Project Information

RERA Certificate No.
P51800001199
Registration No.
REA51800005414
Registration Date
2024-05-31
Developer
MAULI SAI DEVELOPERS PVT LTD Company
Architect
Rasik Hingoo
Project Bank
HDFC BANK
Proposed Possession
2023-01-08
Revised Possession
2023-01-08
Extended Possession
2024-07-08
Units Sold
0
Buildings
3
Project Area
8807.19 sq.m
Total FSI
102639.18
Approved FSI
26280.18
MahaRERA QR
MAULI PRIDE
MahaRERA — P51800001199
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors24
Sanctioned24
🅿️Closed Parking66
📅Completion2023-08-01
🏗️Proposed Floors26
Sanctioned26
⬇️Basements1
🅿️Closed Parking78
📅Completion2023-08-01
🏗️Proposed Floors24
Sanctioned24
🅿️Closed Parking15
📅Completion2023-08-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
0 0 0 0
0%
1Bhk 33.029998779296875 0 0 0
0%
1Bhk 33.15999984741211 0 0 0
0%
1Bhk 35.099998474121094 0 0 0
0%
1Bhk 38.29999923706055 0 0 0
0%
1Bhk 39.0 0 0 0
0%
1Bhk 41.79999923706055 0 0 0
0%
1Rk 29.5 0 0 0
0%
1Rk 29.579999923706055 0 0 0
0%
1Rk 30.290000915527344 0 0 0
0%
2A 1Bhk 35.29999923706055 0 0 0
0%
2A 1Bhk 36.41999816894531 0 0 0
0%
2A 2Bhk 57.880001068115234 0 0 0
0%
2B 1Bhk 35.29999923706055 0 0 0
0%
2B 1Bhk 36.41999816894531 0 0 0
0%
2Bhk 47.630001068115234 0 0 0
0%
2C 1Bhk 35.29999923706055 0 0 0
0%
2C 1Bhk 36.41999816894531 0 0 0
0%
2C 2Bhk 57.880001068115234 0 0 0
0%
Shop 11.170000076293945 0 0 0
0%
Shop 11.890000343322754 0 0 0
0%
Shop 15.779999732971191 0 0 0
0%
Shop 16.850000381469727 0 0 0
0%
Shop 18.209999084472656 0 0 0
0%
Shop 20.59000015258789 0 0 0
0%

Pride Building No 1Abcde

Type Carpet (sq.ft) Total Booked Available Status
1A 1BHK 27.88 120 120 0
100%
1A 1BHK 33.14 19 19 0
100%
1A 1BHK 33.25 4 4 0
100%

Pride Building No 2Abc

Type Carpet (sq.ft) Total Booked Available Status
2A 1BHK 35.3 22 22 0
100%
2A 1BHK 36.42 44 42 2
95%
2A 2BHK 57.88 23 23 0
100%
2B 1BHK 35.3 46 44 2
96%
2B 1BHK 36.42 40 33 7
82%
2C 1BHK 35.3 24 6 18
25%
2C 1BHK 36.42 42 3 39
7%
2C 2BHK 57.88 23 5 18
22%

Pride Building No 3

Type Carpet (sq.ft) Total Booked Available Status
BLDG 3 COMMERCIAL 10.65 1 0 1
0%
BLDG 3 COMMERCIAL 21.24 1 0 1
0%
BLDG 3 COMMERCIAL 28.06 1 0 1
0%
BLDG 3 COMMERCIAL 31.92 1 0 1
0%
BLDG 3 COMMERCIAL 34.53 1 0 1
0%
BLDG 3 COMMERCIAL 37.28 1 0 1
0%
BLDG 3 COMMERCIAL 51.98 1 0 1
0%
BLDG NO 3 1BHK 25.02 228 228 0
100%

Construction Progress

PRIDE BUILDING NO 1A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

Pride Building No 1Abcde

Excavation20%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate20%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises20%
Overall Percentage of Completion of the work done For the entire Building /Wing28%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises20%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing20%
X number of Basement(s) and Plinth20%
X number of Podiums20%
X number of Slabs of Super Structure20%

PRIDE BUILDING NO 2ABC

Basement (if any)100%

Pride Building No 2Abc

Excavation100%

PRIDE BUILDING NO 2ABC

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Pride Building No 2Abc

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

PRIDE BUILDING NO 2ABC

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Pride Building No 2Abc

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing40%

PRIDE BUILDING NO 2ABC

Plinth100%
Podiums (if any) 100%

Pride Building No 2Abc

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

PRIDE BUILDING NO 2ABC

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Pride Building No 2Abc

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

PRIDE BUILDING NO 2ABC

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Pride Building No 2Abc

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure0%

PRIDE BUILDING NO 3

Basement (if any)100%

Pride Building No 3

Excavation100%

PRIDE BUILDING NO 3

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Pride Building No 3

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

PRIDE BUILDING NO 3

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Pride Building No 3

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

PRIDE BUILDING NO 3

Plinth100%
Podiums (if any) 100%

Pride Building No 3

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

PRIDE BUILDING NO 3

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Pride Building No 3

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

PRIDE BUILDING NO 3

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Pride Building No 3

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 2%
Energy management
Fire Protection And Fire Safety Requirements 5%
Landscaping & Tree Planting 50%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 80%
Solid Waste Management And Disposal 20%
Storm Water Drains 70%
Street Lighting 60%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 10%
Water Supply 80%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.