PALAVA LAKESIDE A to H

by Palava Dwellers Private Limited Company
Certificate Signed P51700000384
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700000384
Registration No.
REA51700002986
Registration Date
2018-10-11
Developer
Palava Dwellers Private Limited Company
Architect
Vilas Desai & Associates
Project Bank
HDFC BANK
Proposed Possession
2018-07-31
Revised Possession
2018-07-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
8
Project Area
8495.00 sq.m
Total FSI
56034.95
Approved FSI
53496.95
MahaRERA QR
PALAVA LAKESIDE A to H
MahaRERA — P51700000384
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors18
Sanctioned18
🚗Open Parking13
🅿️Closed Parking96
📅Completion2018-07-31
🏗️Proposed Floors18
Sanctioned18
🚗Open Parking13
🅿️Closed Parking96
📅Completion2018-07-31
🏗️Proposed Floors18
Sanctioned18
🚗Open Parking13
🅿️Closed Parking96
📅Completion2018-07-31
🏗️Proposed Floors18
Sanctioned18
🚗Open Parking14
🅿️Closed Parking95
📅Completion2018-07-31
🏗️Proposed Floors18
Sanctioned18
🚗Open Parking14
🅿️Closed Parking95
📅Completion2018-07-31
🏗️Proposed Floors18
Sanctioned18
🚗Open Parking13
🅿️Closed Parking60
📅Completion2018-07-31
🏗️Proposed Floors18
Sanctioned18
🚗Open Parking13
🅿️Closed Parking60
📅Completion2018-07-31
🏗️Proposed Floors18
Sanctioned18
🚗Open Parking13
🅿️Closed Parking96
📅Completion2018-07-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 40.5099983215332 0 0 0
0%
1Bhk 51.93000030517578 0 0 0
0%
2Bhk 40.5099983215332 0 0 0
0%
2Bhk 51.91999816894531 0 0 0
0%
2Bhk 51.93000030517578 0 0 0
0%
2Bhk 52.86000061035156 0 0 0
0%
2Bhk 53.880001068115234 0 0 0
0%
2Bhk 54.220001220703125 0 0 0
0%
2Bhk 54.22999954223633 0 0 0
0%
2Bhk 54.2599983215332 0 0 0
0%
2Bhk 54.439998626708984 0 0 0
0%
2Bhk 55.68000030517578 0 0 0
0%
2Bhk 55.689998626708984 0 0 0
0%
2Bhk 55.84000015258789 0 0 0
0%
2Bhk 55.86000061035156 0 0 0
0%
2Bhk 55.90999984741211 0 0 0
0%
2Bhk 55.93000030517578 0 0 0
0%
2Bhk 56.040000915527344 0 0 0
0%
2Bhk 56.11000061035156 0 0 0
0%
2Bhk 56.540000915527344 0 0 0
0%
2Bhk 56.58000183105469 0 0 0
0%
2Bhk 57.349998474121094 0 0 0
0%
2Bhk 57.369998931884766 0 0 0
0%
2Bhk 57.54999923706055 0 0 0
0%
2Bhk 57.56999969482422 0 0 0
0%
2Bhk 57.599998474121094 0 0 0
0%
2Bhk 57.900001525878906 0 0 0
0%
2Bhk 57.970001220703125 0 0 0
0%
2Bhk 58.41999816894531 0 0 0
0%
2Bhk 58.439998626708984 0 0 0
0%
2Bhk 59.459999084472656 0 0 0
0%
2Bhk 59.5 0 0 0
0%
2Bhk 60.0 0 0 0
0%
2Bhk 60.029998779296875 0 0 0
0%
2Bhk 60.65999984741211 0 0 0
0%
2Bhk 60.75 0 0 0
0%
2Bhk 60.779998779296875 0 0 0
0%
2Bhk 61.11000061035156 0 0 0
0%
2Bhk 61.5 0 0 0
0%
2Bhk 61.650001525878906 0 0 0
0%
2Bhk 61.790000915527344 0 0 0
0%
2Bhk 61.84000015258789 0 0 0
0%
2Bhk 61.869998931884766 0 0 0
0%
2Bhk 62.130001068115234 0 0 0
0%
2Bhk 62.13999938964844 0 0 0
0%
2Bhk 62.150001525878906 0 0 0
0%
2Bhk 62.15999984741211 0 0 0
0%
2Bhk 62.25 0 0 0
0%
2Bhk 62.45000076293945 0 0 0
0%
2Bhk 63.810001373291016 0 0 0
0%
2Bhk 65.4000015258789 0 0 0
0%
2Bhk 66.80000305175781 0 0 0
0%
2Bhk 68.69000244140625 0 0 0
0%
2Bhk 69.12000274658203 0 0 0
0%
2Bhk 90.68000030517578 0 0 0
0%
3Bhk 72.06999969482422 0 0 0
0%
3Bhk 72.08999633789062 0 0 0
0%
3Bhk 72.19999694824219 0 0 0
0%
3Bhk 72.27999877929688 0 0 0
0%
3Bhk 73.76000213623047 0 0 0
0%
3Bhk 73.86000061035156 0 0 0
0%
3Bhk 74.68000030517578 0 0 0
0%
3Bhk 75.79000091552734 0 0 0
0%
3Bhk 75.80999755859375 0 0 0
0%
3Bhk 75.91999816894531 0 0 0
0%
3Bhk 77.4800033569336 0 0 0
0%
3Bhk 87.51000213623047 0 0 0
0%
3Bhk 90.66999816894531 0 0 0
0%

Lakeside A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 51.92 1 1 0
100%
2 BHK 53.88 1 1 0
100%
2 BHK 54.22 1 1 0
100%
2 BHK 54.23 4 4 0
100%
2 BHK 54.26 3 3 0
100%
2 BHK 54.44 8 8 0
100%
2 BHK 55.69 1 0 1
0%
2 BHK 55.84 7 7 0
100%
2 BHK 55.86 1 1 0
100%
2 BHK 55.93 1 1 0
100%
2 BHK 56.04 8 8 0
100%
2 BHK 56.58 2 2 0
100%
2 BHK 61.5 2 2 0
100%
2 BHK 61.79 14 14 0
100%
2 BHK 61.84 14 14 0
100%
2 BHK 61.87 2 2 0
100%
2 BHK 62.13 31 31 0
100%
2 BHK 62.15 2 2 0
100%
2 BHK 63.81 1 0 1
0%
3 BHK 87.51 2 2 0
100%

Lakeside B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 51.93 1 1 0
100%
2 BHK 52.86 1 1 0
100%
2 BHK 53.88 1 1 0
100%
2 BHK 54.23 2 2 0
100%
2 BHK 54.26 2 2 0
100%
2 BHK 54.44 7 7 0
100%
2 BHK 55.68 1 0 1
0%
2 BHK 55.69 4 0 4
0%
2 BHK 55.84 1 1 0
100%
2 BHK 55.86 1 1 0
100%
2 BHK 55.91 1 0 1
0%
2 BHK 55.93 3 3 0
100%
2 BHK 56.04 2 2 0
100%
2 BHK 56.11 3 3 0
100%
2 BHK 56.54 1 1 0
100%
2 BHK 57.35 4 0 4
0%
2 BHK 57.55 3 0 3
0%
2 BHK 60.66 2 0 2
0%
2 BHK 60.75 2 2 0
100%
2 BHK 61.5 2 2 0
100%
2 BHK 61.79 12 12 0
100%
2 BHK 61.84 12 12 0
100%
2 BHK 61.87 3 3 0
100%
2 BHK 62.13 29 29 0
100%
2 BHK 62.15 6 6 0
100%

Lakeside C

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 51.93 1 1 0
100%
2 BHK 52.86 1 1 0
100%
2 BHK 53.88 1 1 0
100%
2 BHK 54.22 1 1 0
100%
2 BHK 54.23 2 2 0
100%
2 BHK 54.26 2 2 0
100%
2 BHK 54.44 6 6 0
100%
2 BHK 55.69 4 0 4
0%
2 BHK 55.86 1 1 0
100%
2 BHK 55.91 2 0 2
0%
2 BHK 55.93 4 4 0
100%
2 BHK 56.11 3 3 0
100%
2 BHK 56.58 1 1 0
100%
2 BHK 57.35 4 0 4
0%
2 BHK 57.55 5 0 5
0%
2 BHK 61.5 2 2 0
100%
2 BHK 61.79 15 15 0
100%
2 BHK 61.84 14 14 0
100%
2 BHK 61.87 2 2 0
100%
2 BHK 62.13 29 29 0
100%
2 BHK 62.15 5 5 0
100%
2 BHK 63.81 1 0 1
0%

Lakeside D

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 51.93 1 1 0
100%
2 BHK 52.86 1 1 0
100%
2 BHK 54.22 1 1 0
100%
2 BHK 54.23 8 8 0
100%
2 BHK 54.44 8 8 0
100%
2 BHK 55.84 6 6 0
100%
2 BHK 56.04 3 3 0
100%
2 BHK 56.58 1 1 0
100%
2 BHK 57.35 2 0 2
0%
2 BHK 57.37 1 0 1
0%
2 BHK 57.55 5 0 5
0%
2 BHK 61.5 2 2 0
100%
2 BHK 61.79 15 15 0
100%
2 BHK 61.84 13 13 0
100%
2 BHK 61.87 2 2 0
100%
2 BHK 62.13 32 32 0
100%
2 BHK 62.15 2 2 0
100%
2 BHK 68.69 1 0 1
0%
2 BHK 90.68 1 0 1
0%

Lakeside E

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 52.86 1 1 0
100%
2 BHK 56.58 1 1 0
100%
2 BHK 57.6 1 1 0
100%
2 BHK 57.9 3 3 0
100%
2 BHK 57.97 2 2 0
100%
2 BHK 58.42 5 5 0
100%
2 BHK 58.44 1 1 0
100%
2 BHK 59.46 4 0 4
0%
2 BHK 59.5 9 9 0
100%
2 BHK 60.0 2 0 2
0%
2 BHK 60.03 8 8 0
100%
2 BHK 61.5 2 2 0
100%
2 BHK 61.79 14 14 0
100%
2 BHK 61.87 2 2 0
100%
2 BHK 62.13 28 28 0
100%
2 BHK 62.14 3 3 0
100%
2 BHK 62.15 4 4 0
100%
2 BHK 62.16 14 14 0
100%
2 BHK 62.25 1 1 0
100%

Lakeside F

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 40.51 1 0 1
0%
2 BHK 65.4 1 1 0
100%
2 BHK 69.12 1 1 0
100%
3 BHK 72.07 14 14 0
100%
3 BHK 72.09 1 1 0
100%
3 BHK 72.2 14 14 0
100%
3 BHK 72.28 1 1 0
100%
3 BHK 73.76 1 1 0
100%
3 BHK 74.68 2 0 2
0%
3 BHK 75.79 13 13 0
100%
3 BHK 75.81 5 5 0
100%
3 BHK 75.92 16 16 0
100%
3 BHK 77.48 1 1 0
100%

Lakeside G

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 40.51 1 0 1
0%
2 BHK 65.4 1 1 0
100%
2 BHK 66.8 1 1 0
100%
2 BHK 69.12 1 1 0
100%
3 BHK 72.07 13 13 0
100%
3 BHK 72.09 2 2 0
100%
3 BHK 72.2 14 14 0
100%
3 BHK 72.28 1 1 0
100%
3 BHK 73.86 1 1 0
100%
3 BHK 74.68 2 0 2
0%
3 BHK 75.79 15 15 0
100%
3 BHK 75.81 3 3 0
100%
3 BHK 75.92 16 16 0
100%

Lakeside H

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 52.86 1 1 0
100%
2 BHK 56.58 1 1 0
100%
2 BHK 57.57 1 1 0
100%
2 BHK 57.9 9 9 0
100%
2 BHK 58.42 8 8 0
100%
2 BHK 59.5 5 5 0
100%
2 BHK 60.03 5 5 0
100%
2 BHK 60.78 1 0 1
0%
2 BHK 61.11 4 0 4
0%
2 BHK 61.5 2 2 0
100%
2 BHK 61.65 3 0 3
0%
2 BHK 61.79 12 12 0
100%
2 BHK 61.87 3 3 0
100%
2 BHK 62.13 27 27 0
100%
2 BHK 62.15 6 6 0
100%
2 BHK 62.16 15 15 0
100%
2 BHK 62.45 2 2 0
100%
3 BHK 90.67 1 0 1
0%

Construction Progress

LAKESIDE A

Basement (if any)100%

Lakeside A

Excavation100%

LAKESIDE A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Lakeside A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

LAKESIDE A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Lakeside A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

LAKESIDE A

Plinth100%
Podiums (if any) 0%

Lakeside A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

LAKESIDE A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Lakeside A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

LAKESIDE A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Lakeside A

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

LAKESIDE B

Basement (if any)100%

Lakeside B

Excavation100%

LAKESIDE B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Lakeside B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

LAKESIDE B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Lakeside B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

LAKESIDE B

Plinth100%
Podiums (if any) 0%

Lakeside B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

LAKESIDE B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Lakeside B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

LAKESIDE B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Lakeside B

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

LAKESIDE C

Basement (if any)100%

Lakeside C

Excavation100%

LAKESIDE C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Lakeside C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

LAKESIDE C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Lakeside C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

LAKESIDE C

Plinth100%
Podiums (if any) 0%

Lakeside C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

LAKESIDE C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Lakeside C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

LAKESIDE C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Lakeside C

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

LAKESIDE D

Basement (if any)100%

Lakeside D

Excavation100%

LAKESIDE D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Lakeside D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

LAKESIDE D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Lakeside D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

LAKESIDE D

Plinth100%
Podiums (if any) 0%

Lakeside D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

LAKESIDE D

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Lakeside D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

LAKESIDE D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Lakeside D

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

LAKESIDE E

Basement (if any)100%

Lakeside E

Excavation100%

LAKESIDE E

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Lakeside E

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

LAKESIDE E

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Lakeside E

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

LAKESIDE E

Plinth100%
Podiums (if any) 0%

Lakeside E

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

LAKESIDE E

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Lakeside E

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

LAKESIDE E

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Lakeside E

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

LAKESIDE F

Basement (if any)100%

Lakeside F

Excavation100%

LAKESIDE F

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Lakeside F

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

LAKESIDE F

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Lakeside F

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

LAKESIDE F

Plinth100%
Podiums (if any) 0%

Lakeside F

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

LAKESIDE F

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Lakeside F

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

LAKESIDE F

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Lakeside F

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

LAKESIDE G

Basement (if any)100%

Lakeside G

Excavation100%

LAKESIDE G

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Lakeside G

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

LAKESIDE G

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Lakeside G

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

LAKESIDE G

Plinth100%
Podiums (if any) 0%

Lakeside G

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

LAKESIDE G

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Lakeside G

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

LAKESIDE G

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Lakeside G

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

LAKESIDE H

Basement (if any)100%

Lakeside H

Excavation100%

LAKESIDE H

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Lakeside H

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

LAKESIDE H

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Lakeside H

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

LAKESIDE H

Plinth100%
Podiums (if any) 0%

Lakeside H

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

LAKESIDE H

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Lakeside H

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

LAKESIDE H

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Lakeside H

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Clubhouse 100%
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Sports Complex 100%
Storm Water Drains 100%
Street Lighting 100%
Temple 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Woodland Park 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.