 5

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 5

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises8%

Wing 5

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises8%
Overall Percentage of Completion of the work done For the entire Building /Wing28%

WING 5

Plinth100%
Podiums (if any) 0%

Wing 5

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 5

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure54%

Wing 5

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.18%

WING 5

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks18%

Wing 5

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure54%

WING 6

Basement (if any)100%

Wing 6

Excavation100%

WING 6

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 6

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 6

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises3%

Wing 6

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises3%

WING 6

Plinth100%
Podiums (if any) 0%

Wing 6

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 6

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure14%

Wing 6

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.10%

WING 6

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%

Wing 6

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure14%

WING 7

Basement (if any)100%

Wing 7

Excavation100%

WING 7

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 7

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 7

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%

Wing 7

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises75%

WING 7

Plinth100%
Podiums (if any) 0%

Wing 7

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 7

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Wing 7

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.18%

WING 7

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks18%

Wing 7

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING 8

Basement (if any)100%

Wing 8

Excavation100%

WING 8

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 8

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 8

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises6%

Wing 8

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises6%

WING 8

Plinth100%
Podiums (if any) 0%

Wing 8

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 8

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure36%

Wing 8

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.15%

WING 8

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%

Wing 8

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure36%

WING 9

Basement (if any)100%

Wing 9

Excavation100%

WING 9

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing 9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING 9

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises3%

Wing 9

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises3%

WING 9

Plinth100%
Podiums (if any) 0%

Wing 9

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING 9

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure14%

Wing 9

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.10%

WING 9

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%

Wing 9

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure14%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Internal Roads & Footpaths
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.