01
Possession Timeline
Proposed
Feb 2025
Status
New Project
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
1 BHK477–525 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P51700030018
Registered
—
Litigation
No reported in source
Escrow Bank
AXIS BANK
Architect
—
Total FSI
975
04
Buildings · 1 Wing(s)
Kisan Vihar - A Wing— floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Maharashtra Nagar
▸ Explore map & Street View — for verified buyers
09
Construction Progress
84% avgExcavation100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Slabs of Super Structure100%
Overall Percentage of Completion of the work done For the entire Building /Wing84%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate60%
X number of Podiums0%
10
Amenities
Electrical Meter Room, Sub-Station, Receiving StationFire Protection And Fire Safety RequirementsSewerage (Chamber, Lines, Septic Tank , STP)Storm Water DrainsWater Conservation, Rain water HarvestingWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory15
MahaRERA projects nearby in Maharashtra Nagar
?
Frequently Asked Questions
When is possession of Kisan Vihar?
As per MahaRERA, proposed possession is Feb 2025.
Is Kisan Vihar RERA-registered?
Yes — MahaRERA registration P51700030018. The current MahaRERA source record reports no litigations.
Who is the developer?
Vinod Builder
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.