Godrej Vistas

by Godrej and Boyce Mfg. Co. Ltd. Company
Certificate Signed P51800055142
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800055142
Registration No.
REA51800153077
Registration Date
2024-03-04
Developer
Godrej and Boyce Mfg. Co. Ltd. Company
Architect
Sandeep Shikre & Associates
Project Bank
ICICI BANK LIMITED
Proposed Possession
2029-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
4
Project Area
7763.00 sq.m
Total FSI
105656.08
Approved FSI
44142.87
MahaRERA QR
Godrej Vistas
MahaRERA — P51800055142
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors38
Sanctioned38
🏠Habitable31
⬇️Basements4
🅿️Closed Parking335
📅Completion2029-12-31
🏗️Proposed Floors38
Sanctioned38
🏠Habitable31
⬇️Basements4
🅿️Closed Parking310
📅Completion2029-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2.5 Bhk 88.93000030517578 0 0 0
0%
2Bhk 01 72.5199966430664 0 0 0
0%
2Bhk 01 79.0199966430664 0 0 0
0%
2Bhk 02 74.19999694824219 0 0 0
0%
2Bhk 03 72.54000091552734 0 0 0
0%
2Bhk 04 72.23999786376953 0 0 0
0%
3 Bhk B 105.01000213623047 0 0 0
0%
3.5 Bhk 120.58000183105469 0 0 0
0%
3Bhk A 105.01000213623047 0 0 0
0%
4Bhk 168.14999389648438 0 0 0
0%
Shop 01 134.0500030517578 0 0 0
0%
Shop 02 184.80999755859375 0 0 0
0%
Shop 03 224.52999877929688 0 0 0
0%
Shop 04 117.43000030517578 0 0 0
0%
Shop 05 120.75 0 0 0
0%
Shop 06 128.38999938964844 0 0 0
0%
Shop 07 4.760000228881836 0 0 0
0%

Tower C1

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 01 79.02 53 14 39
26%
2 BHK 03 72.54 27 7 20
26%
2 BHK 04 72.24 26 10 16
38%
3 BHK A 105.01 30 9 21
30%
3.5 BHK 120.58 31 23 8
74%
4 BHK 168.15 5 1 4
20%
SHOP 01 134.05 1 0 1
0%
SHOP 02 184.81 1 0 1
0%
SHOP 03 224.53 1 0 1
0%

Tower C2

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 01 72.52 26 7 19
27%
2 BHK 02 74.2 27 5 22
19%
2 BHK 03 72.54 27 8 19
30%
2 BHK 04 72.24 26 9 17
35%
2.5 BHK 88.93 62 25 37
40%
3 BHK B 105.01 30 2 28
7%
4 BHK 168.15 5 2 3
40%
SHOP 04 117.43 1 0 1
0%
SHOP 05 120.75 1 0 1
0%
SHOP 06 128.39 1 0 1
0%
SHOP 07 4.76 1 0 1
0%

Construction Progress

TOWER C1

Basement (if any)100%

Tower C1

Excavation100%

TOWER C1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Tower C1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

TOWER C1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Tower C1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing10%

TOWER C1

Plinth100%
Podiums (if any) 0%

Tower C1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

TOWER C1

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Tower C1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

TOWER C1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Tower C1

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

TOWER C2

Basement (if any)90%

Tower C2

Excavation100%

TOWER C2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Tower C2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

TOWER C2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Tower C2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing10%

TOWER C2

Plinth90%
Podiums (if any) 0%

Tower C2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

TOWER C2

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Tower C2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

TOWER C2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Tower C2

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.