Project Information

RERA Certificate No.
P51800047575
Registration No.
REA51800121399
Registration Date
2022-11-09
Developer
Incline Realty Private Limited Company
Architect
Siddhesh
Project Bank
KOTAK MAHINDRA BANK LIMITED
Proposed Possession
2027-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
462
Units Sold
326 (71%)
Buildings
1
Project Area
1233.41 sq.m
Total FSI
65000.50
Approved FSI
42562.31
MahaRERA QR
Sky City Tower G
MahaRERA — P51800047575
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors76
Sanctioned76
🏠Habitable61
🔢Total Units462
🏡Residential462
⬇️Basements2
🅿️Closed Parking788
📅Completion2027-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
3 Bhk Elite Plus Z1 122.68000030517578 0 0 0
0%
3 Bhk Elite Plus Z2 123.33999633789062 0 0 0
0%
3 Bhk Elite Plus Z3 124.0 0 0 0
0%
3 Bhk Elite Z1 118.73999786376953 0 0 0
0%
3 Bhk Elite Z2 119.19000244140625 0 0 0
0%
3 Bhk Elite Z3 119.6500015258789 0 0 0
0%
3 Bhk Palatial A Z1 171.0800018310547 0 0 0
0%
3 Bhk Palatial A Z2 171.6199951171875 0 0 0
0%
3 Bhk Palatial A Z3 172.4199981689453 0 0 0
0%
3 Bhk Palatial B Z1 171.17999267578125 0 0 0
0%
3 Bhk Palatial B Z2 171.6999969482422 0 0 0
0%
3 Bhk Palatial B Z3 172.33999633789062 0 0 0
0%
Palatial Studio Z1 36.31999969482422 0 0 0
0%
Palatial Studio Z2 36.31999969482422 0 0 0
0%
Palatial Studio Z3 36.31999969482422 0 0 0
0%

Sky City Tower G

Type Carpet (sq.ft) Total Booked Available Status
3 BHK Elite Plus Z1 122.68 50 42 8
84%
3 BHK Elite Plus Z2 123.34 26 19 7
73%
3 BHK Elite Plus Z3 124.0 26 0 26
0%
3 BHK Elite Z1 118.74 58 54 4
93%
3 BHK Elite Z2 119.19 30 30 0
100%
3 BHK Elite Z3 119.65 32 0 32
0%
3 BHK Palatial A Z1 171.08 29 27 2
93%
3 BHK Palatial A Z2 171.62 15 15 0
100%
3 BHK Palatial A Z3 172.42 16 0 16
0%
3 BHK Palatial B Z1 171.18 29 27 2
93%
3 BHK Palatial B Z2 171.7 15 15 0
100%
3 BHK Palatial B Z3 172.34 16 0 16
0%
Palatial Studio Z1 36.32 58 54 4
93%
Palatial Studio Z2 36.32 30 30 0
100%
Palatial Studio Z3 36.32 32 0 32
0%

Construction Progress

Sky City Tower G

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.26%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises19%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure76%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks39%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing15%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure38%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.