Redevelopment of Jai Vijay CHSL - Phase I

by KOLTE-PATIL DEVELOPERS LIMITED Company
Certificate Signed P51800004446
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800004446
Registration No.
REA51800008712
Registration Date
2021-03-02
Developer
KOLTE-PATIL DEVELOPERS LIMITED Company
Architect
Spaceage Consultants As Licensed Surveyor
Project Bank
AXIS BANK
Proposed Possession
2019-09-30
Revised Possession
2019-09-30
Extended Possession
2022-09-29
Units Sold
0
Buildings
12
Project Area
8979.20 sq.m
Total FSI
22400.26
Approved FSI
22400.26
MahaRERA QR
Redevelopment of Jai Vijay CHSL - Phase I
MahaRERA — P51800004446
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors11
Sanctioned11
⬇️Basements2
🚗Open Parking7
🅿️Closed Parking75
📅Completion2019-09-30
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking31
📅Completion2019-09-30
🏗️Proposed Floors11
Sanctioned11
⬇️Basements2
🚗Open Parking7
🅿️Closed Parking75
📅Completion2019-09-30
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking31
📅Completion2019-09-30
🏗️Proposed Floors11
Sanctioned11
⬇️Basements2
🅿️Closed Parking65
📅Completion2019-09-30
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking25
📅Completion2019-09-30
🏗️Proposed Floors11
Sanctioned11
⬇️Basements2
🅿️Closed Parking71
📅Completion2019-09-30
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking26
📅Completion2019-09-30
🏗️Proposed Floors12
Sanctioned12
⬇️Basements2
🅿️Closed Parking73
📅Completion2019-09-30
🏗️Proposed Floors2
Sanctioned2
🅿️Closed Parking17
📅Completion2019-09-30
🏗️Proposed Floors12
Sanctioned12
⬇️Basements2
🅿️Closed Parking79
📅Completion2019-09-30
🏗️Proposed Floors2
Sanctioned2
🅿️Closed Parking18
📅Completion2019-09-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bdlk 42.349998474121094 0 0 0
0%
1 Bdlk 1 Study Rm 62.34000015258789 0 0 0
0%
1 Bdlk 1 Study Rm 66.08999633789062 0 0 0
0%
1 Bdlk 1 Study Room 62.34000015258789 0 0 0
0%
2 Bdlk 65.41999816894531 0 0 0
0%
2 Bdlk 66.08999633789062 0 0 0
0%
2 Bdlk 69.27999877929688 0 0 0
0%
2 Bdlk 70.20999908447266 0 0 0
0%
2 Bdlk 72.04000091552734 0 0 0
0%
3 Bdlk 86.37999725341797 0 0 0
0%
3 Bdlk 97.62000274658203 0 0 0
0%
3 Bdlk 98.1500015258789 0 0 0
0%
4 Bdlk 112.41000366210938 0 0 0
0%
4 Bdlk 113.19000244140625 0 0 0
0%
Store 17.90999984741211 0 0 0
0%
Store 18.1299991607666 0 0 0
0%

Wing A Floor 1 To 8

Type Carpet (sq.ft) Total Booked Available Status
1 BDLK 1 STUDY RM 62.34 8 0 8
0%
2 BDLK 72.04 7 2 5
29%
3 BDLK 97.62 16 16 0
100%
STORE 17.91 1 0 1
0%

Wing A Proposed Floor 9 To 11

Type Carpet (sq.ft) Total Booked Available Status
1 BDLK 1 STUDY RM 62.34 3 0 3
0%
2 BDLK 72.04 3 0 3
0%
3 BDLK 97.62 6 6 0
100%

Wing B Floor 1 To 8

Type Carpet (sq.ft) Total Booked Available Status
1 BDLK 1 STUDY RM 62.34 8 2 6
25%
2 BDLK 72.04 7 6 1
86%
3 BDLK 97.62 16 14 2
88%
STORE 18.13 1 0 1
0%

Wing B Proposed Floor 9 To 11

Type Carpet (sq.ft) Total Booked Available Status
1 BDLK 1 STUDY ROOM 62.34 3 3 0
100%
2 BDLK 72.04 3 3 0
100%
3 BDLK 97.62 6 3 3
50%

Wing C Floor 1 To 8

Type Carpet (sq.ft) Total Booked Available Status
1 BDLK 42.35 7 0 7
0%
1 BDLK 1 STUDY RM 66.09 8 6 2
75%
3 BDLK 86.38 8 6 2
75%
3 BDLK 98.15 8 8 0
100%

Wing C Proposed Floor 9 To 11

Type Carpet (sq.ft) Total Booked Available Status
1 BDLK 42.35 3 0 3
0%
1 BDLK 1 STUDY RM 66.09 3 3 0
100%
3 BDLK 86.38 3 3 0
100%
3 BDLK 98.15 3 3 0
100%

Wing D Floor 1 To 8

Type Carpet (sq.ft) Total Booked Available Status
2 BDLK 65.42 7 3 4
43%
2 BDLK 69.28 8 6 2
75%
3 BDLK 97.62 15 15 0
100%
4 BDLK 113.19 1 1 0
100%

Wing D Proposed Floor 9 To 11

Type Carpet (sq.ft) Total Booked Available Status
2 BDLK 65.42 3 2 1
67%
2 BDLK 69.28 3 3 0
100%
3 BDLK 97.62 6 6 0
100%

Wing E Floor 1 To 9

Type Carpet (sq.ft) Total Booked Available Status
1 BDLK 42.35 8 8 0
100%
2 BDLK 70.21 9 0 9
0%
3 BDLK 97.62 18 18 0
100%

Wing E Proposed Floor 10 To 11

Type Carpet (sq.ft) Total Booked Available Status
1 BDLK 42.35 2 2 0
100%
2 BDLK 70.21 2 0 2
0%
3 BDLK 97.62 4 4 0
100%

Wing F Floor 1 To 9

Type Carpet (sq.ft) Total Booked Available Status
2 BDLK 66.09 8 8 0
100%
2 BDLK 70.21 9 9 0
100%
3 BDLK 97.62 17 17 0
100%
4 BDLK 112.41 1 1 0
100%

Wing F Proposed Floor 10 To 11

Type Carpet (sq.ft) Total Booked Available Status
2 BDLK 66.09 2 2 0
100%
2 BDLK 70.21 2 2 0
100%
3 BDLK 97.62 4 4 0
100%

Construction Progress

WING A FLOOR 1 TO 8

Basement (if any)100%

Wing A Floor 1 To 8

Excavation100%

WING A FLOOR 1 TO 8

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing A Floor 1 To 8

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING A FLOOR 1 TO 8

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing A Floor 1 To 8

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING A FLOOR 1 TO 8

Plinth100%
Podiums (if any) 0%

Wing A Floor 1 To 8

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING A FLOOR 1 TO 8

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing A Floor 1 To 8

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING A FLOOR 1 TO 8

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing A Floor 1 To 8

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING A PROPOSED FLOOR 9 TO 11

Basement (if any)0%

Wing A Proposed Floor 9 To 11

Excavation0%

WING A PROPOSED FLOOR 9 TO 11

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing A Proposed Floor 9 To 11

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING A PROPOSED FLOOR 9 TO 11

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing A Proposed Floor 9 To 11

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing60%

WING A PROPOSED FLOOR 9 TO 11

Plinth0%
Podiums (if any) 0%

Wing A Proposed Floor 9 To 11

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING A PROPOSED FLOOR 9 TO 11

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing A Proposed Floor 9 To 11

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING A PROPOSED FLOOR 9 TO 11

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing A Proposed Floor 9 To 11

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING B FLOOR 1 TO 8

Basement (if any)100%

Wing B Floor 1 To 8

Excavation100%

WING B FLOOR 1 TO 8

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing B Floor 1 To 8

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING B FLOOR 1 TO 8

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing B Floor 1 To 8

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING B FLOOR 1 TO 8

Plinth100%
Podiums (if any) 0%

Wing B Floor 1 To 8

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING B FLOOR 1 TO 8

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing B Floor 1 To 8

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING B FLOOR 1 TO 8

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing B Floor 1 To 8

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING B PROPOSED FLOOR 9 TO 11

Basement (if any)0%

Wing B Proposed Floor 9 To 11

Excavation0%

WING B PROPOSED FLOOR 9 TO 11

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing B Proposed Floor 9 To 11

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING B PROPOSED FLOOR 9 TO 11

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing B Proposed Floor 9 To 11

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing60%

WING B PROPOSED FLOOR 9 TO 11

Plinth0%
Podiums (if any) 0%

Wing B Proposed Floor 9 To 11

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING B PROPOSED FLOOR 9 TO 11

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing B Proposed Floor 9 To 11

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING B PROPOSED FLOOR 9 TO 11

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing B Proposed Floor 9 To 11

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING C FLOOR 1 TO 8

Basement (if any)100%

Wing C Floor 1 To 8

Excavation100%

WING C FLOOR 1 TO 8

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing C Floor 1 To 8

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING C FLOOR 1 TO 8

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing C Floor 1 To 8

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING C FLOOR 1 TO 8

Plinth100%
Podiums (if any) 0%

Wing C Floor 1 To 8

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING C FLOOR 1 TO 8

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing C Floor 1 To 8

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING C FLOOR 1 TO 8

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing C Floor 1 To 8

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING C PROPOSED FLOOR 9 TO 11

Basement (if any)0%

Wing C Proposed Floor 9 To 11

Excavation0%

WING C PROPOSED FLOOR 9 TO 11

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing C Proposed Floor 9 To 11

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING C PROPOSED FLOOR 9 TO 11

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing C Proposed Floor 9 To 11

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing60%

WING C PROPOSED FLOOR 9 TO 11

Plinth0%
Podiums (if any) 0%

Wing C Proposed Floor 9 To 11

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING C PROPOSED FLOOR 9 TO 11

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing C Proposed Floor 9 To 11

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING C PROPOSED FLOOR 9 TO 11

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing C Proposed Floor 9 To 11

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING D FLOOR 1 TO 8

Basement (if any)100%

Wing D Floor 1 To 8

Excavation100%

WING D FLOOR 1 TO 8

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing D Floor 1 To 8

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING D FLOOR 1 TO 8

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing D Floor 1 To 8

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING D FLOOR 1 TO 8

Plinth100%
Podiums (if any) 0%

Wing D Floor 1 To 8

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING D FLOOR 1 TO 8

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing D Floor 1 To 8

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING D FLOOR 1 TO 8

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing D Floor 1 To 8

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING D PROPOSED FLOOR 9 TO 11

Basement (if any)0%

Wing D Proposed Floor 9 To 11

Excavation0%

WING D PROPOSED FLOOR 9 TO 11

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing D Proposed Floor 9 To 11

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING D PROPOSED FLOOR 9 TO 11

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing D Proposed Floor 9 To 11

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing60%

WING D PROPOSED FLOOR 9 TO 11

Plinth0%
Podiums (if any) 0%

Wing D Proposed Floor 9 To 11

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING D PROPOSED FLOOR 9 TO 11

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing D Proposed Floor 9 To 11

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING D PROPOSED FLOOR 9 TO 11

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing D Proposed Floor 9 To 11

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING E FLOOR 1 TO 9

Basement (if any)100%

Wing E Floor 1 To 9

Excavation100%

WING E FLOOR 1 TO 9

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing E Floor 1 To 9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING E FLOOR 1 TO 9

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing E Floor 1 To 9

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING E FLOOR 1 TO 9

Plinth100%
Podiums (if any) 0%

Wing E Floor 1 To 9

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING E FLOOR 1 TO 9

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing E Floor 1 To 9

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING E FLOOR 1 TO 9

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing E Floor 1 To 9

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING E PROPOSED FLOOR 10 TO 11

Basement (if any)0%

Wing E Proposed Floor 10 To 11

Excavation0%

WING E PROPOSED FLOOR 10 TO 11

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing E Proposed Floor 10 To 11

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING E PROPOSED FLOOR 10 TO 11

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing E Proposed Floor 10 To 11

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing60%

WING E PROPOSED FLOOR 10 TO 11

Plinth0%
Podiums (if any) 0%

Wing E Proposed Floor 10 To 11

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING E PROPOSED FLOOR 10 TO 11

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing E Proposed Floor 10 To 11

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING E PROPOSED FLOOR 10 TO 11

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing E Proposed Floor 10 To 11

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING F FLOOR 1 TO 9

Basement (if any)100%

Wing F Floor 1 To 9

Excavation100%

WING F FLOOR 1 TO 9

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing F Floor 1 To 9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING F FLOOR 1 TO 9

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing F Floor 1 To 9

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING F FLOOR 1 TO 9

Plinth100%
Podiums (if any) 0%

Wing F Floor 1 To 9

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING F FLOOR 1 TO 9

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing F Floor 1 To 9

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING F FLOOR 1 TO 9

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing F Floor 1 To 9

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING F PROPOSED FLOOR 10 TO 11

Basement (if any)0%

Wing F Proposed Floor 10 To 11

Excavation0%

WING F PROPOSED FLOOR 10 TO 11

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing F Proposed Floor 10 To 11

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING F PROPOSED FLOOR 10 TO 11

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing F Proposed Floor 10 To 11

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing60%

WING F PROPOSED FLOOR 10 TO 11

Plinth0%
Podiums (if any) 0%

Wing F Proposed Floor 10 To 11

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING F PROPOSED FLOOR 10 TO 11

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing F Proposed Floor 10 To 11

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING F PROPOSED FLOOR 10 TO 11

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing F Proposed Floor 10 To 11

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 90%
Community Buildings 95%
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.