📞 +91 98200 30685 ✉️
RERA: A51800043517

GREEN WORLD

by AKSHAR SPACE PVT LTD Company
Certificate Signed P51700003889
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700003889
Registration No.
REA51700017496
Registration Date
2017-08-06
Developer
AKSHAR SPACE PVT LTD Company
Architect
Stellar Design Studio
Project Bank
HDFC BANK
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
11
Project Area
34817.00 sq.m
Total FSI
52225.50
Approved FSI
52225.50
MahaRERA QR
GREEN WORLD
MahaRERA — P51700003889
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors24
Sanctioned24
🅿️Closed Parking8
📅Completion1900-01-01
🏗️Proposed Floors24
Sanctioned24
🅿️Closed Parking6
📅Completion1900-01-01
🏗️Proposed Floors24
Sanctioned24
🚗Open Parking22
🅿️Closed Parking17
📅Completion2019-12-31
🏗️Proposed Floors24
Sanctioned24
🚗Open Parking22
🅿️Closed Parking17
📅Completion2019-12-31
🏗️Proposed Floors24
Sanctioned24
🚗Open Parking22
🅿️Closed Parking18
📅Completion2019-12-31
🏗️Proposed Floors24
Sanctioned24
🚗Open Parking22
🅿️Closed Parking16
📅Completion1900-01-01
🏗️Proposed Floors24
Sanctioned24
🅿️Closed Parking17
📅Completion1900-01-01
🏗️Proposed Floors24
Sanctioned24
🅿️Closed Parking16
📅Completion1900-01-01
🏗️Proposed Floors24
Sanctioned24
🚗Open Parking22
🅿️Closed Parking16
📅Completion2019-12-31
🏗️Proposed Floors23
Sanctioned23
🚗Open Parking22
🅿️Closed Parking14
📅Completion2019-12-31
🏗️Proposed Floors2
Sanctioned2
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1.5 Bhk 37.369998931884766 0 0 0
0%
1.5 Bhk 38.08000183105469 0 0 0
0%
1.5 Bhk 40.0099983215332 0 0 0
0%
2 Bhk 45.38999938964844 0 0 0
0%
2 Bhk 47.369998931884766 0 0 0
0%
2 Bhk 47.59000015258789 0 0 0
0%
2 Bhk 48.04999923706055 0 0 0
0%
2 Bhk 48.97999954223633 0 0 0
0%
2.5 Bhk 55.29999923706055 0 0 0
0%
2.5 Bhk 58.5099983215332 0 0 0
0%
2.5 Bhk 60.900001525878906 0 0 0
0%
3 Bhk 65.43000030517578 0 0 0
0%
3 Bhk 68.22000122070312 0 0 0
0%
3 Bhk 69.1500015258789 0 0 0
0%
3 Bhk 72.55000305175781 0 0 0
0%
Shop 23.43000030517578 0 0 0
0%
Shop 23.670000076293945 0 0 0
0%
Shop 57.119998931884766 0 0 0
0%
Shop 57.65999984741211 0 0 0
0%
Shop 59.70000076293945 0 0 0
0%
Shop 65.95999908447266 0 0 0
0%
Shop 66.56999969482422 0 0 0
0%
Shop 66.63999938964844 0 0 0
0%
Shop 80.29000091552734 0 0 0
0%
Shop 86.0999984741211 0 0 0
0%
Shop 87.45999908447266 0 0 0
0%
Shop 88.45999908447266 0 0 0
0%
Shop 89.61000061035156 0 0 0
0%
Shop 93.12999725341797 0 0 0
0%
Shop 97.7300033569336 0 0 0
0%
Shop 111.11000061035156 0 0 0
0%

A1 Wing

Type Carpet (sq.ft) Total Booked Available Status
1.5 BHK 40.01 22 18 4
82%
2.5 BHK 55.3 44 34 10
77%
2.5 BHK 60.9 22 15 7
68%

A2 Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 47.37 22 21 1
95%
2 BHK 47.59 22 21 1
95%
2.5 BHK 58.51 22 21 1
95%

B Wing

Type Carpet (sq.ft) Total Booked Available Status
1.5 BHK 38.08 22 16 6
73%
2 BHK 48.98 22 17 5
77%
3 BHK 65.43 22 13 9
59%

C Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 48.05 44 34 10
77%
3 BHK 68.22 22 12 10
55%
3 BHK 69.15 22 11 11
50%

E Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 48.05 44 44 0
100%
3 BHK 68.22 22 22 0
100%
3 BHK 69.15 22 21 1
95%

F Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 48.05 44 39 5
89%
3 BHK 68.22 22 20 2
91%
3 BHK 69.15 22 19 3
86%

G Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 48.05 44 40 4
91%
3 BHK 68.22 22 18 4
82%
3 BHK 69.15 22 18 4
82%

H Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 45.39 66 45 21
68%
3 BHK 72.55 22 14 8
64%

I Wing

Type Carpet (sq.ft) Total Booked Available Status
1.5 BHK 37.37 84 68 16
81%

Shops

Type Carpet (sq.ft) Total Booked Available Status
SHOP 23.43 3 1 2
33%
SHOP 23.67 6 0 6
0%
SHOP 57.12 1 1 0
100%
SHOP 57.66 1 1 0
100%
SHOP 59.7 3 3 0
100%
SHOP 65.96 30 13 17
43%
SHOP 66.57 2 0 2
0%
SHOP 66.64 2 1 1
50%
SHOP 80.29 1 0 1
0%
SHOP 86.1 1 0 1
0%
SHOP 87.46 1 0 1
0%
SHOP 88.46 1 0 1
0%
SHOP 89.61 1 1 0
100%
SHOP 93.13 1 1 0
100%
SHOP 97.73 1 0 1
0%
SHOP 111.11 1 0 1
0%

Construction Progress

A1 WING

Basement (if any)100%

A1 Wing

Excavation100%

A1 WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

A1 Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate65%

A1 WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

A1 Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%

A1 WING

Plinth100%
Podiums (if any) 0%

A1 Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises40%

A1 WING

Sanitary Fittings within the flats / premises40%
Slabs of Super Structure100%

A1 Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

A1 WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

A1 Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

A2 WING

Basement (if any)100%

A2 Wing

Excavation100%

A2 WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

A2 Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate65%

A2 WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

A2 Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%

A2 WING

Plinth100%
Podiums (if any) 0%

A2 Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises40%

A2 WING

Sanitary Fittings within the flats / premises40%
Slabs of Super Structure100%

A2 Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

A2 WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

A2 Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

B WING

Basement (if any)100%

B Wing

Excavation100%

B WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate65%

B WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%

B WING

Plinth100%
Podiums (if any) 0%

B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises40%

B WING

Sanitary Fittings within the flats / premises40%
Slabs of Super Structure100%

B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

B WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

B Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

C WING

Basement (if any)100%

C Wing

Excavation100%

C WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

C Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate65%

C WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

C Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%

C WING

Plinth100%
Podiums (if any) 0%

C Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises40%

C WING

Sanitary Fittings within the flats / premises40%
Slabs of Super Structure100%

C Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

C WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

C Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

D WING

Basement (if any)100%

D Wing

Excavation100%

D WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

D Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate65%

D WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

D Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%

D WING

Plinth100%
Podiums (if any) 0%

D Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises40%

D WING

Sanitary Fittings within the flats / premises40%
Slabs of Super Structure100%

D Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

D WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

D Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

E WING

Basement (if any)100%

E Wing

Excavation100%

E WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

E Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate65%

E WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

E Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%

E WING

Plinth100%
Podiums (if any) 0%

E Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises40%

E WING

Sanitary Fittings within the flats / premises40%
Slabs of Super Structure100%

E Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

E WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

E Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

F WING

Basement (if any)100%

F Wing

Excavation100%

F WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

F Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate65%

F WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

F Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%

F WING

Plinth100%
Podiums (if any) 0%

F Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises40%

F WING

Sanitary Fittings within the flats / premises40%
Slabs of Super Structure100%

F Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

F WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

F Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

G WING

Basement (if any)100%

G Wing

Excavation100%

G WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

G Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate65%

G WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

G Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%

G WING

Plinth100%
Podiums (if any) 0%

G Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises40%

G WING

Sanitary Fittings within the flats / premises40%
Slabs of Super Structure100%

G Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

G WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

G Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

H WING

Basement (if any)100%

H Wing

Excavation100%

H WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

H Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate65%

H WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

H Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%

H WING

Plinth100%
Podiums (if any) 0%

H Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises40%

H WING

Sanitary Fittings within the flats / premises40%
Slabs of Super Structure100%

H Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

H WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

H Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

I WING

Basement (if any)100%

I Wing

Excavation100%

I WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

I Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate65%

I WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

I Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%

I WING

Plinth100%
Podiums (if any) 0%

I Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises40%

I WING

Sanitary Fittings within the flats / premises40%
Slabs of Super Structure100%

I Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

I WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

I Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

SHOPS

Basement (if any)100%

Shops

Excavation100%

SHOPS

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%

Shops

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate70%

SHOPS

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%

Shops

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises90%

SHOPS

Plinth100%
Podiums (if any) 100%

Shops

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises70%

SHOPS

Sanitary Fittings within the flats / premises70%
Slabs of Super Structure85%

Shops

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

SHOPS

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Shops

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure85%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings 80%
Electrical Meter Room, Sub-Station, Receiving Station 80%
Energy management
Fire Protection And Fire Safety Requirements 70%
Landscaping & Tree Planting 85%
Open Parking 90%
Sewerage (Chamber, Lines, Septic Tank , STP) 75%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 80%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.