RERA: A51800043517

Mangeshi Tulip

by Mangesh Dashrath Gaikar
Kept in AbeyanceP51700047949

Project Information

RERA Certificate No.
P51700047949
Registration No.
REA51700118364
Developer
Mangesh Dashrath Gaikar
Architect
Vitan Consultant
Project Bank
DCB Bank Ltd
Proposed Possession
2026-07-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Buildings
3
Project Area
3532.75 sq.m
Total FSI
14919.72
MahaRERA QR
Mangeshi Tulip
MahaRERA — P51700047949
Scan to verify on MahaRERA portal

Wing-wise Details

🚗Open Parking37
📅Completion2026-07-30
📅Completion2026-07-30
📅Completion2026-07-30

Apartment Configurations

A1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK47.53601347
22%
Shop8.16211
50%
Shop10.86202
0%
Shop13.35211
50%
Shop13.8220
100%

A2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK48.3651
83%

A3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK37.1312
33%
1 BHK39.55381919
50%
2 BHK8.09110
100%
2 BHK48.4520713
35%
2 BHK48.520812
40%
2 BHK48.917107
59%
Shop5.99110
100%
Shop8.62101
0%
Shop8.84110
100%
Shop10.73110
100%
Shop12.33220
100%
Shop13.42101
0%
Shop14.49211
50%
Shop14.99110
100%
Shop16.01110
100%

Construction Progress

A1

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

A2

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

A3

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.