📞 +91 98200 30685 ✉️
RERA: A51800043517

Cloud 36 -Phase I

by GeeCee Ventures Limited Company
Certificate Signed P51700001178
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700001178
Registration No.
REA51700006670
Registration Date
2017-07-27
Developer
GeeCee Ventures Limited Company
Architect
Satish V Ahuja & Associates (Consulting Architect)
Project Bank
HDFC BANK
Proposed Possession
2018-12-31
Revised Possession
2018-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
7716.93 sq.m
Total FSI
13621.73
Approved FSI
13621.73
MahaRERA QR
Cloud 36 -Phase I
MahaRERA — P51700001178
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors40
Sanctioned40
🅿️Closed Parking132
📅Completion2018-12-31
🏗️Proposed Floors40
Sanctioned40
🅿️Closed Parking119
📅Completion2018-12-31
🏗️Proposed Floors40
Sanctioned40
🅿️Closed Parking119
📅Completion2018-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2 Bhk 40.439998626708984 0 0 0
0%
2 Bhk 41.4010009765625 0 0 0
0%
2 Bhk 41.9739990234375 0 0 0
0%
2 Bhk 42.018001556396484 0 0 0
0%
2 Bhk 42.25699996948242 0 0 0
0%
2 Bhk 45.00299835205078 0 0 0
0%
2 Bhk 45.07099914550781 0 0 0
0%
2 Bhk 46.68000030517578 0 0 0
0%
2 Bhk 51.47800064086914 0 0 0
0%
2 Bhk 56.47600173950195 0 0 0
0%
2Bhk 41.4010009765625 0 0 0
0%
2Bhk 41.9739990234375 0 0 0
0%
2Bhk 42.018001556396484 0 0 0
0%
2Bhk 42.25699996948242 0 0 0
0%
2Bhk 45.00299835205078 0 0 0
0%
2Bhk 45.07099914550781 0 0 0
0%
2Bhk 46.68000030517578 0 0 0
0%
3 Bhk 61.26499938964844 0 0 0
0%
3 Bhk 63.391998291015625 0 0 0
0%
3 Bhk 63.891998291015625 0 0 0
0%
3 Bhk 66.73699951171875 0 0 0
0%

A-Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 51.478 1 1 0
100%
2 BHK 56.476 1 1 0
100%
3 BHK 61.265 20 20 0
100%
3 BHK 63.392 12 12 0
100%
3 BHK 63.892 20 20 0
100%
3 BHK 66.737 12 12 0
100%

B-Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 40.44 20 20 0
100%
2 BHK 41.401 7 7 0
100%
2 BHK 41.974 7 7 0
100%
2 BHK 42.018 20 20 0
100%
2 BHK 42.257 6 6 0
100%
2 BHK 45.003 6 6 0
100%
2 BHK 45.071 20 20 0
100%
2 BHK 46.68 7 7 0
100%

C- Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 40.44 20 20 0
100%
2 BHK 41.401 7 7 0
100%
2 BHK 41.974 7 7 0
100%
2 BHK 42.018 20 20 0
100%
2 BHK 42.257 6 6 0
100%
2 BHK 45.003 6 6 0
100%
2 BHK 45.071 20 20 0
100%
2 BHK 46.68 7 7 0
100%

Construction Progress

A-Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

B-Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

C- Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
CCTV Surveillance in Common Area
Children Play Area
Club House
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Gymnasium
Jogging Track
Landscape Garden
Landscaping & Tree Planting 100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Society Office
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting 100%
Swimming pool
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.