📞 +91 98200 30685 ✉️
RERA: A51800043517

PALAVA FONTANA C - H

by Palava Dwellers Private Limited Company
Certificate Signed P51700000596
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700000596
Registration No.
REA51700004475
Registration Date
2020-06-10
Developer
Palava Dwellers Private Limited Company
Architect
Vilas Desai & Associates
Proposed Possession
2020-12-30
Revised Possession
2020-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
6
Project Area
4900.00 sq.m
Total FSI
29365.00
Approved FSI
27967.00
MahaRERA QR
PALAVA FONTANA C - H
MahaRERA — P51700000596
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors18
Sanctioned18
🚗Open Parking16
🅿️Closed Parking90
📅Completion2020-06-30
🏗️Proposed Floors18
Sanctioned18
🚗Open Parking16
🅿️Closed Parking54
📅Completion2020-06-30
🏗️Proposed Floors18
Sanctioned18
🚗Open Parking16
🅿️Closed Parking90
📅Completion2020-06-30
🏗️Proposed Floors18
Sanctioned18
🚗Open Parking16
🅿️Closed Parking90
📅Completion2020-06-30
🏗️Proposed Floors18
Sanctioned18
🚗Open Parking16
🅿️Closed Parking54
📅Completion2020-06-30
🏗️Proposed Floors18
Sanctioned18
🚗Open Parking16
🅿️Closed Parking90
📅Completion2020-06-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Half Bhk 51.560001373291016 0 0 0
0%
1 Half Bhk 51.599998474121094 0 0 0
0%
1 Half Bhk 52.38999938964844 0 0 0
0%
1 Half Bhk 55.09000015258789 0 0 0
0%
1Bhk 34.84000015258789 0 0 0
0%
1Bhk 34.869998931884766 0 0 0
0%
1Bhk 35.36000061035156 0 0 0
0%
1Bhk 38.66999816894531 0 0 0
0%
1Bhk 39.7599983215332 0 0 0
0%
1Bhk 39.790000915527344 0 0 0
0%
1Bhk 40.09000015258789 0 0 0
0%
1Bhk 41.25 0 0 0
0%
1Bhk 41.709999084472656 0 0 0
0%
1Bhk 41.7400016784668 0 0 0
0%
1Bhk 42.459999084472656 0 0 0
0%
1Bhk 42.5099983215332 0 0 0
0%
1Bhk 43.119998931884766 0 0 0
0%
1Bhk 43.689998626708984 0 0 0
0%
1Bhk 43.7400016784668 0 0 0
0%
1Bhk 43.7599983215332 0 0 0
0%
1Bhk 44.38999938964844 0 0 0
0%
1Bhk 44.619998931884766 0 0 0
0%
1Bhk 44.95000076293945 0 0 0
0%
1Bhk 44.970001220703125 0 0 0
0%
1Bhk 44.9900016784668 0 0 0
0%
1Bhk 45.560001373291016 0 0 0
0%
1Bhk 45.66999816894531 0 0 0
0%
1Bhk 46.880001068115234 0 0 0
0%
1Bhk 46.91999816894531 0 0 0
0%
1Bhk 49.5 0 0 0
0%
1Bhk 50.84000015258789 0 0 0
0%
1Bhk 50.91999816894531 0 0 0
0%
1Bhk 52.400001525878906 0 0 0
0%
2 Half Bhk 82.47000122070312 0 0 0
0%

Fontana C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 35.36 2 2 0
100%
1 BHK 38.67 11 0 11
0%
1 BHK 39.76 25 25 0
100%
1 BHK 39.79 26 26 0
100%
1 BHK 40.09 1 0 1
0%
1 BHK 41.25 1 1 0
100%
1 BHK 41.71 1 1 0
100%
1 BHK 41.74 1 1 0
100%
1 BHK 43.12 1 0 1
0%
1 BHK 43.69 11 0 11
0%
1 BHK 43.76 1 1 0
100%
1 BHK 44.39 1 0 1
0%
1 BHK 44.95 5 5 0
100%
1 BHK 44.99 1 0 1
0%
1 BHK 45.56 14 0 14
0%
1 BHK 46.88 2 2 0
100%
1 BHK 49.5 1 0 1
0%
1 BHK 50.84 1 0 1
0%

Fontana D

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 42.46 1 1 0
100%
1 BHK 44.62 1 0 1
0%
1 BHK 50.92 19 0 19
0%
1 BHK 52.4 17 17 0
100%
1 HALF BHK 51.56 1 1 0
100%
1 HALF BHK 52.39 28 28 0
100%
1 HALF BHK 55.09 1 1 0
100%
2 HALF BHK 82.47 2 0 2
0%

Fontana E

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.87 2 2 0
100%
1 BHK 38.67 7 0 7
0%
1 BHK 39.76 41 41 0
100%
1 BHK 39.79 14 14 0
100%
1 BHK 41.25 4 4 0
100%
1 BHK 42.51 2 0 2
0%
1 BHK 43.69 8 0 8
0%
1 BHK 44.39 2 0 2
0%
1 BHK 44.95 6 6 0
100%
1 BHK 44.97 2 2 0
100%
1 BHK 45.56 12 0 12
0%
1 BHK 46.88 3 3 0
100%
1 BHK 46.92 1 1 0
100%
1 BHK 49.5 1 0 1
0%
1 BHK 50.84 1 0 1
0%

Fontana F

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.84 1 1 0
100%
1 BHK 34.87 1 1 0
100%
1 BHK 38.67 6 0 6
0%
1 BHK 39.76 26 26 0
100%
1 BHK 39.79 30 30 0
100%
1 BHK 41.25 4 4 0
100%
1 BHK 42.51 2 0 2
0%
1 BHK 43.69 10 0 10
0%
1 BHK 44.39 1 0 1
0%
1 BHK 44.95 6 6 0
100%
1 BHK 45.56 14 0 14
0%
1 BHK 45.67 1 1 0
100%
1 BHK 46.88 2 2 0
100%
1 BHK 49.5 1 0 1
0%
1 BHK 50.84 1 0 1
0%

Fontana G

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 42.46 1 1 0
100%
1 BHK 44.62 1 0 1
0%
1 BHK 50.92 17 0 17
0%
1 BHK 52.4 17 17 0
100%
1 HALF BHK 51.6 1 1 0
100%
1 HALF BHK 52.39 30 30 0
100%
1 HALF BHK 55.09 1 1 0
100%
2 HALF BHK 82.47 2 0 2
0%

Fontana H

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.84 1 1 0
100%
1 BHK 34.87 1 1 0
100%
1 BHK 38.67 6 0 6
0%
1 BHK 39.76 30 30 0
100%
1 BHK 39.79 26 26 0
100%
1 BHK 41.25 4 4 0
100%
1 BHK 42.51 1 0 1
0%
1 BHK 43.69 10 0 10
0%
1 BHK 43.74 1 1 0
100%
1 BHK 44.39 2 0 2
0%
1 BHK 44.95 5 5 0
100%
1 BHK 44.97 1 1 0
100%
1 BHK 45.56 14 0 14
0%
1 BHK 46.88 2 2 0
100%
1 BHK 49.5 1 0 1
0%
1 BHK 50.84 1 0 1
0%

Construction Progress

FONTANA C

Basement (if any)100%

Fontana C

Excavation100%

FONTANA C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Fontana C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

FONTANA C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Fontana C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

FONTANA C

Plinth100%
Podiums (if any) 0%

Fontana C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

FONTANA C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Fontana C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

FONTANA C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Fontana C

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

FONTANA D

Basement (if any)100%

Fontana D

Excavation100%

FONTANA D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Fontana D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

FONTANA D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Fontana D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

FONTANA D

Plinth100%
Podiums (if any) 0%

Fontana D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

FONTANA D

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Fontana D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

FONTANA D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Fontana D

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

FONTANA E

Basement (if any)100%

Fontana E

Excavation100%

FONTANA E

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Fontana E

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

FONTANA E

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Fontana E

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

FONTANA E

Plinth100%
Podiums (if any) 0%

Fontana E

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

FONTANA E

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Fontana E

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

FONTANA E

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Fontana E

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

FONTANA F

Basement (if any)100%

Fontana F

Excavation100%

FONTANA F

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Fontana F

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

FONTANA F

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Fontana F

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

FONTANA F

Plinth100%
Podiums (if any) 0%

Fontana F

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

FONTANA F

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Fontana F

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

FONTANA F

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Fontana F

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

FONTANA G

Basement (if any)100%

Fontana G

Excavation100%

FONTANA G

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Fontana G

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

FONTANA G

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Fontana G

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

FONTANA G

Plinth100%
Podiums (if any) 0%

Fontana G

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

FONTANA G

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Fontana G

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

FONTANA G

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Fontana G

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

FONTANA H

Basement (if any)100%

Fontana H

Excavation100%

FONTANA H

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Fontana H

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

FONTANA H

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Fontana H

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

FONTANA H

Plinth100%
Podiums (if any) 0%

Fontana H

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

FONTANA H

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Fontana H

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

FONTANA H

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Fontana H

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Club House 100%
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Sports Complex 100%
Storm Water Drains 100%
Street Lighting 100%
Temple 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Woodland Park
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.