Ivy Marvel

by Neumec Reality Partnership
Certificate SignedP51800006856
šŸ’¬ WhatsAppšŸ“ž Call

Project Information

RERA Certificate No.
P51800006856
Registration No.
REA51800011681
Registration Date
2020-10-06
Developer
Neumec Reality Partnership
Architect
Mf Associates
Project Bank
HDFC BANK
Proposed Possession
2022-12-30
Revised Possession
2022-12-30
Extended Possession
2025-06-30
Units Sold
0
Buildings
2
Project Area
1164.50 sq.m
Total FSI
5287.90
Approved FSI
1206.00
MahaRERA QR
Ivy Marvel
MahaRERA — P51800006856
Scan to verify on MahaRERA portal

Wing-wise Details

šŸ—ļøProposed Floors15
āœ…Sanctioned15
ā¬‡ļøBasements1
šŸš—Open Parking3
šŸ…æļøClosed Parking16
šŸ“…Completion2024-06-30
šŸ—ļøProposed Floors15
āœ…Sanctioned15
ā¬‡ļøBasements1
šŸš—Open Parking4
šŸ…æļøClosed Parking16
šŸ“…Completion2024-06-30

Apartment Configurations

A Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK51.64110
100%
2 BHK72.35101
0%
2 BHK84.09110
100%
2 BHK108.32101
0%
3 BHK76.62110
100%
3 BHK79.31110
100%
3 BHK79.88110
100%
3 BHK104.58642
67%
3 BHK108.77716
14%
Commercial23.74110
100%
Commercial65.72101
0%
Commercial70.51110
100%
Commercial141.61101
0%
Commercial161.89101
0%
Studio19.42101
0%
Studio20.01101
0%
Studio23.78110
100%

B Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK41.17514
20%
1 BHK46.99523
40%
1 BHK48.4532
60%
1 BHK49.16532
60%

Construction Progress

A WIng

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises65%
Slabs of Super Structure86%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

A Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises65%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure86%

B WIng

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises65%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

B Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises65%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

āœ…Aggregate area of recreational Open Space
⬜Community Buildings
āœ…Electrical Meter Room, Sub-Station, Receiving Station90%
⬜Energy management
āœ…Fire Protection And Fire Safety Requirements90%
āœ…Landscaping & Tree Planting
āœ…Open Parking
āœ…Sewerage (Chamber, Lines, Septic Tank , STP)90%
āœ…Solid Waste Management And Disposal90%
āœ…Storm Water Drains90%
āœ…Street Lighting
āœ…Treatment And Disposal Of Sewage And Sullage Water90%
āœ…Water Conservation, Rain water Harvesting90%
āœ…Water Supply90%
CallWhatsApp
āœ‰ļø

Get in Touch

Our team will connect with you shortly

+91
šŸ”’ Your details are secure with us
⚔ If need urgent details +91 98200 67525 for further details.