Project Information

RERA Certificate No.
P51900034949
Registration No.
REA51900106286
Registration Date
2025-10-06
Developer
Lodha Developers Limited Company
Architect
Vilas Desai & Associate
Project Bank
HDFC BANK
Proposed Possession
2026-06-30
Revised Possession
1900-01-01
Extended Possession
2027-06-29
Total Units
29
Units Sold
24 (83%)
Buildings
2
Project Area
4390.96 sq.m
Total FSI
19295.51
Approved FSI
17541.51
MahaRERA QR
Lodha Malabar
MahaRERA — P51900034949
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors36
Sanctioned36
🏠Habitable23
🔢Total Units21
🏡Residential21
🅿️Closed Parking98
📅Completion2026-06-30
🏗️Proposed Floors33
Sanctioned33
🏠Habitable23
🔢Total Units8
🏡Residential8
🅿️Closed Parking57
📅Completion2026-06-30

Apartment Configurations

Wing A

Type Carpet (sq.ft) Total Booked Available Status
4 BHK 376.63 7 7 0
100%
5 BHK & more 742.75 3 3 0
100%
5 BHK & more 754.27 7 3 4
43%
5 BHK & more 1172.8 1 1 0
100%
5 BHK & more 1693.61 1 1 0
100%
5 BHK and More 712.38 1 1 0
100%
5 BHK and More 736.07 1 1 0
100%

Wing B

Type Carpet (sq.ft) Total Booked Available Status
4 BHK 335.1 1 1 0
100%
4 BHK 354.98 2 0 2
0%
4 BHK 357.02 5 0 5
0%

Construction Progress

Wing A

Basement (if any)91%
Excavation95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate77%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing29%
Plinth91%
Podiums (if any) 78%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises5%
Slabs of Super Structure86%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth93%
X number of Podiums26%
X number of Slabs of Super Structure6%

Wing B

Basement (if any)91%
Excavation95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth91%
Podiums (if any) 78%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises5%
Slabs of Super Structure86%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth93%
X number of Podiums26%
X number of Slabs of Super Structure6%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.