B
✓ MahaRERA P51700052121RERA: no litigation reported285
Units
2028
Possession
3
Buildings
Certificate Signed
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: New · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Dec 2028
Status
New
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
Office Space255–344 ft²On request
1 BHK348–776 ft²On request
2 BHK589–779 ft²On request
3 BHK807–916 ft²On request
Shop1,285–1,886 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P51700052121
Registered
2023-07-24
Litigation
No reported in source
Escrow Bank
AXIS BANK
Architect
Sthapatya Nirmaan Civil & Architectural Services
Total FSI
29230
04
Buildings · 3 Wing(s)
Wing A17 floors · — units
Wing B16 floors · — units
Wing E4 floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Chole
19.2200228,73.1034850
19.2200228,73.1034850
▸ Explore map & Street View — for verified buyers
07
Promoter & Professionals
Shree Balaji RealtyNA
09
Construction Progress
52% avgBasement (if any)100%
Excavation100%
Plinth100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Stilt Floor 70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Sanitary Fittings within the flats / premises20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Slabs of Super Structure10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
Slabs of Super Structure5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
10
Amenities
Aggregate area of recreational Open SpaceElectrical Meter Room, Sub-Station, Receiving StationFire Protection And Fire Safety RequirementsLandscaping & Tree PlantingLandscaping & Tree PlantingOpen ParkingSewerage (Chamber, Lines, Septic Tank , STP)Storm Water DrainsWater Conservation, Rain water HarvestingWater SupplyWater conservation /Rain water harvesting
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory08
Property Rates in Chole
Residential · Sale
₹10,000–15,000/sqft
Commercial · Sale
₹6,500–10,000/sqft
2 BHK · Rent
₹15,000–35,000/mo
Full rates
14
More by Shree Balaji Realty
15
MahaRERA projects nearby in Chole
?
Frequently Asked Questions
When is possession of Balaji Sarvoday - A Wing, B Wing And E Wing?
As per MahaRERA, proposed possession is Dec 2028.
Is Balaji Sarvoday - A Wing, B Wing And E Wing RERA-registered?
Yes — MahaRERA registration P51700052121, registered 2023-07-24. The current MahaRERA source record reports no litigations.
Who is the developer?
Shree Balaji Realty — 269 projects tracked on Mumbai Property Exchange. View their track record ▸
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.




