Indiabulls Savroli - 3

by Sylvanus Properties Limited Company
Certificate SignedP52000002846

Project Information

RERA Certificate No.
P52000002846
Registration No.
REA52000006157
Registration Date
2021-09-09
Developer
Sylvanus Properties Limited Company
Project Bank
HDFC BANK
Proposed Possession
2023-03-30
Revised Possession
2023-03-30
Extended Possession
2024-03-29
Units Sold
0
Buildings
20
Project Area
8652.67 sq.m
Total FSI
51904.48
Approved FSI
50854.48
MahaRERA QR
Indiabulls Savroli - 3
MahaRERA — P52000002846
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
📅Completion2022-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2022-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2022-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2022-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2022-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2022-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2022-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2022-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2022-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2022-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2022-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2022-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2022-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2022-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2022-03-31
🏗️Proposed Floors6
Sanctioned6
📅Completion2022-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2022-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2022-03-31
🏗️Proposed Floors2
Sanctioned2
📅Completion2022-03-31
🏗️Proposed Floors2
Sanctioned2
📅Completion2022-03-31

Apartment Configurations

D10

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK82.4101
0%
2 BHK84.67505
0%
3 BHK L104.43101
0%
3 BHK L107.2505
0%
3 BHK L107.21202
0%
3 BHK S101.93202
0%
3 BHK S104.4505
0%
3 BHK S104.43707
0%
3 BHK STUDY156.59101
0%
4 BHK STUDY182.83101
0%

D7

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK82.35202
0%
2 BHK84.6312012
0%
3 BHK S101.91211
50%
3 BHK S104.3712012
0%
3 BHK STUDY156.78101
0%
4 BHK STUDY182.73101
0%

D8

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK82.35202
0%
2 BHK84.6311011
0%
2 BHK84.68101
0%
3 BHK S101.91211
50%
3 BHK S104.371129
18%
3 BHK S104.4101
0%
3 BHK STUDY156.68101
0%
4 BHK STUDY182.53101
0%

D9

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK82.4101
0%
2 BHK84.67505
0%
3 BHK L104.43101
0%
3 BHK L107.2505
0%
3 BHK L107.21202
0%
3 BHK S101.93211
50%
3 BHK S104.4505
0%
3 BHK S104.43707
0%
3 BHK STUDY156.59101
0%
4 BHK STUDY182.83101
0%

E5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK S36.5820128
60%
1 BHK S37.771275
58%

E6

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK S36.58413
25%
1 BHK S38.02281315
46%

E7

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK S36.58404
0%
1 BHK S38.02281612
57%

E8

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK S36.58413
25%
1 BHK S38.0228208
71%

F5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK L50.08220
100%
1 BHK L51.251486
57%
1 BHK S36.5211
50%
1 BHK S37.9314410
29%

F6

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK L50.08202
0%
1 BHK L51.2514131
93%
1 BHK S36.5202
0%
1 BHK S37.9314113
7%

F7

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK L50.08220
100%
1 BHK L51.2514410
29%
1 BHK S36.5220
100%
1 BHK S37.9314014
0%

F8

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHKL50.08202
0%
1 BHKL51.2514014
0%
1 BHKS36.5211
50%
1 BHKS37.9314014
0%

G1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHKS73.72202
0%
2 BHKS75.9512012
0%
3 BHK STUDY144.6101
0%
3 BHKS101.01202
0%
3 BHKS103.441239
25%
4 BHK STUDY180.3101
0%

G2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHKS73.72211
50%
2 BHKS75.9514212
14%
3 BHKS101.01211
50%
3 BHKS103.4414113
7%

G3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHKS73.72211
50%
2 BHKS75.9512111
8%
3 BHK STUDY144.6101
0%
3 BHKS101.01220
100%
3 BHKS103.4412111
8%
4 BHK STUDY180.3101
0%

G4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK73.72202
0%
2 BHK75.951248
33%
3 BHK101.01211
50%
3 BHK103.441248
33%
3 BHK STUDY144.6101
0%
4 BHK STUDY180.3101
0%

G5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHKS73.72202
0%
2 BHKS75.9514212
14%
3 BHKS101.01220
100%
3 BHKS103.4414311
21%

G6

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHKS73.72202
0%
2 BHKS75.9512012
0%
3 BHK STUDY144.6101
0%
3 BHKS101.01202
0%
3 BHKS103.4412012
0%
4 BHK STUDY180.3101
0%

Villa 5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
VILLA196.69110
100%

Villa 6

TypeCarpet (sq.ft)TotalBookedAvailableStatus
VILLA196.69110
100%

Construction Progress

D10

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.33%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises42%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

D7

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.33%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises42%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

D8

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.33%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises42%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

D9

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.33%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises42%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

E5

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.38%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises49%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

E6

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.38%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises49%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks18%
Stilt Floor 0%

E7

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.38%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises49%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
Stilt Floor 0%

E8

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.38%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises57%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

F5

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.33%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises24%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

F6

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.33%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises24%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

F7

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.33%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises49%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

F8

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.33%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises37%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

G1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.38%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises43%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

G2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.38%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises43%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks6%
Stilt Floor 0%

G3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.38%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises43%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

G4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.38%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises43%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

G5

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.38%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

G6

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.38%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

Villa 5

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 0%

Villa 6

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 0%

RERA Registered Amenities

Aggregate area of recreational Open Space15%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station66%
Energy management
Fire Protection And Fire Safety Requirements15%
Kids Play Area
Landscaping & Tree Planting15%
Multipurpose Court
Open Parking15%
Senior citizens??? area
Sewerage (Chamber, Lines, Septic Tank , STP)79%
Solid Waste Management And Disposal15%
Storm Water Drains71%
Street Lighting15%
Treatment And Disposal Of Sewage And Sullage Water15%
Water Conservation, Rain water Harvesting100%
Water Supply15%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.