Laxminarayan Sra Chs Ltd

by Shree S S Developers Private Limited Company
Certificate SignedP51800018454
Want us to WhatsApp you? Enter your mobile — we’ll say hello and take it from there.
+91

Project Information

RERA Certificate No.
P51800018454
Registration No.
REA51800041869
Registration Date
2021-09-09
Developer
Shree S S Developers Private Limited Company
Architect
Design crest Axiom
Project Bank
HDFC BANK
Proposed Possession
2026-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
474
Units Sold
226 (48%)
Buildings
5
Project Area
5323.65 sq.m
Total FSI
14934.90
Approved FSI
11948.55
MahaRERA QR
Laxminarayan Sra Chs Ltd
MahaRERA โ€” P51800018454
Scan to verify on MahaRERA portal

Wing-wise Details

๐Ÿ—๏ธProposed Floors27
โœ…Sanctioned27
๐Ÿ Habitable22
๐Ÿ”ขTotal Units83
๐ŸกResidential79
๐ŸขNon-Residential4
๐Ÿ—๏ธProposed Floors27
โœ…Sanctioned27
๐Ÿ Habitable22
๐Ÿ”ขTotal Units158
๐ŸกResidential144
๐ŸขNon-Residential14
๐Ÿ—๏ธProposed Floors24
โœ…Sanctioned24
๐Ÿ—๏ธProposed Floors27
โœ…Sanctioned27
๐Ÿ Habitable22
๐Ÿ”ขTotal Units104
๐ŸกResidential100
๐ŸขNon-Residential4
๐Ÿ—๏ธProposed Floors27
โœ…Sanctioned27
๐Ÿ Habitable22
๐Ÿ”ขTotal Units129
๐ŸกResidential119
๐ŸขNon-Residential10

Apartment Configurations

Aster

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK33.45792257
28%

Begonia

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK35.339237
5%
1BHK39.21019
10%
1BHK41.81981
89%
1RK22.85303
0%
2BHK48.0320155
75%
2BHK54.16330
100%

Comp Building no 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK32.523023
0%

Daffodils

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK30.1922139
59%
1BHK33.4520218
10%
1BHK33.919019
0%
1RK19.520137
65%
1RK20.9221111
50%

Laxmi narayan SRA CHS Ltd

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK33.4511110
100%

Construction Progress

Aster

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor100%

Begonia

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor100%

Comp Building no 2

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

Daffodils

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

Laxmi narayan SRA CHS Ltd

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

โœ…Aggregate area of recreational Open Space
โฌœCommunity Buildings
โœ…Electrical meter room, sub-station, receiving station90%
โฌœEnergy managemcnt
โœ…Fire protection and fire safety requirements50%
โฌœInternal Roads & Footpaths
โœ…Landscaping & Tree Planting
โฌœOpen Parking
โœ…Sewerage (Chamber, Lines, Septic Tank , STP)50%
โฌœSolid Waste Management And Disposal
โœ…Storm Water Drains50%
โœ…Street Lighting
โฌœTreatment And Disposal Of Sewage And Sullage Water
โœ…Water Supply50%
โœ…Water conservation /Rain water harvesting50%