šŸ“ž +91 98200 30685āœ‰ļø
RERA: A51800043517

Mangeshi Tulip

by Mangesh Dashrath Gaikar
Kept in AbeyanceP51700047949
šŸ’¬ WhatsAppšŸ“ž Call

Project Information

RERA Certificate No.
P51700047949
Registration No.
REA51700118364
Developer
Mangesh Dashrath Gaikar
Architect
Vitan Consultant
Project Bank
DCB Bank Ltd
Proposed Possession
2026-07-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Buildings
3
Project Area
3532.75 sq.m
Total FSI
14919.72
MahaRERA QR
Mangeshi Tulip
MahaRERA — P51700047949
Scan to verify on MahaRERA portal

Wing-wise Details

šŸš—Open Parking37
šŸ“…Completion2026-07-30
šŸ“…Completion2026-07-30
šŸ“…Completion2026-07-30

Apartment Configurations

A1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK47.53601347
22%
Shop8.16211
50%
Shop10.86202
0%
Shop13.35211
50%
Shop13.8220
100%

A2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK48.3651
83%

A3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK37.1312
33%
1 BHK39.55381919
50%
2 BHK8.09110
100%
2 BHK48.4520713
35%
2 BHK48.520812
40%
2 BHK48.917107
59%
Shop5.99110
100%
Shop8.62101
0%
Shop8.84110
100%
Shop10.73110
100%
Shop12.33220
100%
Shop13.42101
0%
Shop14.49211
50%
Shop14.99110
100%
Shop16.01110
100%

Construction Progress

A1

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

A2

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

A3

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
āœ…Electrical Meter Room, Sub-Station, Receiving Station
āœ…Energy management
āœ…Fire Protection And Fire Safety Requirements
āœ…Landscaping & Tree Planting
āœ…Open Parking
āœ…Sewerage (Chamber, Lines, Septic Tank , STP)
⬜Solid Waste Management And Disposal
āœ…Storm Water Drains
āœ…Street Lighting
āœ…Treatment And Disposal Of Sewage And Sullage Water
āœ…Water Conservation, Rain water Harvesting
āœ…Water Supply
CallWhatsApp
āœ‰ļø

Get in Touch

Our team will connect with you shortly

+91
šŸ”’ Your details are secure with us
⚔ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
šŸ‘‹ Looking for the right project? Let me help you find it!
šŸ—ļø
MPE Project Advisor
ā— Online now