📞 +91 98200 30685 ✉️
RERA: A51800043517

PALAVA URBANO G AND H

by Lodha Developers Limited Company
Certificate Signed P51700000696
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700000696
Registration No.
REA51700004921
Registration Date
2021-09-09
Developer
Lodha Developers Limited Company
Architect
Vilas Desai & Associates
Project Bank
HDFC BANK
Proposed Possession
2022-12-30
Revised Possession
2022-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
2360.00 sq.m
Total FSI
12220.48
Approved FSI
12041.48
MahaRERA QR
PALAVA URBANO G AND H
MahaRERA — P51700000696
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors18
Sanctioned18
🚗Open Parking16
🅿️Closed Parking73
📅Completion2021-12-31
🏗️Proposed Floors18
Sanctioned18
🚗Open Parking16
🅿️Closed Parking90
📅Completion2021-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 48.38999938964844 0 0 0
0%
2Bhk 52.68000030517578 0 0 0
0%
2Bhk 54.279998779296875 0 0 0
0%
2Bhk 55.099998474121094 0 0 0
0%
2Bhk 55.70000076293945 0 0 0
0%
2Bhk 56.790000915527344 0 0 0
0%
2Bhk 57.279998779296875 0 0 0
0%
2Bhk 57.900001525878906 0 0 0
0%
2Bhk 57.970001220703125 0 0 0
0%
2Bhk 58.54999923706055 0 0 0
0%
2Bhk 61.0 0 0 0
0%
2Bhk 63.58000183105469 0 0 0
0%
2Bhk 65.0999984741211 0 0 0
0%
2Bhk 70.9000015258789 0 0 0
0%
2Bhk 71.33999633789062 0 0 0
0%
2Bhk 71.9800033569336 0 0 0
0%
2Bhk 72.0 0 0 0
0%
2Bhk 73.77999877929688 0 0 0
0%
3Bhk 76.30999755859375 0 0 0
0%
3Bhk 76.43000030517578 0 0 0
0%
5Bhk &Amp;Amp; More 109.69999694824219 0 0 0
0%
5Bhk &Amp;Amp; More 110.83999633789062 0 0 0
0%

Urbano G

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 63.58 1 0 1
0%
2 BHK 65.1 1 0 1
0%
2 BHK 70.9 14 0 14
0%
2 BHK 71.34 1 0 1
0%
2 BHK 71.98 42 42 0
100%
2 BHK 72.0 7 7 0
100%
2 BHK 73.78 1 0 1
0%
3 BHK 76.31 1 1 0
100%
5 BHK & more 109.7 1 0 1
0%
5 BHK & more 110.84 1 1 0
100%

Urbano H

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 48.39 1 0 1
0%
2 BHK 52.68 1 1 0
100%
2 BHK 54.28 1 0 1
0%
2 BHK 55.1 15 0 15
0%
2 BHK 55.7 1 1 0
100%
2 BHK 56.79 17 0 17
0%
2 BHK 57.28 31 0 31
0%
2 BHK 57.9 7 7 0
100%
2 BHK 57.97 24 24 0
100%
2 BHK 58.55 1 0 1
0%
2 BHK 61.0 4 0 4
0%
3 BHK 76.43 2 0 2
0%

Construction Progress

URBANO G

Basement (if any)100%

Urbano G

Excavation100%

URBANO G

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Urbano G

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

URBANO G

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Urbano G

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

URBANO G

Plinth100%
Podiums (if any) 0%

Urbano G

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

URBANO G

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Urbano G

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

URBANO G

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Urbano G

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

URBANO H

Basement (if any)100%

Urbano H

Excavation100%

URBANO H

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Urbano H

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

URBANO H

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Urbano H

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

URBANO H

Plinth100%
Podiums (if any) 0%

Urbano H

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

URBANO H

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Urbano H

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

URBANO H

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Urbano H

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Club House 100%
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Sports Complex 100%
Storm Water Drains 100%
Street Lighting 100%
Temple 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Woodland Park
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.